📍 Hollywood, FL · ADU & Garage Conversion

Hollywood ADU & Garage Conversions — CCCL-Aware, Fully Permitted

Convert the garage or build a detached accessory dwelling unit, with design and permitting taken care of. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Broward County code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Hollywood, FL

Free ADU Consultation

Get a Fast, No-Obligation Quote

Just your name and number — we'll call you back, usually within 24 hours.

No spam. We respond fast.

Serving Fort Lauderdale · Hollywood · Pembroke Pines · Coral Springs · Miramar · Davie · Plantation · Sunrise · Deerfield Beach · Pompano Beach and all of Broward County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
Exterior Example ADU exterior finish, representative style for Broward County
Interior Example ADU interior finish, representative style for Broward County

Representative example finishes for illustration — not a specific completed project.

How it works

How an ADU goes from idea to finished unit

You shouldn't have to learn permitting to build a second dwelling. We handle the zoning review, drawings, engineering, trades, and inspections as one connected job.

01

Feasibility

We confirm zoning, setbacks, utility access, and HOA restrictions first, because the best time to find a problem is before the drawings are paid for.

02

Design and permitting

Architectural and structural drawings are prepared, permits are filed, and we stay on top of every reviewer comment. Permit costs are included in your written scope.

03

Building

Foundation or conversion work, framing, roofing, electrical, plumbing, insulation, drywall, flooring, and finishes are scheduled and coordinated by us.

04

Certificate of occupancy

When the last inspection is passed, the CO makes the unit a legal dwelling. Then it is yours to rent or move into.

What we build in Broward County

Garage conversion or new detached ADU?

Both routes end in a certificate of occupancy and a legal dwelling. In Broward County, converting a garage costs less and usually moves faster, while a detached ADU gives you more floor area and flexibility.

Garage conversion

Our conversions include floor leveling, insulation, mini-split HVAC, a panel sub-feed, kitchenette and bathroom plumbing, and the CO paperwork. For many owners in Broward County, this is the most direct route to a legal unit.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A new stand-alone structure with its own foundation, utilities, kitchen, and bath. It suits owners who want long-term rental income or a self-contained home for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Need only the paperwork side? We prepare drawings and engineering, line up HOA approvals, submit permits, and manage the process to CO for projects in Broward County that another contractor will build.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Broward County 2026

ADU pricing varies with structural complexity, the condition of what you are converting, utility distance, and finishes. Every range below already includes design, permits, and the CO, and we give you a single written figure before you commit.

$40K – $65K
Garage conversion

Existing garage

The quickest path to a CO'd ADU in Broward County: no new foundation, no new roof, no new footprint.

  • Permit-ready plans
  • Flooring and insulation upgrade
  • Bathroom and kitchenette plumbing
  • HVAC and electrical work
  • Certificate of occupancy
$110K – $180K+
Large or custom ADU

Premium detached ADU

A 750–1,200+ sq ft detached unit with a full kitchen, one or two bedrooms, one or two baths, laundry hookup, and high-spec finishes for long-term rental income or a family suite.

  • Larger floor plan
  • Bedrooms and baths to suit
  • Full kitchen and appliances
  • Laundry hookup
  • Quality finishes
  • CO and project documents

Broward County · Why it matters

Why Broward County ADUs call for a licensed GC

Broward County rewrote its ADU rules in 2023. They apply only in particular districts, set size caps, and require owner occupancy. Errors at the zoning step are the most expensive mistakes in an ADU project.

1,000 Sq Ft Cap, CCCL-Aware Design

Hollywood caps detached ADUs at 1,000 sq ft or 50% of the primary dwelling, whichever is less, with 5 ft minimum side setbacks and 5–10 ft minimum rear setbacks, and a maximum height of 25 ft. Properties near the beach or the Intracoastal Waterway may also fall under the Coastal Construction Control Line (CCCL), adding flood and wind provisions on top of standard Florida Building Code requirements. We confirm your parcel's rules before any design work begins.

