Palm Beach County, FL · Licensed GC CGC1531095

Close Open Permits, Fix Unpermitted Work & Resolve Code Violations in Palm Beach County

An open or expired permit, unpermitted work or a code compliance notice can stall a sale, a refinance or an insurance claim. We read the permit and violation record, do the repairs, pull the permits and manage inspections until the permit closes and the code case is resolved.

Free Estimates · Most Scheduled Same-Day

Get a Fast, No-Obligation Quote

Just your name and number — we'll call you back, usually within 24 hours.

No spam. We respond fast.

CGC1531095Licensed GC
Fixed-PriceWritten Scope
Permits PulledEvery Job
10+ YearsExperience

What Is an Open Permit on a House — and What Does an Expired Permit Mean?

A building permit is opened when the work is approved to start. It is closed when the final inspection passes. Anything in between is an open permit: a roof re-do, a bathroom remodel, a water heater, a fence, a window replacement that someone started and never finished, never called in for final, or never paid the last fee on. If the permit lapses without a final inspection it is generally treated as expired or inactive, but the record usually stays on the property's file at the building department.

Here is the part that surprises most owners: the permit belongs to the property record, not to the contractor who pulled it. If the previous owner’s roofer disappeared in 2017, you inherited the open permit when you bought the house. Palm Beach County’s own procedures treat permits as going inactive after six months without activity, and the Building Official can eventually require incomplete work to be removed, so an old permit is not harmless just because nobody has called about it.

Unpermitted work is the other half of the problem: a bathroom, addition, enclosed patio, garage conversion, electrical panel or water heater swap done with no permit at all. It is invisible until a buyer’s inspector, an appraiser, an insurance adjuster or a neighbor’s complaint brings it up.

Not legal advice. D&Co Homes is a licensed general contractor, not a law firm or title company. Permit rules, fees and procedures change and differ by jurisdiction. Confirm the details with your building department and, for contract or title questions, a Florida real estate attorney or your title company.

Selling a House With Unpermitted Work or an Open Permit in Palm Beach County

Most of the calls we get come from one of three moments, and the timing pressure is different in each:

Sellers are also expected to disclose known material defects. The current Florida seller disclosure form asks about open permits and unpermitted work, so “I didn’t think it mattered” is not a position you want to defend later.

How to Close an Open Permit on a House in Florida

Florida Statute 553.79 (updated in 2019) lets a current property owner close an open or expired permit even if they were not the one who pulled it. In practice there are three routes, and which one fits depends on the permit and the jurisdiction:

  1. Work it out directly with the building department. Some permits only need a final inspection or a small correction. Others have been inactive so long the department will review the file and tell you exactly what they still need.
  2. Hire a licensed contractor to finish the work and call in the inspections. That can be the original contractor or a new one. A new contractor is responsible only for the work they perform, not for whatever the first contractor did or didn’t do. This is the route most sellers use, and the one D&Co takes on.
  3. Owner-builder. A seller of a residential home can sometimes act as owner-builder to finish the permit. It carries real limits and responsibilities, so ask the department before assuming it applies to you.

Our process on an open-permit job:

How long does it take, and how much does it cost to close an open permit? It ranges from one inspection visit to a multi-week correction list, and the department’s fees vary by permit type and age. We will not guess over the phone; we quote after seeing the record and the work.

Sources: Florida Senate: 2019 SB 902 / HB 447 (permit closeout), Florida Statute 553.79

What Happens If You Do Unpermitted Work — Legalize It or Take It Out?

There are two honest outcomes for work that was built without a permit: make it legal after the fact, or return the space to its permitted condition. The right call depends on what it is.

For after-the-fact permits, Palm Beach County runs a Code Violation Permit Process that typically begins with as-built drawings of what is there now. We coordinate those with a licensed design professional when the department requires them, then carry the corrections through to final. The exact documents, fees and penalties depend on the department that has your address, so call them before you promise a buyer a date.

Sources: Palm Beach County Building Division, WPTV Palm Beach County reporting on permit issues

Need Help Solving a Code Compliance Violation in Palm Beach County?

A code compliance (code enforcement) case usually starts with a complaint or an inspector’s visit. In unincorporated Palm Beach County, the county’s Code Compliance Division inspects, and if it finds a violation it sends the owner a Notice of Violation with a description, a compliance date and the staff contact. Cities, including West Palm Beach, run their own code enforcement. The case is closed once the violation is corrected and a compliance inspector verifies it.

Many of these cases are really repair-and-permit jobs. Violations that commonly need a contractor include interior disrepair such as damaged walls and doors, missing or broken windows, electrical hazards, roof and exterior damage, unsafe structures, and work done without a permit. An electrical or structural repair almost always needs a permit, and the case may stay open until the permit is closed with a final inspection or a certificate of completion.

