Whether it's a total tear-out and rebuild or just a new tile shower and vanity, the work meets Florida code, is permitted when needed, and is priced in writing first.
Before
After
Same bathroom. Real project. Central Florida.
Our Bathroom Work
How it works
One licensed GC manages everything — demolition, waterproofing, tile, plumbing, electrical, fixtures, and cleanup. You deal with one contract and one person from start to finish.
Use the form or call. We'll ask about your timeline, tile preferences, vanity and fixtures, and whether you're picturing a walk-in shower or a tub-to-shower conversion.
After a walk-through or video call you receive a written quote within 48 hours, and we point out waterproofing requirements, permit needs, and any water damage up front.
Dariceli oversees demo, waterproofing, tile, plumbing, vanity, and lighting, and each job is both inspected and guaranteed.
Final walkthrough together. We check every grout joint, every fixture, every seal. No payment released until you're satisfied.
What we do in Orlando
A new tile shower, a total bathroom tear-down and rebuild, or a vanity and fixture update — we define the scope clearly, price it in writing, and build it right.
We build walk-in showers, convert tubs to showers, and rebuild showers completely, with a proper waterproofing membrane, Schluter systems where needed, and large-format porcelain or natural stone. We don't cut corners on the substrate, because tile is only as good as what's behind it.
We demo to the studs, rough in new plumbing if needed, install a Wedi or cement board substrate, and add flooring, tile, vanity, toilet, lighting, and an exhaust fan. We handle the permit and inspection, and materials and labor are warrantied.
Vanity with plumbing hookup, toilet, exhaust fan, recessed lighting, and flooring — a big visual change for bathrooms that just need new fixtures and a floor, completed in 3–5 days.
Honest pricing
They reflect actual jobs in Orlando and Orange County. Within labor cost, tile selection is the biggest variable: large-format porcelain takes 40–60% longer to set than standard tile. You'll know the budget before any work starts.
Vanity, toilet, exhaust fan, hookups, and tile or LVP flooring, without touching walls or the shower — quick and tidy.
Tile shower rebuild or conversion plus a new vanity, toilet, flooring, lighting, and plumbing as needed. It's the scope we do most, and where our work is at its best.
Large-format natural stone or rectified porcelain, a freestanding tub, multiple shower heads, a frameless glass enclosure, a custom vanity, and full plumbing rough-in.
Orlando / Orange County · What homeowners need to know
Orange County has some of the highest humidity in the continental US, and what works in a dry-climate bathroom, or what a fast handyman installs in three days, fails differently here.
Standard bathroom tile backer board absorbs moisture over time in Central Florida's high-humidity environment. Every shower we build uses waterproofing membranes — Schluter Kerdi, Wedi board, or liquid-applied systems — that prevent moisture from reaching the wall behind the tile. The difference shows up in 5 years, not 5 months.
The City of Orlando runs its own Building & Permit Services department — separate from Orange County's Building Division. A bathroom remodel in Lake Nona or Dr. Phillips is unincorporated Orange County, not City of Orlando, even though everyone calls the area "Orlando." Submitting your permit to the wrong office costs you weeks. We confirm jurisdiction before we file anything.
Bathroom remodels that move plumbing (relocating a toilet or shower drain), add electrical circuits (GFI outlets, exhaust fans with heaters), or alter structural walls require permits through Orange County Building Division or City of Orlando Permitting Services. Cosmetic tile-over-tile work typically doesn't. We determine what requires a permit at the site visit and include permit cost in the written scope.
To avoid hollow spots that crack with Florida's seasonal temperature changes, large-format tile (24x24 and up) is back-buttered and fully bedded in mortar. We use modified thinset and grout sealers designed for humid conditions, not the cheapest option at the tile warehouse.
Dariceli oversees every bathroom project from first call to final caulk line. Plumbing, tile, electrical coordination, fixture installation — all under one GC contract. No tracking down four separate subs. No "the plumber didn't show up so now the tile is delayed." One number to call. Now active across Orlando and all of Orange County.
A vague estimate is the top cause of bathroom remodel disputes; "install tile shower" can mean ten things. Our scope in writing lists the waterproofing product, setting method, grout, fixture models, and cleanup, so you know the deal before we start and can hold us to it.
