From a converted garage to a stand-alone accessory dwelling unit, we manage design, permits, and construction. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Broward County code.
Free ADU Consultation
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
Representative example finishes for illustration — not a specific completed project.
Our ADU & Garage Conversion Work
How it works
Most ADU delays come from the handoffs between architect, engineer, permit office, and builder. Here the same team carries the project from the first site visit to the day the CO is issued.
Before drawings, we look at lot size, setbacks, zoning, where water, sewer, and power connect, and whether an HOA has a say. You hear what is realistic before anyone designs a floor plan.
Drawings, engineering, and the permit application are prepared together and submitted to the right offices. We answer reviewer comments and chase HOA sign-off; permit fees are priced into your scope.
One schedule covers foundation or slab work, framing, mechanicals, finishes, and the kitchenette and bath, with every trade working under our license.
Inspectors close out each trade and the certificate of occupancy is issued, which is what makes the space legal to live in or rent.
What we build in Broward County
Most homeowners in Broward County choose between converting the garage and building a new stand-alone unit. The garage route is normally faster and cheaper; a detached unit offers more room and income potential.
The conversion work includes a level floor, better insulation, mini-split HVAC, a new electrical sub-feed, plumbing rough-in for a kitchenette and full bath, and closing out the CO. For many Broward County properties it is the most practical path.
A new building behind or beside the house, on its own foundation, with full systems, a kitchen, a bathroom, and separate utilities. It is the right fit when you want maximum rental income or a fully independent living space.
If you have a builder and need the approvals handled, we provide drawings, engineering, HOA coordination, permit filing, and project management to CO for Broward County projects. We don't do the construction in this case.
Honest pricing
Price depends on how complex the structure is, what shape the existing space is in, how far the utility connections are, and which finishes you choose. Each range includes design, permits, and the certificate of occupancy. We put the total in writing first.
Starting from a finished shell makes this the fastest way to a legal unit in Broward County. Existing roof, existing walls, existing footprint.
A new detached ADU in the 400–750 sq ft range, with new foundation, CBS or frame structure, full systems, a kitchenette or kitchen, a bath, and separate utilities.
A 750–1,200+ sq ft detached ADU with full kitchen, one to two bedrooms, one to two bathrooms, laundry connections, and high-end finishes, suited to long-term tenants or family.
Broward County · Before you build
Since 2023 Broward County has allowed ADUs in specific zoning districts only, with size limits and an owner-occupancy requirement. Getting the zoning answer wrong early costs more than any other ADU mistake.
Fort Lauderdale permits accessory dwelling units by-right only in RS-8, RD-15, RC-15, RM-15, RML-25, RMM-25, RMH-25, and RMH-60 zoning districts — not every single-family lot in the city qualifies. Unit size is capped at 600 sq ft or 49% of the primary home's gross floor area, whichever is less, and the ADU is limited to one bedroom and one bathroom, or a studio/efficiency layout. We confirm your parcel's zoning district with the Urban Design and Planning Division before any design work begins.
Broward is part of Florida's High-Velocity Hurricane Zone. Depending on exposure and how close you are to the coast, the ultimate design wind speed can reach 170 mph. That means every window, door, garage door, and roof product must have a Miami-Dade or Broward County NOA on file. Non-rated products aren't allowed, so we choose NOA materials at the drawing stage, not after an inspection fails.
Fort Lauderdale runs its own building department and its own Urban Design and Planning Division review, separate from unincorporated Broward County — and condo/townhome HOA density is high across the city's waterfront and inland neighborhoods, which means many projects also run into association restrictions on setbacks, exteriors, and rooflines. We review the city's ULDR code and your HOA's CC&Rs before you spend a dollar on design.
Detached units need an electrical sub-panel or meter, a water line, and a sewer connection. In Broward the sewer tap fee runs $3,000–$12,000 and depends on the city utility serving the address. We put the real number in the written scope up front.
If the unit has no certificate of occupancy, it can't be legally rented, it complicates resale, and it can jeopardize insurance coverage. We build each Broward County ADU toward a CO and manage the permit schedule ourselves. The project isn't complete until you hold the certificate.
Zoning review, drawings, permit filing, trade scheduling, and the CO are handled under a single contract with a single point of contact. You avoid coordinating an architect, engineer, plumber, electrician, and framer yourself. That is the design-build benefit, and we offer it throughout Broward County.
We bring the same feasibility-first ADU process we built across Broward County to Fort Lauderdale's ULDR code. Here is what shapes every project in this city.
Fort Lauderdale's biggest trap isn't the building code — it's the zoning district. Because ADUs are only allowed by-right in eight specific districts under ULDR §47-19.2, the first question on every Fort Lauderdale inquiry is whether the parcel qualifies at all, not what it will cost. We run that check in week one, before a single drawing is started.
Once zoning clears, the HVHZ wind code and the 600 sq ft / 49% size cap are what shape the design. NOA-rated windows and doors are required on every opening, and the one-bedroom limit means the floor plan has to work hard within a tight footprint. We price the real number against your specific parcel before you sign anything.
From Victoria Park to Rio Vista — Fort Lauderdale is part of our Broward County market, backed by 10+ years of licensed GC experience in South Florida.
Common questions
The process, the cost, what needs a permit, and what makes an ADU legal to rent in Broward County.
No, not without a certificate of occupancy for a dwelling unit. If the work was never permitted, the unit cannot be legally rented, regardless of how it was built. Selling later means disclosing it, and an insurer may treat the space as uninsured. Every ADU we build is carried through to CO, so it is legal, insurable, and ready to rent on day one.
Drawings and design usually run 4–8 weeks. Permit review by the Urban Design and Planning Division takes 4–12 weeks depending on scope complexity, with separate planning review required before building permit submission. We keep tabs on the permit from submission to approval and respond to review comments for you.
Check your CC&Rs or condo bylaws before anything else. Many HOAs and condo associations in Broward County restrict or prohibit ADU construction — either by requiring architectural committee approval, specifying exterior material requirements, or prohibiting external dwelling units entirely. Reading your governing documents is part of our feasibility step, before you spend anything on drawings. An ADU built without association approval can lead to fines and legal action.
Under ULDR Section 47-19.2, Fort Lauderdale caps ADUs at 600 sq ft or 49% of the primary home's gross floor area, whichever is less, and limits the unit to one bedroom and one bathroom, or a studio/efficiency layout. ADUs are only permitted by-right in specific zoning districts — RS-8, RD-15, RC-15, RM-15, RML-25, RMM-25, RMH-25, and RMH-60. We confirm your parcel's zoning district with the city before any design work begins.
ADU projects in Fort Lauderdale typically include: impact fees ($5,000–$18,000 for new construction), sewer tap fees ($3,000–$12,000 through the city's water/sewer utility), permit fees ($1,500–$6,000), and architectural drawings and engineering ($6,000–$18,000). Our written estimate carries all of them, so the number you approve is the number you pay. Any estimate that ignores these items understates what the project really costs.
Yes. D&Co is a Florida Certified General Contractor (CGC1531095), authorized for all phases of construction, ADUs included. Dariceli Kunhardt brings 10+ years of construction, development, and project management experience. Everything is done to permit and passes inspection under our license. The state's DBPR lookup shows the license status.
ADU cost in Fort Lauderdale ranges from $40,000 for a basic garage conversion to $180,000+ for a custom detached unit with 2 bedrooms and premium finishes. What we price covers more than labor: design, permits, build, and CO. Most detached units (400–650 sq ft) come in at $65,000–$110,000 all-in.
Ready to explore?
Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.
Prefer email? office@dandcohomes.com
More from D&Co — Fort Lauderdale