We build accessory dwelling units of every type, from garage conversions to new detached homes. Design, Miami-Dade NOA product approvals, permits, construction, and certificate of occupancy — all under one licensed GC contract, built to the state's toughest wind code.
Free ADU Consultation
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
Representative example finishes for illustration — not a specific completed project.
Our ADU & Garage Conversion Work
How it works
In Miami-Dade the hard parts are the wind code, the many separate city building departments, and flood review. One team handles each of them from the first visit to the CO.
We find out which building department governs your parcel, then review zoning, setbacks, utility connections, and flood zone status.
Drawings and HVHZ engineering are prepared with the required Miami-Dade product approvals (NOA) for exterior openings and roofing. We file the permit and respond to review comments; permit fees are in your scope.
One schedule covers structure, mechanicals, impact-rated openings, finishes, and the kitchenette and bathroom.
Every trade is inspected and the certificate of occupancy is issued, which makes the unit legal to occupy or rent.
What we build in Miami-Dade
Most Miami-Dade owners choose between converting the garage and building a new unit. Conversions are quicker and cheaper; a detached unit offers more space. Both are built to HVHZ requirements.
The conversion scope covers floor leveling, insulation, mini-split HVAC, an electrical sub-feed, kitchenette and bath plumbing, and the CO. Any new windows or doors carry Miami-Dade product approval.
A new structure on its own foundation, engineered for the HVHZ, with full mechanical systems, separate utilities, a kitchen, and a bathroom. The right choice for maximum rental income or a self-contained home for relatives.
If you already have a builder, we provide the design and permit side: drawings, HVHZ engineering, NOA documentation, permit submission, and management through CO.
Honest pricing
Why Miami-Dade ADUs cost more: exterior openings and roofing must carry Miami-Dade NOA or HVHZ-rated Florida approval, and construction costs here are among the highest in Florida. These ranges cover design, permits, and the certificate of occupancy, and you receive the total in writing first.
Starting with a built garage makes this the fastest way to a legal unit in Miami-Dade: existing roof, existing walls, existing footprint.
A new 400–800 sq ft detached ADU: new foundation, HVHZ-rated CBS construction, full systems, a kitchenette or kitchen, a bath, separate utilities, and NOA-approved windows and roof.
A 800–1,200+ sq ft detached ADU with full kitchen, one to two bedrooms and baths, laundry hookup, and high-end finishes, suited to long-term tenants or a family suite.
Miami-Dade · Before you build
Building an ADU in Miami-Dade means dealing with Florida's strictest wind code, more than 34 city governments, and coastal flood review. None of that can be legally managed by an unlicensed handyman.
Miami-Dade is inside Florida's High-Velocity Hurricane Zone, designed for 175 mph winds, the state's highest and above Broward's 170 mph. Every window, door, garage door, and roofing product needs a Miami-Dade NOA issued by the County's Product Control Section. A non-rated product is a code violation and can stop your CO at the final inspection.
Doral is a newer, master-planned city with its own zoning code and Planning and Zoning Department review, separate from unincorporated Miami-Dade. In practice, Doral's plan review tends to apply fewer exemptions and send more projects through full permit review than standard code minimums — for garage conversions and room-addition ADUs as much as detached units. We confirm your zoning district's requirements with the city before any design work begins.
If your lot is near a canal, wetland, or coastal flood zone, Miami-Dade's Department of Environmental Resources Management (DERM) may review it in addition to the building department. Expect questions about septic and well setbacks, flood elevation (base flood elevation plus freeboard), and king-tide resilience. We spot those triggers during feasibility, before you pay for drawings.
A detached ADU requires new electrical service (sub-panel or meter), a water connection, and a sewer tap. HB 1339 now caps ADU impact fees at the single-family rate, yet the school impact fee and utility connection charges still apply. Our written scope includes the complete fee picture.
Only a certificate of occupancy makes an ADU legal to rent or live in. A suite built without permits has no legal standing, creates liability at sale or insurance renewal, and is a frequent enforcement target in dense neighborhoods. We build every Miami-Dade ADU toward a CO.
We prepare HVHZ-compliant drawings, handle permitting with whichever of the 34+ jurisdictions covers your lot, coordinate every trade, and deliver the CO. That is a single contract and a single contact, instead of separate architect, engineer, and trade relationships.
We bring the same feasibility-first ADU process we built across South Florida to Doral's city code. Here is what shapes every project in this city.
Doral's biggest trap isn't a specific size cap — it's the city's stricter review posture. Because Doral's Planning and Zoning Department applies fewer exemptions than standard code minimums, the first question on every Doral inquiry is whether your specific project — detached, attached, or garage conversion — will need the full trade-permit package, not just whether it meets basic zoning. We confirm that scope in week one, before a single drawing is started.
Once the permit scope is confirmed, the HVHZ wind code sets the material budget — NOA-rated windows, doors, and roofing are required on every opening. We price the real number and the real permit timeline against your specific parcel before you sign anything.
From Downtown Doral to Lakes of Doral — Doral is part of our Miami-Dade County market, backed by 10+ years of licensed GC experience in South Florida.
Common questions
The process, the cost, what needs an NOA, and what makes an ADU legal to rent in Miami-Dade.