The Orlando metro spans two major permit jurisdictions and has some of the highest humidity in the state. Here is what shapes every bathroom project here.
The most common reason a Central Florida bathroom remodel fails within 5 years is inadequate waterproofing. The contractor tiled over Durock or standard cement board without a membrane, the grout cracked from humidity cycling, and moisture got behind the tile into the wall. By the time the homeowner sees a problem, there's typically mold in the wall cavity and the tile has to come down to the studs anyway.
We built our waterproofing standard in South Florida and apply the same discipline in Orlando. We also confirm jurisdiction before we file — a bathroom remodel in Lake Nona or Dr. Phillips goes through Orange County, not the City of Orlando, and getting that wrong costs weeks on the permit timeline.
Florida-specific information on bathroom remodel costs and waterproofing, from the contractor who builds them here.
From Winter Park to Kissimmee — Orlando and Orange County is our Central Florida market, backed by 10+ years of licensed GC experience in Florida.
Verified reviews from bathroom projects across Orlando and Orange County.
"Two previous contractors never mentioned waterproofing. Dariceli walked me through exactly what membrane they'd use and why. A year later, no issues — the tile looks perfect and there's no mold behind the wall."
"Tub-to-shower conversion in our primary suite. D&Co finished in 9 days, the tile work is flawless, and the frameless glass enclosure looks incredible. They stayed on schedule even when the vanity delivery was delayed."
"I manage two rental properties near Kissimmee. D&Co did both bathrooms on back-to-back weeks, same quality every time. The cost was fair, the scope was detailed, and they cleaned up after themselves. That's all I ask for."
Common questions
Questions center on waterproofing, tile, permits, and how long it takes, plus why Florida remodeling isn't like the HGTV version.
Prices around Orlando and Orange County start at $3,000 (vanity, toilet, flooring) and reach $18,000+ (full gut, large-format stone, frameless glass, custom vanity). A complete shower rebuild with new fixtures, vanity, and flooring, the most requested project, is $7,000–$12,000. Written quotes arrive within 48 hours.
Timelines: 2–4 days for a vanity and fixture update, about 7–12 days for a tile shower rebuild (tile size and scope matter), and 2–4 weeks for a full gut-and-rebuild. You'll have the project schedule in writing before work starts.
It depends on scope. Cosmetic work (new tile, new vanity in same location, fixture swap) typically does not require a permit. Moving plumbing (relocating toilet, shower drain, or sink location), adding electrical circuits, or modifying structural walls requires a permit through Orange County Building Division or City of Orlando Permitting Services, depending on your address. As your licensed GC, we determine which office your project falls under and include permit cost in your written scope — you don't have to guess.
For Florida's humidity we use Schluter Kerdi membrane systems on shower pans and walls, Wedi board (a waterproof foam-core substrate), or liquid-applied membranes such as RedGard or Mapelastic AquaDefense for complex shapes, and we name the system in your written scope. A contractor who says "we just use cement board" for a shower rebuild in Central Florida is telling you something important.
Yes. Tub-to-shower conversions are among our most frequent bathroom projects. We remove the tub and alcove, build a new shower pan with correct waterproofing, tile the walls and floor, add a frameless or semi-frameless glass enclosure, and update plumbing to a shower valve and head. Typical cost is $4,000–$9,000 depending on tile and glass, and a permit is usually needed because the plumbing configuration changes.
Yes. D&Co is operated by Dariceli Kunhardt, Florida Certified General Contractor CGC1531095, with 10+ years in construction, design, and project management. We carry full general liability insurance and workers' compensation. Verifiable at the Florida DBPR website under license CGC1531095.
Yes — labor-only is possible. Our tile, fixtures, and setting materials come at contractor and developer pricing, typically lower than retail, and we'll show you distributor pricing for comparison. Should you supply materials, we vet them beforehand for the installation method and Florida conditions.
Ready to start?
Three minutes, tops. Share the details of your bathroom and we'll get back within 1 business day with a straightforward scope and price.
Prefer email? office@dandcohomes.com
More from D&Co — Orlando