📍 Coral Springs, FL · ADU & Garage Conversion

Coral Springs ADU & Garage Conversions — LDC §250129, Fully Permitted

Whether it's a garage conversion or a new detached accessory dwelling unit, we take it from first sketch to CO. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Broward County code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Coral Springs

Free ADU Consultation

Get a Fast, No-Obligation Quote

Just your name and number — we'll call you back, usually within 24 hours.

No spam. We respond fast.

Serving Fort Lauderdale · Hollywood · Pembroke Pines · Coral Springs · Miramar · Davie · Plantation · Sunrise · Deerfield Beach · Pompano Beach and all of Broward County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
Exterior Example ADU exterior finish, representative style for Broward County
Interior Example ADU interior finish, representative style for Broward County

Representative example finishes for illustration — not a specific completed project.

How it works

The path from lot to certificate of occupancy

Each ADU follows the same four phases. What changes from property to property is how long each phase takes, and that depends on zoning, the permit office, and the site.

01

Lot and zoning check

We review the property, local zoning, setbacks, utility connections, and HOA documents so the plan starts from facts.

02

Drawings and permit

Plans and structural engineering are prepared and filed. We manage permit review, including correction requests, with permit fees covered by your written scope.

03

Construction

Our team builds the unit and brings in licensed trades for electrical, plumbing, and mechanical work, all on one schedule.

04

Inspections and CO

Each trade is inspected and the certificate of occupancy is issued before we call the job complete.

What we build in Broward County

From garage to guest house: your ADU options

Broward County homeowners usually weigh two paths. Converting a garage is simpler and less expensive. Building a detached unit takes longer but gives more space. We offer both.

Garage conversion

The scope covers a new level floor, insulated walls and ceiling, mini-split air conditioning, a sub-panel, rough plumbing for kitchenette and bath, and getting the CO issued. It is often the easiest ADU to approve and build in Broward County.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

Separate building, new foundation, complete mechanical systems, own utility service, kitchen, bathroom, and CO. A good match for owners focused on income or a private home for relatives.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

We also support owners who have their own builder. For Broward County properties we prepare the plans and engineering, coordinate with the HOA, file the permit, and manage the project to the CO.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Broward County 2026

What you pay depends on how complicated the structure is, the state of the existing space, how far utilities need to run, and the finishes you pick. Each range here includes design, permitting, and the CO. You receive one written total before signing.

$40K – $65K
Garage conversion

Garage to ADU

Because the structure already exists, a conversion in Broward County usually has the shortest timeline and lowest cost of any ADU.

  • Plans and permit submission
  • New floor, insulation
  • Kitchenette and bath plumbing
  • Sub-panel and mini-split HVAC
  • CO issued at close-out
$110K – $180K+
Large or custom ADU

Detached full-size unit

750–1,200+ sq ft detached ADU with a full kitchen, one to two bedrooms, one to two bathrooms, laundry hookup, and high-spec finishes, designed for long-term rental or a family suite.

  • Large footprint design
  • One or two bedrooms and baths
  • Kitchen with appliances
  • Laundry hookup
  • Upgraded finishes
  • CO and closeout file

Broward County · Property owner guide

Hiring a licensed GC for a Broward County ADU

Broward County began permitting ADUs in 2023, limited to certain zoning districts and subject to size caps and owner occupancy. The zoning review is where projects either start right or go wrong.

Three Agencies, One Permit: 10–13 Months

Coral Springs ADU permitting runs through LDC Section 250129 and requires sign-off from three separate agencies — the City Building Department, the Coral Springs Improvement District (CSID), and Broward County Environmental Protection Division — with a total timeline that typically runs 10 to 13 months. Applicable zoning districts are RS-1, RS-3, RS-4, and RS-5/RS-6. We manage all three approvals in parallel wherever possible, instead of letting them run sequentially against your timeline.

