Palm Beach County, FL · Licensed GC CGC1531095
An open or expired permit, unpermitted work or a code compliance notice can stall a sale, a refinance or an insurance claim. We read the permit and violation record, do the repairs, pull the permits and manage inspections until the permit closes and the code case is resolved.
Free Estimates · Most Scheduled Same-Day
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
What An Open Permit Is
A building permit is opened when the work is approved to start. It is closed when the final inspection passes. Anything in between is an open permit: a roof re-do, a bathroom remodel, a water heater, a fence, a window replacement that someone started and never finished, never called in for final, or never paid the last fee on. If the permit lapses without a final inspection it is generally treated as expired or inactive, but the record usually stays on the property's file at the building department.
Here is the part that surprises most owners: the permit belongs to the property record, not to the contractor who pulled it. If the previous owner’s roofer disappeared in 2017, you inherited the open permit when you bought the house. Palm Beach County’s own procedures treat permits as going inactive after six months without activity, and the Building Official can eventually require incomplete work to be removed, so an old permit is not harmless just because nobody has called about it.
Unpermitted work is the other half of the problem: a bathroom, addition, enclosed patio, garage conversion, electrical panel or water heater swap done with no permit at all. It is invisible until a buyer’s inspector, an appraiser, an insurance adjuster or a neighbor’s complaint brings it up.
Why It Matters
Most of the calls we get come from one of three moments, and the timing pressure is different in each:
Sellers are also expected to disclose known material defects. The current Florida seller disclosure form asks about open permits and unpermitted work, so “I didn’t think it mattered” is not a position you want to defend later.
How An Open Permit Gets Closed
Florida Statute 553.79 (updated in 2019) lets a current property owner close an open or expired permit even if they were not the one who pulled it. In practice there are three routes, and which one fits depends on the permit and the jurisdiction:
Our process on an open-permit job:
How long does it take, and how much does it cost to close an open permit? It ranges from one inspection visit to a multi-week correction list, and the department’s fees vary by permit type and age. We will not guess over the phone; we quote after seeing the record and the work.
Sources: Florida Senate: 2019 SB 902 / HB 447 (permit closeout), Florida Statute 553.79
Unpermitted Work
There are two honest outcomes for work that was built without a permit: make it legal after the fact, or return the space to its permitted condition. The right call depends on what it is.
For after-the-fact permits, Palm Beach County runs a Code Violation Permit Process that typically begins with as-built drawings of what is there now. We coordinate those with a licensed design professional when the department requires them, then carry the corrections through to final. The exact documents, fees and penalties depend on the department that has your address, so call them before you promise a buyer a date.
Sources: Palm Beach County Building Division, WPTV Palm Beach County reporting on permit issues
Code Compliance & Code Enforcement
A code compliance (code enforcement) case usually starts with a complaint or an inspector’s visit. In unincorporated Palm Beach County, the county’s Code Compliance Division inspects, and if it finds a violation it sends the owner a Notice of Violation with a description, a compliance date and the staff contact. Cities, including West Palm Beach, run their own code enforcement. The case is closed once the violation is corrected and a compliance inspector verifies it.
Many of these cases are really repair-and-permit jobs. Violations that commonly need a contractor include interior disrepair such as damaged walls and doors, missing or broken windows, electrical hazards, roof and exterior damage, unsafe structures, and work done without a permit. An electrical or structural repair almost always needs a permit, and the case may stay open until the permit is closed with a final inspection or a certificate of completion.
If the violation is not corrected by the compliance date, the case can go to a hearing. In unincorporated Palm Beach County that is a Code Compliance Special Magistrate, who can order the steps needed to comply and impose fines of up to $1,000 per day for a first violation, or $5,000 per day for a repeat violation, for each day the violation continues past the first day. If the violation is still not corrected within the time in the order, the property can be liened. Fines and liens can make a sale or refinance much harder, so the best time to act is as soon as you receive the notice.
