📍 Coral Gables, FL · ADU & Garage Conversion

Coral Gables ADU & Garage Conversions — Board of Architects Approved, Fully Permitted

From a converted garage to a stand-alone accessory dwelling unit, we manage design, permits, and construction. Design, Miami-Dade NOA product approvals, permits, construction, and certificate of occupancy — all under one licensed GC contract, built to the state's toughest wind code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 HVHZ 175 mph Rated CO Guaranteed Now Serving Coral Gables

Free ADU Consultation

Get a Fast, No-Obligation Quote

Just your name and number — we'll call you back, usually within 24 hours.

No spam. We respond fast.

Serving Miami · Hialeah · Homestead · Kendall · Doral · Coral Gables · Miami Gardens · Cutler Bay and all of Miami-Dade County
✓ Florida Licensed GC · CGC1531095
✓ NOA Product Approvals Handled
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
Exterior Example ADU exterior finish, representative style for Miami-Dade County
Interior Example ADU interior finish, representative style for Miami-Dade County

Representative example finishes for illustration — not a specific completed project.

How it works

How an ADU goes from idea to finished unit in Miami-Dade

Between product approvals, flood review, and dozens of separate city departments, a Miami-Dade ADU rewards careful planning. We take the coordination off your plate.

01

Feasibility

Jurisdiction, zoning, setbacks, utilities, and flood elevation are verified first, because it is cheaper to find a problem before drawings are paid for.

02

Design and permitting

Drawings, HVHZ structural engineering, and NOA product selection are completed and filed. We follow every reviewer comment through, and permit fees are part of your written scope.

03

Building

Foundation or conversion work, framing, impact-rated windows and doors, roofing, mechanicals, and finishes are coordinated by us.

04

Certificate of occupancy

When the final inspection is passed, the CO turns the space into a legal dwelling you can rent or move into.

What we build in Miami-Dade

Garage conversion or new detached ADU?

Either path ends in a certificate of occupancy and a legal dwelling. In Miami-Dade, a conversion costs less and moves faster, while a detached ADU gives you more floor area and flexibility.

Garage conversion

Our conversions include floor leveling, insulation, mini-split HVAC, panel sub-feed, kitchenette and bathroom plumbing, and the CO paperwork, with impact-rated windows and doors where new openings are needed.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A new stand-alone structure, engineered to the HVHZ, with its own foundation, utilities, kitchen, and bath. It suits owners who want long-term rental income or a self-contained home for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Need only the paperwork side? We prepare plans, HVHZ engineering, and NOA documentation, submit permits, and manage the process to CO for Miami-Dade projects another contractor will build.

Architectural drawingsHVHZ engineeringPermit managementNOA documentation

Honest pricing

ADU costs — Miami-Dade 2026

Building to the HVHZ code and paying Miami-Dade land and labor rates raises ADU costs compared with most of Florida. Each range below includes design, permits, and CO, and the whole project is quoted in writing before you decide.

$45K – $70K
Garage conversion

Existing garage

The quickest path to a CO'd ADU in Miami-Dade: no new foundation, no new roof, no new footprint.

  • Design and permit drawings
  • Floor leveling and insulation
  • Plumbing rough-in + bathroom
  • Electrical and mini-split
  • Certificate of occupancy
$130K – $200K+
Large or custom ADU

Premium detached ADU

A 800–1,200+ sq ft detached unit with a full kitchen, one or two bedrooms, one or two baths, a laundry hookup, and high-spec finishes for long-term rental or a family suite.

  • Up to 1,200 sq ft
  • 1–2 bed / 1–2 bath
  • Full kitchen with appliances
  • Washer / dryer hookup
  • Premium finishes
  • Full CO and documentation

Miami-Dade · Why it matters

Why Miami-Dade ADUs call for a licensed GC

Wind rules here are the strictest in the state, there are over 34 city governments, and flood review is common. A handyman or unlicensed contractor can't legally manage an ADU in Miami-Dade.

Board of Architects: A Design Review Layer

Coral Gables requires accessory dwellings to meet Section 5-1103 of the Zoning Code, which mandates an identifiable architectural style — Mediterranean, Colonial, Venetian, Italian, French, or Bahamian — matching George Merrick's original vision for the city. The Board of Architects, which meets weekly, reviews every accessory structure against the Design Review Standards in Section 5-100 before a permit can move forward. We design for this review from day one, not as a late-stage correction.

