Add a legal second unit to your property, either by converting the garage or building a detached cottage. We confirm what your specific jurisdiction actually allows before you spend a dollar on drawings — then handle design, permits, construction, and certificate of occupancy under one licensed GC contract.
Free ADU Consultation
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
Representative example finishes for illustration — not a specific completed project.
Our ADU & Garage Conversion Work
How it works
Before a floor plan is drawn, someone has to find out whether your address allows an ADU outright, only with a variance, or only after an RM rezoning. That research comes first, and then one contract carries the project through to the end.
Step one is pinning down which government actually controls your lot (Port St. Lucie, Fort Pierce, St. Lucie Village, or the county) and what its code says about a second dwelling, all before drawings cost you anything.
We prepare the architectural and structural drawings, file the permit (plus a variance or rezoning request when your parcel needs one), and handle reviewer comments with the right building department. Permit fees are written into the scope.
Every trade, from foundation and framing to roofing, electrical, plumbing, insulation, drywall, flooring, kitchen, and bath, plus a well or septic hookup where the lot calls for it, is scheduled and supervised under our GC license.
Each trade passes its final inspection and the proper jurisdiction issues the CO. What you get is a finished, lawful dwelling with a certificate of occupancy, ready for a tenant or a relative.
What we build across St. Lucie County
A garage conversion is often the most economical way to add a legal unit in St. Lucie County, while a detached ADU suits larger lots and longer-term income plans. We handle both start to finish.
Work includes leveling the floor, upgrading insulation, installing mini-split HVAC and an electrical sub-feed, roughing in plumbing for a kitchenette and bath, and finishing the CO application. Frequently the best-value ADU in St. Lucie County.
A new dwelling on its own foundation with complete systems, separate utilities, a kitchen, and a bath. Well suited to owners who want to maximize rent or create an independent space for family.
Unsure your lot qualifies? We compare your zoning to the real city or county code, and judge whether a variance, special exception, or RM rezoning is realistic, before any construction money is committed.
Honest pricing
Building here generally costs less than in South Florida because HVHZ product approvals don't apply. Still, which jurisdiction you are in, well and septic work outside city limits, and any variance can move the number. The ranges below cover design, permits, and CO, and we put the full project price in writing before you commit.
Turn an attached or detached garage into a lawful ADU where zoning permits it. The quickest route to a CO in the county, since the structure, roof, and footprint already exist.
A new 400–700 sq ft detached unit, typically on unincorporated county lots or bigger parcels near Fort Pierce. Includes a new foundation, frame or CBS walls, complete mechanical systems, a kitchenette or full kitchen, and a bathroom.
A detached unit of 700–1,200+ sq ft with a full kitchen, one or two bedrooms and baths, a laundry hookup, and quality finishes. A good match for bigger lots in unincorporated St. Lucie County.
St. Lucie County · Local rules worth knowing
ADU rules in St. Lucie County are patchier than in South Florida, which is why starting with feasibility and working through a licensed GC counts for more here.
Port St. Lucie's own single-family zoning code (Chapter 158, Section 158.217(C)) does not currently list a second dwelling unit among the accessory uses permitted in RE and RS-1 through RS-3 districts — accessory uses there are capped at structures like garages, workshops, and pools, limited to 20% of the principal building's footprint. A true ADU inside city limits generally needs RM zoning, a variance, or a rezoning. We check this before your first drawing, not after.
Because Port St. Lucie's Chapter 158 doesn't list a second dwelling unit as a permitted accessory use in RE/RS-1 through RS-3 districts, the realistic path for most properties is one of three routes: qualifying RM (multi-family) zoning, a variance, or a rezoning application through the Planning and Zoning Board. Each path has a different cost and timeline. We map the correct one for your parcel before we quote.
A large share of Port St. Lucie's residential land sits inside Planned Unit Developments (PUDs), which often carry their own development standards — sometimes more restrictive than the base zoning code. An ADU plan that would otherwise work under RM zoning can still run into PUD-specific limits. We check your property's PUD status, if any, as part of the same zoning review.
Port St. Lucie's Neighborhood Services Code Compliance division fines unpermitted second units up to $250 a day for a first offense and $500 a day for a repeat. An unpermitted "in-law suite" also lacks a CO, can't be rented legally, must be disclosed when you sell, and can void homeowner's coverage. Every ADU we build is aimed at a CO at close-out.
St. Lucie County is not in the High-Velocity Hurricane Zone that covers Miami-Dade and Broward — construction here falls under the standard Wind-Borne Debris Region, which is a different, generally less expensive approval pathway for windows, doors, and roofing. That doesn't mean lighter construction standards overall; it means a different, often faster, product-approval process that we manage so you're not paying for HVHZ-level products you don't need.
We handle drawings, zoning review, any variance, every trade, and the CO. You sign one contract and deal with one contact, instead of hiring a zoning consultant, architect, engineer, plumber, and framer separately.
We bring the same feasibility-first ADU process we built across South Florida to Port St. Lucie's zoning path. Here is what shapes every project in this city.