We are a contractor, not a law firm. For fine reductions, hearings and liens, talk to a Florida attorney. Palm Beach County’s Code Compliance Division is at 2300 N. Jog Road, West Palm Beach. For city-specific help, see our guide to code enforcement violations in West Palm Beach, Boynton Beach and Lake Worth Beach. Information on this page is general and based on the county’s published process; confirm the current rules and your deadlines with the agency that issued your notice. Sources: Palm Beach County Code Compliance Process, Special Magistrate.
Which Office Holds Your Permit
Permits are issued by the jurisdiction that owns your address. A house in a city is handled by that city; an unincorporated address is handled by Palm Beach County. Details below come from each department’s own pages; confirm current portals and phone numbers before you rely on them.
| Jurisdiction | What we’ve confirmed |
|---|---|
| Unincorporated Palm Beach County | Building Division, with the ePZB online portal and a Code Violation Permit Process for after-the-fact permits. |
| Palm Beach Gardens | Building Division, 10500 N Military Trail, (561) 799-4210. The city offers an online permit system and a separate Open Permit Requests portal. |
| Boynton Beach | Building Division, 100 E Ocean Ave. Inspections are scheduled online through the city’s SagesGov portal by 3 PM the day before. |
| Delray Beach | Development Services / Building, (561) 243-7200. Applications are online (eServices; older pages still reference ePlans). Properties in historic districts need an extra Historic Preservation acknowledgement. |
| Greenacres | Building Division, (561) 642-2059. Since April 15, 2026 permit applications go through the MGO Connect portal; email submittals are no longer accepted. Older permit records may not show online. |
| Royal Palm Beach | Building office, (561) 790-5128, with e-permitting and a Click2Gov permit-tracking site. |
| Lake Worth Beach | Building Division, (561) 586-1647, with an online application portal. Historic Preservation (561-586-1684) reviews projects in historic areas. |
| Lantana | Building Division, 504 Greynolds Circle, (561) 540-5780. The town’s pages describe paper submittals and in-person fees, so call before you go. |
| West Palm Beach | The city handles its own permits and its own Code Enforcement. The city also publishes a lien reduction application that is reviewed by its Special Magistrate. Confirm the current process with the city. |
| Wellington, Boca Raton, Jupiter, Riviera Beach | Each runs its own building department. Search your address on the city’s permit lookup or call the department. |
Not sure which office holds your permit? Send us the address. Finding it is part of our first call. See the Palm Beach city guides for what is different about each city.
Who We Help
Owners with a code compliance notice call us to fix what was cited and close the case. Sellers use us to clear permit issues before listing, or inside the contract window after a buyer’s notice. Buyers call after the inspection or title search turns up an open permit on a house they want to keep. Heirs and out-of-area owners inherit homes with a history nobody documented. Investors and flippers pick up properties with unfinished prior work and need it cleaned up before resale; see our investor services. All of them need the same thing: one licensed contractor who can read the permit file, price the real work, and show up to the inspections.
Common Questions
An open permit is a building permit that was issued but never closed with a passed final inspection. It stays on the property’s record at the building department even after the owner or contractor changes.
An open building permit is work that was approved and started but not signed off. An expired or inactive permit means time passed without required inspections or activity. In Palm Beach County, permits become inactive after six months without activity, and the Building Official can eventually require incomplete work to be removed. The record usually remains until it is closed.
Yes. Permits generally lapse if work does not start or is not inspected within the time set by the building department. The exact timeline depends on the permit type and jurisdiction, so check with the office that issued it.
Under Florida Statute 553.79, a current owner can close an open permit even if they did not pull it. You can work it out with the building department, hire a licensed contractor to finish the work and call in the inspections, or in some residential sales act as owner-builder. D&Co reads the permit record, checks the work, and manages the inspections through to closeout.
It depends on what is missing. Some permits only need a final inspection; others need corrections, drawings, or engineer letters, plus department fees that vary by permit and age. We quote after seeing the record and the work, not before.
A permit that only needs a final inspection can close within days of scheduling. A permit with unfinished or incorrect work takes as long as the corrections and inspection scheduling require. Tell us your closing date on the first call so we plan around it.
Possible consequences include code enforcement fines, an order to obtain after-the-fact permits or remove the work, trouble selling or refinancing, and insurer disputes after a claim. The right fix depends on what was built.
