📍 Hialeah, FL · ADU & Garage Conversion

Hialeah ADU & Garage Conversions — Chapter 98 Compliant, Fully Permitted

Garage conversions and fully detached accessory dwelling units, handled from design through certificate of occupancy. Design, Miami-Dade NOA product approvals, permits, construction, and certificate of occupancy — all under one licensed GC contract, built to the state's toughest wind code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 HVHZ 175 mph Rated CO Guaranteed Now Serving Hialeah

Free ADU Consultation

Get a Fast, No-Obligation Quote

Just your name and number — we'll call you back, usually within 24 hours.

No spam. We respond fast.

Serving Miami · Hialeah · Homestead · Kendall · Doral · Coral Gables · Miami Gardens · Cutler Bay and all of Miami-Dade County
✓ Florida Licensed GC · CGC1531095
✓ NOA Product Approvals Handled
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
Exterior Example ADU exterior finish, representative style for Miami-Dade County
Interior Example ADU interior finish, representative style for Miami-Dade County

Representative example finishes for illustration — not a specific completed project.

How it works

Planning an ADU in Miami-Dade: what happens and when

A second dwelling here has to satisfy the strictest wind rules in the state and whichever local government covers your address. These are the steps, in order.

01

Check the parcel

We confirm the jurisdiction, zoning designation, setbacks, utility access, and flood elevation, then explain what can be built.

02

Draw and permit

We prepare drawings and HVHZ engineering, select approved exterior products, submit for permit, and handle reviewer questions. Permit fees are included in the written price.

03

Build it

Our team and licensed trades build the unit to the approved plans, from foundation through finishes.

04

Close out

After final inspections pass and the CO is issued, we walk you through the unit and hand over the paperwork.

What we build in Miami-Dade

What we build in Miami-Dade: conversions and detached units

A converted garage or a new detached unit can each become a legal rental or family suite. Which suits you depends on the lot, the budget, and which Miami-Dade jurisdiction covers your address.

Garage conversion

Garage space becomes a legal dwelling with a new floor, insulation, mini-split HVAC, an electrical sub-panel, plumbing for a kitchenette and bathroom, and a CO. Usually the fastest and most economical ADU in the county.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A free-standing unit with its own foundation, wind-rated structure, mechanical systems, kitchen, bathroom, and utility service. Best for owners who want the most rental income or a separate home for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

We can act as your design and permitting team alone. That means drawings, HVHZ engineering, NOA documentation, permit applications, and project management through CO, with someone else building.

Architectural drawingsHVHZ engineeringPermit managementNOA documentation

Honest pricing

ADU costs — Miami-Dade 2026

Pricing in Miami-Dade reflects the high-velocity hurricane zone: NOA-approved windows, doors, and roofing, plus some of the highest land and labor costs in Florida. The figures include design, permits, and the CO. We give a single written total before you commit.

$45K – $70K
Garage conversion

Garage already built

In Miami-Dade, a garage conversion usually reaches a certificate of occupancy sooner than any other ADU type, because the structure is already there.

  • Drawings and permit filing
  • Level floor and insulated envelope
  • Rough plumbing for bath and kitchenette
  • Mini-split and electrical sub-feed
  • Final inspection and CO
$130K – $200K+
Large or custom ADU

Custom detached home

A 800–1,200+ sq ft unit with a full kitchen, up to two bedrooms and two baths, a laundry hookup, and quality finishes, designed for long-term renters or family.

  • Spacious layout
  • Up to two bedrooms and baths
  • Full kitchen, appliances included
  • Washer and dryer connections
  • High-spec finish package
  • Certificate of occupancy and documents

Miami-Dade · Know this first

What makes Miami-Dade ADU permitting a job for a licensed GC

Miami-Dade ADUs run into Florida's toughest wind code, a patchwork of 34+ municipalities, and coastal flood review. A handyman or unlicensed builder cannot legally take this on.

Highest Wind Rating in Florida: 175 mph

Miami-Dade is in the High-Velocity Hurricane Zone and designs for 175 mph, higher than Broward's 170. Windows, doors, garage doors, and roofing all need a Miami-Dade NOA from the County's Product Control Section. Installing a product without that approval violates code and can hold up your CO.

