📍 Broward County, FL · ADU & Garage Conversion

ADU & Garage Conversions — Licensed GC, Fully Permitted

From garage conversion to fully detached accessory dwelling unit. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Broward County code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Broward County
Serving Fort Lauderdale · Hollywood · Pembroke Pines · Coral Springs · Miramar · Davie · Plantation · Sunrise · Deerfield Beach · Pompano Beach and all of Broward County
Florida Licensed GC · CGC1531095
Design + Permits Included
Certificate of Occupancy Goal
Written Scope · Fixed Price
★★★★★ 5-Star Rated
Before ADU before — framing stage, Broward County
After Completed ADU — modern detached unit, D&Co Homes, Broward County

How it works

From idea to certificate of occupancy

ADUs involve zoning review, architectural drawings, engineering, multiple permit departments, and a final CO inspection. We manage the entire process under one contract — you don't project-manage it.

01

Feasibility & vision

We review your lot, zoning, setbacks, utility connections, and HOA restrictions before you spend a dollar on drawings. We tell you what's buildable before anyone gets excited about floor plans.

02

Design & permit

Architectural drawings, structural engineering, and permit submission. We manage the back-and-forth with the Building Division, Zoning, and any required HOA approvals. Permit fees included in written scope.

03

Construction

Foundation, framing, roofing, electrical, plumbing, insulation, drywall, flooring, kitchen or kitchenette, bathroom — all trades coordinated under our GC license.

04

CO & handoff

Final inspections across all trades, CO issued by the county. You receive a completed, legal dwelling unit with a certificate of occupancy — ready to rent or move family in.

What we build in Broward County

ADU types — from garage conversion to detached build

Garage conversions are the fastest and most cost-effective ADU option in Broward County. Detached ADUs on large lots offer more flexibility and rental income potential. We build both.

Garage conversion

Convert your existing attached or detached garage into a legal, permitted living space. We handle the floor leveling, insulation upgrade, mini-split HVAC, electrical panel sub-feed, plumbing rough-in for a kitchenette and bathroom, and CO application. Most efficient ADU path in Broward County.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A standalone dwelling unit built on your lot — separate from the main house. New foundation, full mechanical systems, its own utility connections, kitchen, bathroom, and CO. Best option for maximizing rental income or creating a fully independent living space for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Already have a builder but need help getting through the Broward County permit process? We provide architectural drawings, engineering, HOA approval coordination, permit submission, and project management through CO — without doing the construction ourselves.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Broward County 2026

ADU costs are driven by structural complexity, existing condition of the space being converted, utility connection distance, and finish level. These ranges include design, permits, and CO — not just construction. We quote the total project cost in writing before you commit.

$40K – $65K
Garage conversion

Existing structure

Convert an attached or detached garage into a legal ADU. Fastest path to a CO'd unit in Broward County — existing structure, existing roof, existing footprint.

  • Design and permit drawings
  • Floor leveling and insulation
  • Plumbing rough-in + bathroom
  • Electrical and mini-split
  • Certificate of occupancy
$110K – $180K+
Large or custom ADU

Full dwelling unit

750–1,200+ sq ft detached ADU with full kitchen, 1–2 bedrooms, 1–2 bathrooms, laundry hookup, and high-spec finishes. Designed for long-term rental income or a permanent family suite.

  • Up to 1,200 sq ft
  • 1–2 bed / 1–2 bath
  • Full kitchen with appliances
  • Washer / dryer hookup
  • Premium finishes
  • Full CO and documentation

Broward County · What property owners need to know

Why ADU permitting in Broward County requires a licensed GC

ADU projects in Broward County touch every trade and every permit department. The process takes months and requires coordination that a handyman or unlicensed contractor simply cannot legally perform.

Multiple Permit Types Required

An ADU typically requires a building permit, electrical permit, plumbing permit, and mechanical permit — all submitted and managed separately. Under a licensed GC permit, we pull all of these under one contract. The county inspects each trade separately. Without a GC managing this, homeowners end up coordinating 4+ separate contractor permits and inspections — and the CO doesn't issue until all of them close.

Zoning & Setback Rules Vary by City

ADU regulations in Broward County vary significantly between unincorporated county land, Fort Lauderdale, Hollywood, Coral Springs, Pembroke Pines, and other municipalities. Minimum lot size, setbacks, max square footage, and utility connection requirements are all different. We research the specific rules for your parcel before we quote — not after you've already paid for drawings that don't meet code.

HOA Restrictions

Many Broward County communities — especially condo and townhome associations, which are more common here than in Palm Beach — have restrictions on ADU construction, including setbacks from property lines, exterior materials, roofline requirements, and sometimes outright prohibitions. We review your HOA or condo association documents and CC&Rs before any money is spent on design. Building without approval is a covenant violation with real legal exposure.