HVHZ Wind Code Still Applies

Coral Gables sits within Miami-Dade's High-Velocity Hurricane Zone, with a 175 mph design wind speed — the highest in the state. Every window, door, and roofing product on your ADU must carry a Miami-Dade Notice of Acceptance (NOA), and those products still have to be selected within the Board of Architects' approved material and color palette. We balance both requirements from the first drawing.

When DERM Gets Involved

Properties close to canals, wetlands, or coastal flood zones often need DERM review as well as building permits. DERM looks at septic and well setbacks, flood elevation (base flood elevation plus freeboard), and king-tide resilience, and its requirements are tougher than inland counties'. We flag these issues early, before drawings are paid for.

Utility Connections and School Impact Fees

A detached ADU needs a new sub-panel or meter, a water connection, and a sewer tap. Although HB 1339 caps ADU impact fees at the single-family rate, the school impact fee and utility connection costs still apply. We give you a full fee assessment in writing.

The Certificate of Occupancy

Only a CO makes an ADU legal to rent or occupy. Without it, you face liability when selling or insuring, and dense Miami-Dade neighborhoods are a frequent code enforcement target. Every ADU we build is aimed at a CO.

One Contract From Drawings to CO

We prepare HVHZ-compliant plans, manage the permit across whichever of the 34+ jurisdictions applies, coordinate the trades, and deliver the CO. One contract, one point of contact.

On the Ground in Coral Gables

What ADU builders navigate in Coral Gables

We bring the same feasibility-first ADU process we built across South Florida to Coral Gables' Board of Architects review. Here is what shapes every project in this city.

Coral Gables Review Requirements

  • Accessory dwellings permitted in the Single-Family Residential (SFR) district
  • Section 5-1103: must match an identifiable architectural style
  • Board of Architects reviews Design Review Standards (Section 5-100)
  • Board meets weekly, every Thursday morning
  • Zoning Code regulated by Development Services Department

How Long It Takes

  • First step, feasibility and jurisdiction review (1–2 weeks)
  • Design: HVHZ architectural and engineering drawings, 4–8 weeks
  • Permit submission to approval: 4–14 weeks
  • Garage-to-ADU construction: 8–14 weeks
  • Constructing a stand-alone unit: 16–30 weeks
  • Final sign-off and CO: 1–3 weeks following construction

Costs Beyond Construction

  • Impact fees: capped at single-family rate under FL HB 1339, generally $5,000–$15,000
  • School impact fee: approximately $3,000–$5,000
  • Sub-panel, water, and sewer connections: $4,000–$15,000
  • HVHZ architectural drawings + engineering: $7,000–$20,000 (included in our scope)
  • Included in our scope: permit fees of $1,500–$4,000

Common Use Cases

  • In-law or family suite — Coral Gables Country Club and Riviera neighborhoods
  • Guest house conversion — historic homes near the Biltmore
  • Home office + guest space combo — Hammock Oaks and Gables Estates
  • Garage-to-ADU conversion — Coconut Grove-adjacent lots on the Gables' south side

Coral Gables' biggest trap isn't the building code — it's the Board of Architects. Because every accessory structure needs to pass Design Review Standards for massing, materials, and architectural style before a permit moves forward, the first question on every Coral Gables inquiry is whether the design will clear the board on the first submission, not just whether it meets size and setback rules. We design to the board's standards from the first sketch.

Once the design is board-ready, the HVHZ wind code sets the material budget — NOA-rated windows, doors, and roofing cost more than standard product, and those products still have to fit the approved Mediterranean or historic-style palette. We price the real number and the real design-review timeline before you sign anything.

Service Area

ADU & garage conversions throughout Coral Gables

From the Biltmore area to Gables Estates — Coral Gables is part of our Miami-Dade County market, backed by 10+ years of licensed GC experience in South Florida.

Coral Gables Country ClubRivieraHammock OaksGables EstatesBiltmore AreaOld Cutler Bay Area

Common questions

What Coral Gables homeowners ask about ADUs

The process, the cost, what needs an NOA, and what makes an ADU legal to rent in Miami-Dade.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning, NOA requirements, and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