What happens if a code violation is not corrected

If the violation is not corrected by the compliance date, the case can go to a hearing. In unincorporated Palm Beach County that is a Code Compliance Special Magistrate, who can order the steps needed to comply and impose fines of up to $1,000 per day for a first violation, or $5,000 per day for a repeat violation, for each day the violation continues past the first day. If the violation is still not corrected within the time in the order, the property can be liened. Fines and liens can make a sale or refinance much harder, so the best time to act is as soon as you receive the notice.

How we help

We are a contractor, not a law firm. For fine reductions, hearings and liens, talk to a Florida attorney. Palm Beach County’s Code Compliance Division is at 2300 N. Jog Road, West Palm Beach. For city-specific help, see our guide to code enforcement violations in West Palm Beach, Boynton Beach and Lake Worth Beach. Information on this page is general and based on the county’s published process; confirm the current rules and your deadlines with the agency that issued your notice. Sources: Palm Beach County Code Compliance Process, Special Magistrate.

Who to Call: Permit Offices in Palm Beach County Cities

Permits are issued by the jurisdiction that owns your address. A house in a city is handled by that city; an unincorporated address is handled by Palm Beach County. Details below come from each department’s own pages; confirm current portals and phone numbers before you rely on them.

JurisdictionWhat we’ve confirmed
Unincorporated Palm Beach CountyBuilding Division, with the ePZB online portal and a Code Violation Permit Process for after-the-fact permits.
Palm Beach GardensBuilding Division, 10500 N Military Trail, (561) 799-4210. The city offers an online permit system and a separate Open Permit Requests portal.
Boynton BeachBuilding Division, 100 E Ocean Ave. Inspections are scheduled online through the city’s SagesGov portal by 3 PM the day before.
Delray BeachDevelopment Services / Building, (561) 243-7200. Applications are online (eServices; older pages still reference ePlans). Properties in historic districts need an extra Historic Preservation acknowledgement.
GreenacresBuilding Division, (561) 642-2059. Since April 15, 2026 permit applications go through the MGO Connect portal; email submittals are no longer accepted. Older permit records may not show online.
Royal Palm BeachBuilding office, (561) 790-5128, with e-permitting and a Click2Gov permit-tracking site.
Lake Worth BeachBuilding Division, (561) 586-1647, with an online application portal. Historic Preservation (561-586-1684) reviews projects in historic areas.
LantanaBuilding Division, 504 Greynolds Circle, (561) 540-5780. The town’s pages describe paper submittals and in-person fees, so call before you go.
West Palm BeachThe city handles its own permits and its own Code Enforcement. The city also publishes a lien reduction application that is reviewed by its Special Magistrate. Confirm the current process with the city.
Wellington, Boca Raton, Jupiter, Riviera BeachEach runs its own building department. Search your address on the city’s permit lookup or call the department.

Not sure which office holds your permit? Send us the address. Finding it is part of our first call. See the Palm Beach city guides for what is different about each city.

Sellers, Buyers, Heirs and Investors

Owners with a code compliance notice call us to fix what was cited and close the case. Sellers use us to clear permit issues before listing, or inside the contract window after a buyer’s notice. Buyers call after the inspection or title search turns up an open permit on a house they want to keep. Heirs and out-of-area owners inherit homes with a history nobody documented. Investors and flippers pick up properties with unfinished prior work and need it cleaned up before resale; see our investor services. All of them need the same thing: one licensed contractor who can read the permit file, price the real work, and show up to the inspections.

Open Permits, Unpermitted Work & Code Compliance Violations in Palm Beach County — FAQ

What is an open permit on a house?

An open permit is a building permit that was issued but never closed with a passed final inspection. It stays on the property’s record at the building department even after the owner or contractor changes.

What is an open building permit, and what does an expired building permit mean?

An open building permit is work that was approved and started but not signed off. An expired or inactive permit means time passed without required inspections or activity. In Palm Beach County, permits become inactive after six months without activity, and the Building Official can eventually require incomplete work to be removed. The record usually remains until it is closed.

Do building permits have an expiration date?

Yes. Permits generally lapse if work does not start or is not inspected within the time set by the building department. The exact timeline depends on the permit type and jurisdiction, so check with the office that issued it.

How do I close an open permit on a house in Florida?

Under Florida Statute 553.79, a current owner can close an open permit even if they did not pull it. You can work it out with the building department, hire a licensed contractor to finish the work and call in the inspections, or in some residential sales act as owner-builder. D&Co reads the permit record, checks the work, and manages the inspections through to closeout.

How much does it cost to close an open permit?

It depends on what is missing. Some permits only need a final inspection; others need corrections, drawings, or engineer letters, plus department fees that vary by permit and age. We quote after seeing the record and the work, not before.

How long does it take to close an open permit?

A permit that only needs a final inspection can close within days of scheduling. A permit with unfinished or incorrect work takes as long as the corrections and inspection scheduling require. Tell us your closing date on the first call so we plan around it.

What happens if you do unpermitted work?

Possible consequences include code enforcement fines, an order to obtain after-the-fact permits or remove the work, trouble selling or refinancing, and insurer disputes after a claim. The right fix depends on what was built.