Hurricane Zone: Up to 170 mph

As part of Florida's High-Velocity Hurricane Zone, Broward projects are designed for wind speeds as high as 170 mph depending on exposure and coastal distance. All windows, doors, garage doors, and roofing need a Miami-Dade or Broward NOA. Non-rated products can't be installed, so we put compliant products in the first set of drawings.

Strictest Design-Match Rule in Broward

Coral Springs requires the ADU's height, roof pitch, exterior materials, window styles, and colors to match the primary residence — a stricter architectural-matching mandate than most Broward cities enforce. The primary dwelling must already be built before an ADU can be permitted. We design to this standard from the first drawing, not as a correction after plan review rejects it.

Sewer Tap: $3,000–$12,000

If you build a detached unit, you'll need an electrical sub-panel or meter, a water connection, and a sewer tap. In Broward the tap alone costs $3,000–$12,000 depending on the serving city's utility. We state the number in your contract scope.

Legal to Rent Only With a CO

Without a certificate of occupancy, an ADU can't be legally rented, may cause trouble at resale, and might jeopardize your homeowner's policy. Each Broward County ADU we build is aimed at the CO, and we handle the permit schedule until it's issued.

One Contract, One Contact

Our contract includes zoning confirmation, drawings, permit submittal, trade coordination, and the CO. That replaces the architect-engineer-plumber-electrician-framer chain you would otherwise manage. It's the design-build advantage, available throughout Broward County.

On the Ground in Coral Springs

What ADU builders navigate in Coral Springs

We bring the same feasibility-first ADU process we built across Broward County to Coral Springs's three-agency review. Here is what shapes every project in this city.

LDC §250129 Requirements

  • Permitted in RS-1, RS-3, RS-4, and RS-5/RS-6 zoning districts
  • ADU height cannot exceed the primary dwelling's height
  • Must match roof pitch, exterior materials, window styles, and colors
  • Three-agency review: City, CSID, and Broward County Environmental Protection
  • Reviewed by Planning & Zoning Division, (954) 344-1160

Schedule at a Glance

  • Zoning review and a feasibility pass: 1–2 weeks
  • Design: architectural and engineering drawings, 4–8 weeks
  • Submittal through permit approval: 4–12 weeks (varies by jurisdiction)
  • Garage-to-ADU construction: 8–14 weeks
  • Construction for a detached ADU runs 16–28 weeks
  • Final sign-off and CO: 1–3 weeks following construction

Cost Factors

  • Expect $3,000–$12,000 for the sewer tap
  • In Broward County, impact fees on new detached construction run $5,000–$18,000
  • We cover the architectural drawings, $4,000–$12,000, within our scope
  • Structural engineering, $2,000–$6,000, is part of our scope
  • Building permit costs: $1,500–$6,000, included in our scope

Common Use Cases

  • Rental income unit — single-family neighborhoods in Eagle Trace and Ramblewood
  • In-law or family suite — Cypress Run and Country Club Village primary homes
  • Home office + guest space combo — Westchester and Riverside
  • Investment property ADU add — longer timeline rewards early planning

Coral Springs's biggest trap isn't the building code — it's the clock. Because the permit has to clear three separate agencies instead of one, the first question on every Coral Springs inquiry is how early we can get CSID and county environmental review started in parallel with city plan review, not what the unit will cost. We map that sequence in week one, before a single drawing is started.

Once the agencies are aligned, the HVHZ wind code and the strict design-match rule are what shape the drawings — roof pitch, materials, and color all have to mirror the main house. We price the real number and the real timeline against your specific property before you sign anything.

Service Area

ADU & garage conversions throughout Coral Springs

From Eagle Trace to Ramblewood — Coral Springs is part of our Broward County market, backed by 10+ years of licensed GC experience in South Florida.

Eagle TraceRamblewoodCypress RunCountry Club VillageWestchesterRiverside

Common questions

What Coral Springs homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Broward County.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