Utility Connection Complexity

Detached ADUs require electrical service (new sub-panel or meter), water connection, and sewer tap. In Broward County, sewer tap fees alone can run $3,000–$12,000 depending on municipality. We include a utility connection cost assessment in the written scope — not a rough estimate. You know what the sewer tap costs before you sign anything.

The CO is What Matters

The certificate of occupancy is what makes an ADU legal to rent or occupy. Unpermitted "in-law suites" have no legal standing and create serious liability when you sell or insure the property. Every ADU we build targets a CO at close-out. The permit timeline is managed by us, and we don't consider a project finished until the CO is in your hands.

One Contract, Soup to Nuts

We provide architectural drawings, manage the permit, coordinate all trades, and deliver the CO. You have one contract and one point of contact — not a separate architect, engineer, plumber, electrician, and framer you hired off Craigslist. That's the value of a design-build licensed GC for a project this complex, now available across Broward County.

On the Ground in Broward County

What ADU builders navigate in Broward County

We bring the same feasibility-first ADU process we built in Palm Beach County to Broward. Here is what shapes every project in this county.

Zoning by Jurisdiction

  • Broward County unincorporated: ADUs allowed on qualifying lots with appropriate zoning
  • City of Fort Lauderdale: ADU ordinance with specific design and setback standards
  • City of Hollywood: ADUs permitted; city-specific design standards apply
  • Coral Springs and Pembroke Pines: each run separate application processes through city planning
  • Davie and Plantation: each has separate ADU ordinances — confirm before designing

Typical Timeline

  • Feasibility + zoning review: 1–2 weeks
  • Architectural drawings + engineering: 4–8 weeks
  • Permit submission and review: 4–12 weeks (varies by jurisdiction)
  • Construction — garage conversion: 8–14 weeks
  • Construction — detached ADU: 16–28 weeks
  • Final inspections + CO: 1–3 weeks after construction complete

Cost Variables to Know

  • Sewer tap fees: $3,000–$12,000 depending on municipality
  • Impact fees: $5,000–$18,000 for new detached ADU in Broward County
  • Architectural drawings: $4,000–$12,000 (included in our scope)
  • Structural engineering: $2,000–$6,000 (included in our scope)
  • Permit fees: $1,500–$6,000 (included in our scope)

Common Use Cases

  • Rental income unit — single-family neighborhoods in Miramar, Pembroke Pines, Davie
  • In-law or family suite — Fort Lauderdale and Plantation primary homes
  • Home office + guest space combo — Coral Springs and Weston
  • Investment property ADU add — increasingly common given Broward's strong rental market

The most common reason an ADU project stalls in Broward County is a zoning or association issue discovered after the homeowner has already paid for drawings. We spend the first 1–2 weeks on feasibility — lot coverage, setbacks, minimum lot size, utility capacity, and HOA or condo association review — before anyone draws a line. That's not extra overhead; it's the difference between a project that happens and one that dies after $15,000 in sunk design costs.

Impact fees and utility connection costs are the other surprise that low estimates omit. A detached ADU in Broward County can trigger $8,000–$18,000 in impact fees and $4,000–$12,000 in sewer tap fees — costs that have nothing to do with construction and everything to do with municipal infrastructure. We identify every fee in writing before you sign, whether the project is in Fort Lauderdale or Weston. No surprises at permit issuance.

Service Area

ADU & garage conversions throughout Broward County

From Deerfield Beach to Miramar — Broward County is our newest market, backed by 14+ years of licensed GC experience in South Florida.

Fort LauderdaleHollywoodPembroke PinesCoral SpringsMiramarDaviePlantationSunriseDeerfield BeachPompano BeachWestonTamarac
Real South Florida Clients

What property owners say about our ADU work

Verified reviews from ADU and garage conversion projects across South Florida.

★★★★★

"Dariceli told us upfront that our HOA would need to approve before any drawings were started. We got approval first, then permitted, then built. CO in hand 7 months after we first called. The process was exactly what she described."

KP

Karen P.

Palm Beach Gardens — Detached ADU, 640 sq ft

★★★★★

"Garage conversion in Lake Worth. D&Co handled the drawings, the permit, all the trades, and the CO. My son moved in within 4 months. The biggest thing was knowing the full cost upfront — no surprises on impact fees or utility hookups."

FG

Frank G.

Lake Worth — Garage Conversion to ADU

★★★★★

"I rent the unit out for $2,100/month. The total project cost was $78,000. I had two other contractors tell me they 'couldn't guarantee a CO.' D&Co was the only one who built it into the contract. That mattered more than the price."

RN

Rachel N.

Boynton Beach — Detached ADU, 520 sq ft rental

Common questions

What Broward homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Broward County.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com