Chapter 98: No Owner-Occupancy Mandate

Hialeah regulates ADUs under Chapter 98 (Zoning) of its own Code of Ordinances, separate from unincorporated Miami-Dade — size, setback, and parking standards vary by district (R-1, R-2, R-3). Unlike several neighboring cities, Hialeah does not require owner-occupancy of the main house or the ADU, which opens the door for investment-property ADUs. We confirm your district's specific standards before any design work begins.

DERM and Flood Elevation Rules

Lots near canals, wetlands, or coastal flood zones are often reviewed by DERM in addition to the building department. The review covers septic and well setbacks, flood elevation (base flood elevation plus freeboard), and king-tide resilience, all stricter than inland counties. We check for these issues in the feasibility step.

County Impact Fees Still Apply

Even though Hialeah runs its own zoning code, ADUs here are still subject to Miami-Dade County impact fees under County Code Chapter 33E — covering roads, schools, parks, police, and fire — tied to the new dwelling unit, on top of the city's own building permit and plan-review fees. We include both fee layers in your written scope before you sign.

A CO Makes It Legal

The certificate of occupancy is what allows you to rent or occupy an ADU. Unpermitted suites carry liability when you sell or insure the property and are a common target for code enforcement. Our projects aim for the CO at close-out.

Single Contract, Single Contact

We deliver HVHZ-compliant drawings, manage permits across whichever of the 34+ jurisdictions applies, coordinate every trade, and secure the CO. You deal with one company, not an architect, an engineer, a plumber, an electrician, and a framer.

On the Ground in Hialeah

What ADU builders navigate in Hialeah

We bring the same feasibility-first ADU process we built across South Florida to Hialeah's Chapter 98 code. Here is what shapes every project in this city.

Chapter 98 Requirements

  • Permitted in single-family and multi-family districts (R-1, R-2, R-3)
  • Size, setback, and parking standards vary by district
  • No owner-occupancy mandate
  • Subject to Miami-Dade County Chapter 33E impact fees
  • Reviewed by Planning & Zoning Division, (305) 883-8075

Typical Timeline

  • Feasibility and jurisdiction review: 1–2 weeks
  • Design and HVHZ engineering phase: 4–8 weeks
  • Permitting runs 4–14 weeks and varies by office
  • Build time, garage conversion: 8–14 weeks
  • Detached ADU construction phase: 16–30 weeks
  • Closeout, final inspections, and CO: 1–3 weeks

Where the Money Goes

  • Impact fees: capped at single-family rate under FL HB 1339, generally $5,000–$15,000
  • School impact fee: approximately $3,000–$5,000
  • Service connections for power, water, and sewer: $4,000–$15,000
  • HVHZ architectural drawings + engineering: $7,000–$20,000 (included in our scope)
  • Our scope includes permit fees ($1,500–$4,000)

Common Use Cases

  • Rental income unit — single-family neighborhoods in West Hialeah and Palm Springs North
  • In-law or family suite — Hialeah Gardens-adjacent primary homes
  • Investment property ADU add — no owner-occupancy requirement makes this straightforward
  • Garage-to-ADU conversion — dense residential lots throughout central Hialeah

Hialeah's biggest advantage over several neighboring cities is the absence of an owner-occupancy requirement — that makes it a straightforward choice for an investment-property ADU. The first question on every Hialeah inquiry is still which Chapter 98 district (R-1, R-2, or R-3) your parcel sits in, since size and setback standards vary. We confirm that in week one, before a single drawing is started.

From there, the HVHZ wind code and Miami-Dade County's Chapter 33E impact fees are what shape the budget. NOA-rated windows and doors are required on every opening, and the county fee layer applies on top of the city's own permit and plan-review fees. We price the real number against your specific parcel before you sign anything.

Service Area

ADU & garage conversions throughout Hialeah

From West Hialeah to Palm Springs North — Hialeah is part of our Miami-Dade County market, backed by 10+ years of licensed GC experience in South Florida.

West HialeahPalm Springs NorthHialeah Gardens AreaOkeechobeeMeadowlakeTwin Lakes

Common questions

What Hialeah homeowners ask about ADUs

The process, the cost, what needs an NOA, and what makes an ADU legal to rent in Miami-Dade.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning, NOA requirements, and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