Port St. Lucie's biggest trap isn't cost — it's discovering, after drawings are already paid for, that the city's own zoning code doesn't list a second dwelling unit as a permitted accessory use in standard single-family districts. That surprises a lot of homeowners who've heard that "Florida now allows ADUs everywhere." Florida Statute §163.31771 gives cities the option to adopt an ADU ordinance — it does not require them to, and Port St. Lucie has not. We confirm your exact zoning designation and realistic path — RM zoning, variance, or rezoning — in the first 1–3 weeks, before any design work begins.
PUD status is the other variable that catches homeowners off guard. A large share of Port St. Lucie's residential land sits inside Planned Unit Developments with their own, sometimes more restrictive, development standards layered on top of the base zoning. We identify every jurisdictional requirement and PUD restriction in writing before you sign.
From St. Lucie West to River Park — Port St. Lucie is part of our Treasure Coast market, backed by 10+ years of licensed GC experience in Florida.
Port St. Lucie · Before you design
Port St. Lucie’s layout, utilities, and community rules differ from the rest of St. Lucie County. These are the parcel-level checks we run before quoting.
Much of Port St. Lucie was platted in the 1960s and 70s by General Development Corporation, and many lot layouts predate today’s setback and coverage rules. A lot that looks roomy can still fall short once the 20% accessory-footprint cap, setbacks, and the existing house are measured, so we survey and measure before any design work.
Some Port St. Lucie neighborhoods are on city sewer while others still rely on septic. A second unit on septic can trigger a capacity review, while a sewer connection is a different cost and timeline. Which one applies depends on your street, and we confirm it with the utility during the feasibility review.
Many Port St. Lucie communities have an HOA or sit inside a Planned Unit Development. Those documents can prohibit a second dwelling or restrict exterior changes even when the city allows it. We read them alongside the zoning review so you don’t pay for plans that an association will reject.
Because the city’s code doesn’t list a second dwelling unit as an accessory use in standard single-family districts, converting a garage into a legal ADU faces the same zoning question as a detached unit. Conversions are usually faster and cheaper to build, but zoning status decides which path is realistic.
Common questions
The process, the price, which jurisdiction permits a second unit, and what makes an ADU rentable in St. Lucie County.
ADU cost in Port St. Lucie ranges from $35,000 for a basic garage conversion to $160,000+ for a custom detached unit with 2 bedrooms and premium finishes. Our pricing includes design, zoning/variance review, permits, construction, and CO — not just construction labor. For a standard detached ADU, 400–700 sq ft, expect $55,000–$95,000 all-in.
No. Port St. Lucie is not in Florida's High-Velocity Hurricane Zone (HVHZ) — that designation applies only to Miami-Dade and Broward counties. St. Lucie falls under the standard Florida Building Code Wind-Borne Debris Region, which generally requires impact-rated protection for openings but does not require the full Miami-Dade Notice of Acceptance (NOA) product-approval system. Construction still must meet Florida Building Code wind standards for the Treasure Coast, just under a different, less restrictive approval pathway than HVHZ counties.
Unpermitted second dwelling units are enforced by Port St. Lucie's Neighborhood Services Code Compliance division, with fines up to $250 per day for a first violation and $500 per day for a repeat violation. Beyond the fines, an unpermitted unit has no certificate of occupancy, can't legally be rented, must be disclosed at sale, and may void your homeowner's insurance. We only build to a CO.
Only once it has a dwelling-unit certificate of occupancy, and only where local zoning permits a second unit. Feasibility is confirmed in writing first, including any variance or RM rezoning, so you never finish a space that can't become a legal rental.
ADU projects in Port St. Lucie typically include: impact fees ($4,000–$10,000 for new construction, generally lower than South Florida counties), utility or well/septic connection fees ($2,500–$10,000, higher for unincorporated properties on well and septic), permit fees ($900–$2,500), and architectural drawings and engineering ($4,500–$13,000). Where a variance or rezoning is required, we add that process and its timeline to the written scope up front.
Yes. Our Florida Certified General Contractor license, CGC1531095, authorizes ADU design-build work along with every other phase of residential and commercial construction. Dariceli Kunhardt has over a decade in construction, development, and project management. Our work is permitted and inspected, always under our GC license. Feel free to check the license number with Florida DBPR.
Not automatically. Port St. Lucie's own single-family zoning code (Chapter 158) does not currently list a second dwelling unit among the accessory uses permitted in RE and RS-1 through RS-3 districts. A true ADU there generally requires multi-family (RM) zoning, a variance, or a rezoning — it is not a simple by-right permit the way it is in some other Florida cities. Unincorporated St. Lucie County and the City of Fort Pierce have their own, separate zoning rules. We confirm your exact jurisdiction and zoning designation before quoting — this single fact changes the entire project path.
Ready to explore?
Tell us your lot, your goals, and your timeline. We'll confirm your exact jurisdiction and zoning path and give you an honest picture of what's buildable before you commit to anything.
Prefer email? office@dandcohomes.com
More from D&Co — Port St. Lucie