Can I sell a house with unpermitted work in Florida?

Yes, but it has to be disclosed if you know about it, and it often becomes a negotiation or a contract-cancellation point. Many sellers fix or legalize it before listing.

Selling a house with unpermitted renovations, an electrical job, a deck, a bathroom or an addition — does each need something different?

Yes. Bathrooms and interior renovations often need inspection openings and corrections. Electrical is a safety and insurance priority. Additions and enclosed patios involve structure, egress and energy-code review. Decks and sheds are usually setback and engineering questions. We scope each one separately.

What do I do about open permits when buying a house?

Ask for the permit history early, and have your agent or attorney review the contract’s permit language before the inspection period ends. If you still want the house, get a contractor’s written scope and cost to close it so you can negotiate with real numbers.

Who pays to close an open permit in a Florida sale?

It depends on the contract. Under the standard Florida Realtors/Florida Bar contract, if the buyer gives notice of permit issues, the seller is generally expected to resolve open or expired permits and permit unpermitted work. An As-Is contract allocates it differently. A real estate attorney can tell you how your contract reads.

Can you finish the work if the original contractor disappeared or lost their license?

Often yes. A new licensed contractor can complete the work and inspections and is responsible for their own work, not the earlier contractor’s. We review the file first so you know what you are taking on.

What is a code compliance violation?

A code compliance (or code enforcement) violation means the county or city found something on your property that does not meet its codes, such as property maintenance, zoning or building rules, or work done without a permit. The owner gets a Notice of Violation with a description, a compliance date and a contact.

I received a code violation notice in Palm Beach County. What do I do?

Read the notice carefully, note the compliance date, and call the staff contact on it. Many violations can be closed by making the repair and, where required, getting the permit closed. Do not ignore the date, because cases that are not corrected may go to a Special Magistrate hearing.

What is the difference between an open permit and a code violation?

An open permit is a building permit that was never closed with a final inspection. A code violation is a finding by code enforcement that something does not comply. They often overlap: a violation can require you to pull a permit, and the case can stay open until that permit is finished. Both can block a sale or refinance.

Can a general contractor help me get a code violation cleared?

Yes. A licensed general contractor can price the repairs the notice requires, pull the permits, coordinate the trades and schedule inspections. The code officer decides when the case is in compliance, and a contractor does not control that. D&Co Homes is licensed (CGC1531095).

What happens if I do not fix a code violation by the deadline?

In unincorporated Palm Beach County, a case that is not in compliance by the date on the notice can be presented to a Special Magistrate. The magistrate can order specific steps to comply, set a new deadline, impose fines of up to $1,000 per day for a first violation or $5,000 per day for a repeat violation, and lien the property if the violation is still not corrected. Cities have their own processes. This is general information, not legal advice.

How do I close a code enforcement case in Palm Beach County?

Correct the violation, get any required permits finalized, and ask the compliance inspector to verify it. According to the county, once compliance is achieved and verified by a compliance inspector, the case is closed. If fines have already been assessed, talk to an attorney about options.

Do I need a permit to fix a code violation?

Often yes. Electrical, plumbing, structural, roofing, window and door work generally requires a permit. Some notices say so directly, such as electrical repairs that must be permitted and finished before the case is in compliance. Ask the code officer and the building department what applies to your work.

What are common code violations that need repairs?

Common ones include interior disrepair (damaged walls, doors, floors), missing or broken windows, electrical hazards, roof and exterior damage, unsafe or unfinished structures, work without a permit, and overgrown or unsanitary property conditions. Each notice cites the specific code section.

Does West Palm Beach handle code compliance separately from Palm Beach County?

Yes. Properties inside the City of West Palm Beach are handled by the city's code enforcement, while unincorporated areas are handled by the county's Code Compliance Division. Many Palm Beach County addresses, including some with city mailing addresses, are unincorporated, so check which agency issued your notice.

Can I sell a house with an open code violation or a lien?

It is possible, but it complicates the sale. Buyers, lenders and title companies check for open code cases and liens, and many want them resolved. Resolving the violation before listing, or building it into the contract, usually goes more smoothly. Talk to your agent and a real estate attorney. This is general information, not legal advice.

Can code enforcement fines be reduced?

Some jurisdictions have a process to ask for a fine or lien reduction after the property is brought into compliance. West Palm Beach, for example, publishes a lien reduction application that its Special Magistrate reviews. Availability and rules differ by agency, so ask the agency and an attorney. This is general information, not legal advice.

How quickly can you start on a code violation repair?

After we review the notice and walk the property, we send a written estimate. Timing depends on the trades, materials, permit review and inspection scheduling, so we recommend starting well before the compliance date.

Tell Us About the Permit or the Work

Send the address (and permit number if you have it). We will look up the record and call you with a plan.

Most requests get a same-day callback. Free, no-obligation quote.

WhatsApp Us Get a Quote Call Now