Wind Code: Up to 170 mph in the HVHZ

Everything in Broward is inside the High-Velocity Hurricane Zone, with ultimate design winds as high as 170 mph depending on location. Each window, door, garage door, and roofing product must have a Miami-Dade or Broward County NOA, and unrated products can't be installed. We choose NOA-rated materials from day one so inspections go smoothly.

A Barrier Island City

Hollywood's building department reviews permits separately from unincorporated Broward County, and its barrier-island and Intracoastal Waterway geography adds flood zone and coastal construction exposure that inland Broward cities don't face — plus condo/townhome HOA density along the beach corridor, which means many projects run into association restrictions on setbacks, exteriors, and rooflines. We review the city's code and your HOA's CC&Rs before you spend a dollar on design.

Sewer Tap Fees Run $3,000–$12,000

A detached ADU requires a new electrical sub-panel or meter, a water hookup, and a sewer tap. In Broward the sewer tap by itself costs $3,000–$12,000, set by whichever city utility serves your property. You see the real figure in our written scope before signing.

Certificate of Occupancy Required

Unpermitted guest suites can't legally be rented, don't hold up at resale, and can put your insurance at risk. Our Broward County ADUs are built to a certificate of occupancy. The permit timeline is ours to manage, and we aren't done until you have the CO.

A Single Point of Contact

You get zoning confirmation, drawings, permit submittal, coordination of every trade, and the CO through one contract, instead of juggling an architect, engineer, plumber, electrician, and framer. In a county where zoning is this restrictive, having one accountable team matters.

On the Ground in Hollywood, FL

What ADU builders navigate in Hollywood

We bring the same feasibility-first ADU process we built across Broward County to Hollywood's coastal code. Here is what shapes every project in this city.

Hollywood ADU Standards

  • Detached ADUs capped at 1,000 sq ft or 50% of primary dwelling, whichever is less
  • Attached ADUs capped at 50% of the primary dwelling's floor area
  • Minimum setbacks: 5 ft side, 5–10 ft rear; max height 25 ft
  • Beach and Intracoastal-adjacent lots may trigger CCCL review
  • Reviewed by City of Hollywood Building Division, (954) 921-3470

Project Timeline

  • Week 1–2: feasibility check and zoning review
  • Plans and engineering: 4–8 weeks
  • Plan review and permit issuance: 4–12 weeks, jurisdiction-dependent
  • Converting the garage: 8–14 weeks of construction
  • For a detached ADU, allow 16–28 weeks to build
  • Last step, final inspections and CO: 1–3 weeks

Budget Items to Know

  • Utility sewer tap: $3,000–$12,000, varying by municipality
  • Impact fees for a new detached ADU in Broward County: $5,000–$18,000
  • Design drawings: $4,000–$12,000, included in our scope
  • Our scope includes structural engineering ($2,000–$6,000)
  • Permit charges run $1,500–$6,000; we include them

Common Use Cases

  • Rental income unit — single-family neighborhoods in Hollywood Hills and Emerald Hills
  • In-law or family suite — Lakes Section and Hollywood Lakes primary homes
  • Home office + guest space combo — Liberia and Boulevard Heights
  • Investment property ADU add — increasingly common given Hollywood's strong rental market

Hollywood's biggest trap isn't the building code — it's the geography. Because so much of the city sits on or near the barrier island and the Intracoastal Waterway, the first question on every Hollywood inquiry is whether the parcel falls inside the Coastal Construction Control Line, not what the unit will cost. We run that check in week one, before a single drawing is started.

Once the site clears, the HVHZ wind code and the 1,000 sq ft / 50% size cap are what shape the design. NOA-rated windows and doors are required on every opening, and setbacks tighten fast on narrow coastal lots. We price the real number against your specific parcel before you sign anything.

Service Area

ADU & garage conversions throughout Hollywood, FL

From the Lakes Section to Hollywood Hills — Hollywood is part of our Broward County market, backed by 10+ years of licensed GC experience in South Florida.

Hollywood HillsEmerald HillsHollywood LakesLakes SectionLiberiaBoulevard Heights

Common questions

What Hollywood homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Broward County.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