Yes, but it has to be disclosed if you know about it, and it often becomes a negotiation or a contract-cancellation point. Many sellers fix or legalize it before listing.
Yes. Bathrooms and interior renovations often need inspection openings and corrections. Electrical is a safety and insurance priority. Additions and enclosed patios involve structure, egress and energy-code review. Decks and sheds are usually setback and engineering questions. We scope each one separately.
Ask for the permit history early, and have your agent or attorney review the contract’s permit language before the inspection period ends. If you still want the house, get a contractor’s written scope and cost to close it so you can negotiate with real numbers.
It depends on the contract. Under the standard Florida Realtors/Florida Bar contract, if the buyer gives notice of permit issues, the seller is generally expected to resolve open or expired permits and permit unpermitted work. An As-Is contract allocates it differently. A real estate attorney can tell you how your contract reads.
Often yes. A new licensed contractor can complete the work and inspections and is responsible for their own work, not the earlier contractor’s. We review the file first so you know what you are taking on.
A code compliance (or code enforcement) violation means the county or city found something on your property that does not meet its codes, such as property maintenance, zoning or building rules, or work done without a permit. The owner gets a Notice of Violation with a description, a compliance date and a contact.
Read the notice carefully, note the compliance date, and call the staff contact on it. Many violations can be closed by making the repair and, where required, getting the permit closed. Do not ignore the date, because cases that are not corrected may go to a Special Magistrate hearing.
An open permit is a building permit that was never closed with a final inspection. A code violation is a finding by code enforcement that something does not comply. They often overlap: a violation can require you to pull a permit, and the case can stay open until that permit is finished. Both can block a sale or refinance.
Yes. A licensed general contractor can price the repairs the notice requires, pull the permits, coordinate the trades and schedule inspections. The code officer decides when the case is in compliance, and a contractor does not control that. D&Co Homes is licensed (CGC1531095).
In unincorporated Palm Beach County, a case that is not in compliance by the date on the notice can be presented to a Special Magistrate. The magistrate can order specific steps to comply, set a new deadline, impose fines of up to $1,000 per day for a first violation or $5,000 per day for a repeat violation, and lien the property if the violation is still not corrected. Cities have their own processes. This is general information, not legal advice.
Correct the violation, get any required permits finalized, and ask the compliance inspector to verify it. According to the county, once compliance is achieved and verified by a compliance inspector, the case is closed. If fines have already been assessed, talk to an attorney about options.
Often yes. Electrical, plumbing, structural, roofing, window and door work generally requires a permit. Some notices say so directly, such as electrical repairs that must be permitted and finished before the case is in compliance. Ask the code officer and the building department what applies to your work.
Common ones include interior disrepair (damaged walls, doors, floors), missing or broken windows, electrical hazards, roof and exterior damage, unsafe or unfinished structures, work without a permit, and overgrown or unsanitary property conditions. Each notice cites the specific code section.
Yes. Properties inside the City of West Palm Beach are handled by the city's code enforcement, while unincorporated areas are handled by the county's Code Compliance Division. Many Palm Beach County addresses, including some with city mailing addresses, are unincorporated, so check which agency issued your notice.
It is possible, but it complicates the sale. Buyers, lenders and title companies check for open code cases and liens, and many want them resolved. Resolving the violation before listing, or building it into the contract, usually goes more smoothly. Talk to your agent and a real estate attorney. This is general information, not legal advice.
Some jurisdictions have a process to ask for a fine or lien reduction after the property is brought into compliance. West Palm Beach, for example, publishes a lien reduction application that its Special Magistrate reviews. Availability and rules differ by agency, so ask the agency and an attorney. This is general information, not legal advice.
After we review the notice and walk the property, we send a written estimate. Timing depends on the trades, materials, permit review and inspection scheduling, so we recommend starting well before the compliance date.
Florida Licensed General Contractor · CGC1531095
Send the address (and permit number if you have it). We will look up the record and call you with a plan.
Most requests get a same-day callback. Free, no-obligation quote.