Rental is only lawful after a certificate of occupancy is issued for the space as a residence. An unpermitted conversion — even a beautifully finished one — cannot be legally rented and is a common code enforcement target in Doral. At resale it becomes a disclosure problem, and your insurer may refuse a claim on it. We don't hand over a project until the CO is in hand, so there is nothing to fix before you rent.
Expect 4–8 weeks to get the drawings finished. Permit review by Doral's Planning and Zoning Department runs roughly 6+ weeks at minimum, often longer given the city's stricter review posture. We manage this timeline and confirm the full permit scope before we ever submit.
Yes, generally. Doral is a newer, master-planned city with its own zoning code, and its Planning and Zoning Department tends to apply fewer exemptions and require more situations to go through full permit review than standard code minimums — for both detached ADUs and garage or room-addition conversions. Expect full building, electrical, plumbing, and mechanical permits regardless of ADU type. We confirm your specific zoning district's requirements with the city before quoting.
ADU projects in Doral typically include: impact fees (now capped at the single-family rate under Florida HB 1339, generally $5,000–$15,000 depending on jurisdiction), school impact fees (roughly $3,000–$5,000), utility connection fees ($4,000–$15,000), permit fees ($1,500–$4,000), and architectural drawings and HVHZ-rated engineering ($7,000–$20,000). They are part of our written total from the start, not add-ons discovered at permit time.
Yes. We work under Florida Certified General Contractor license CGC1531095, which allows full-scope residential and commercial construction, including HVHZ-rated ADU design-build. With 10+ years in construction and project management, Dariceli Kunhardt runs every project. All work goes through permits and inspections under that license. Florida DBPR's license search will confirm it.
ADU cost in Doral ranges from $45,000 for a basic garage conversion to $200,000+ for a custom detached unit with HVHZ-rated construction and premium finishes. Our pricing includes design, NOA-compliant product selection, permits, construction, and CO — not just construction labor. A typical detached ADU of 400–800 sq ft lands between $75,000–$130,000 all-in.
Yes. Miami-Dade County (along with Broward) sits in Florida's High-Velocity Hurricane Zone, with a 175 mph design wind speed — the highest in the state. Every window, door, roofing product, and exterior component used on an ADU must carry a Miami-Dade Notice of Acceptance (NOA) from the County's Product Control Section, or a statewide Florida Product Approval explicitly rated for HVHZ use. This is stricter than ordinary wind-borne debris region rules used in most of the rest of Florida, and it changes which products a builder can legally use.
Doral is its own city, and its Land Development Code, not the unincorporated Miami-Dade ADU ordinance, governs what is allowed on your lot. Secondary sources say Doral allows accessory dwelling units in certain residential districts, subject to size, setback and permit requirements. Because the rules vary by zoning district and lot, confirm with the City of Doral Planning and Zoning Department before you design.
The county's ADU ordinance applies in unincorporated Miami-Dade. Municipalities such as Doral adopt their own zoning rules. Product approvals and the High-Velocity Hurricane Zone (HVHZ) construction requirements apply countywide, but whether and how an ADU is allowed is decided by Doral's code.
Long-term rental is generally only lawful with a certificate of occupancy for the space as a residence and if Doral's code and any HOA allow it. Miami-Dade's county ordinance prohibits using ADUs as vacation rentals in unincorporated areas, and Doral may have its own short-term rental rules. Check the code and your HOA first.
A garage conversion needs a permit and must meet habitable-space requirements, and Doral regulates garage conversions closely. Parking replacement, floor elevation and flood requirements, HVHZ-rated openings and HOA approval all come into play. Ask Planning and Zoning whether your district allows it before you spend on plans.
Size limits are set by Doral's zoning code and depend on your district and lot. We don't quote a number without checking your parcel. The city can tell you the maximum unit size, setbacks and lot coverage that apply to your address.
Yes. Doral is in Miami-Dade, so new exterior openings and roofing must carry Miami-Dade Notice of Acceptance (NOA) product approval or equivalent HVHZ-rated approval, and structure is designed for the High-Velocity Hurricane Zone wind loads.
For properties inside city limits, the City of Doral Building Department reviews permits. Properties with a Doral mailing address can be in neighboring jurisdictions, so verify your parcel is inside Doral first.
Most ADUs need sealed drawings: architectural plans and structural engineering for HVHZ wind loads, plus MEP details. Your contractor can coordinate this. Garage conversions may need less, depending on scope and the building department.
Parts of Doral are in FEMA flood zones. Flood zone and base flood elevation affect minimum floor height, materials and insurance. Check your flood zone early, because it can change the design and cost, especially for a garage conversion.
Many Doral neighborhoods have HOAs with architectural review and rules on additions, exterior changes and rentals. HOA approval is separate from city permits. Get written approval before you apply for a permit.
Usually yes, since the new structure adds assessed value. Miami-Dade County's property appraiser sets the assessment. A rented unit may not qualify for homestead on that portion, so check with the appraiser.
Start with the site and zoning check: confirm the parcel is in Doral, what your district allows, setbacks, flood zone and HOA rules. Then design, engineering with NOA-approved openings, permit submission, construction and final inspections through the certificate of occupancy. We handle these steps under one contract.
Yes. We are a Florida licensed general contractor (CGC1531095) and handle permitting, HVHZ engineering coordination, NOA-approved products, construction and inspections through the certificate of occupancy.
Ready to explore?
Tell us your lot, your goals, and your timeline. We'll review zoning, NOA requirements, and give you an honest picture of what's buildable before you commit to anything.