From a converted garage to a stand-alone accessory dwelling unit, we manage design, permits, and construction. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Palm Beach County code.
Free ADU Consultation
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
Representative example finishes for illustration — not a specific completed project.
Our ADU & Garage Conversion Work
How it works
You shouldn't have to learn permitting to build a second dwelling. We handle the zoning review, drawings, engineering, trades, and inspections as one connected job.
We confirm zoning, setbacks, utility access, and HOA restrictions first, because the best time to find a problem is before the drawings are paid for.
Architectural and structural drawings are prepared, permits are filed, and we stay on top of every reviewer comment. Permit costs are included in your written scope.
Foundation or conversion work, framing, roofing, electrical, plumbing, insulation, drywall, flooring, and finishes are scheduled and coordinated by us.
When the last inspection is passed, the CO makes the unit a legal dwelling. Then it is yours to rent or move into.
What we build in Palm Beach County
Palm Beach County homeowners usually weigh two paths. Converting a garage is simpler and less expensive. Building a detached unit takes longer but gives more space. We offer both.
The scope covers a new level floor, insulated walls and ceiling, mini-split air conditioning, a sub-panel, rough plumbing for kitchenette and bath, and getting the CO issued. It is often the easiest ADU to approve and build in Palm Beach County.
Separate building, new foundation, complete mechanical systems, own utility service, kitchen, bathroom, and CO. A good match for owners focused on income or a private home for relatives.
We also support owners who have their own builder. For Palm Beach County properties we prepare the plans and engineering, coordinate with the HOA, file the permit, and manage the project to the CO.
Honest pricing
Three levels of ADU, three price ranges. What moves a project within its range: how complex the structure is, what condition the existing space is in, how far utilities have to travel, and your finishes. Design, permits, and CO are included, and the total is written down before you commit.
A garage conversion reaches a certificate of occupancy fastest in Palm Beach County: existing structure, existing roof, existing footprint.
A 400–750 sq ft detached unit with a new foundation, CBS or frame build, full mechanical systems, a kitchenette or full kitchen, a bathroom, and its own utilities.
A 750–1,200+ sq ft detached unit with a full kitchen, one to two bedrooms and bathrooms, laundry hookup, and quality finishes, built for rental income or a family suite.
Palm Beach County · Property owner guide
Accessory dwelling units in Palm Beach County are governed by the ULDC's Accessory and Temporary Uses chapter, and the coastal wind code, a municipal patchwork, and HOA density all affect cost and risk. This is not work for a handyman.
West Palm Beach regulates accessory apartments under Chapter 94 of its own Zoning and Land Development Regulations — separate from the county's ULDC. Units are capped at 800 sq ft or 40% of the principal dwelling, whichever is less, and either the main house or the ADU must be owner-occupied. Eligibility and lot-width thresholds vary by single-family district. We confirm your district's standards before any design work begins.
Palm Beach County is north of the High-Velocity Hurricane Zone boundary but remains a Wind-Borne Debris Region. Ultimate design winds near the coast run about 165–175 mph and taper inland. The code requires impact-rated windows, doors, and garage doors, or engineered shutters, rated for your parcel.
West Palm Beach updated its ADU ordinance in 2022 and runs its own Planning Division review, separate from unincorporated Palm Beach County — minimum lot width (60 ft in SF14, for example) and setbacks (25 ft front, 7.5 ft side, 20 ft rear in SF14) vary by single-family district within the city itself. We confirm your specific district's standards before design begins, not after.
If you build a detached ADU you'll need an electrical sub-panel or meter, a water connection, and a sewer tap. In this county the tap fee is $3,000–$12,000 depending on the municipality, and impact fees add $5,000–$18,000 for a new detached unit. We write both into your scope.
Without a certificate of occupancy an ADU can't legally be rented, it can complicate a sale, and it can jeopardize your insurance. We build every Palm Beach County ADU toward a CO and manage the permit timeline.
Our contract covers ULDC review, wind-rated product specifications, permitting, trade coordination, and the CO, replacing the architect-engineer-trades chain you would otherwise manage. It's the design-build advantage, and we've worked this way in the county since 2019.
We have been navigating ADU permitting in Palm Beach County since 2019, including West Palm Beach's Chapter 94 code. Here is what shapes every project in this city.
West Palm Beach's biggest trap isn't the building code — it's owner-occupancy. Because Chapter 94 requires either the main house or the ADU to be owner-occupied, the first question on every West Palm Beach inquiry is whether the property qualifies as a primary residence, not what the unit will cost. We run that check in week one, before a single drawing is started.
Once eligibility clears, the coastal wind code sets the material budget. Impact-rated openings are code-required at 165–175 mph near the water, and the 800 sq ft / 40% cap means the floor plan has to work hard within a tight footprint. We price the real number against your specific parcel before you sign anything.
From El Cid to Northwood — West Palm Beach is part of our Palm Beach County market, backed by 10+ years of licensed GC experience in South Florida.
Common questions
The process, the cost, what needs a permit, and what makes an ADU legal to rent in Palm Beach County.
Only when the county or city has signed off with a dwelling-unit certificate of occupancy. If the work was never permitted, the unit cannot be legally rented, regardless of how it was built. At resale it becomes a disclosure problem, and your insurer may refuse a claim on it. We handle the permit, inspections, and CO, so you receive a unit you can lawfully rent.
Set aside 4–8 weeks for design before anything is submitted. Permit review by the West Palm Beach Planning Division takes 4–12 weeks depending on scope complexity, including verification of owner-occupancy and district eligibility under Chapter 94. We keep tabs on the permit from submission to approval and respond to review comments for you.
It depends on what your HOA covenants allow. Many HOAs in West Palm Beach restrict or prohibit ADU construction — either by requiring architectural committee approval, specifying exterior material requirements, or prohibiting external dwelling units entirely. Your HOA's documents get reviewed in our feasibility step, ahead of design spending. Without written approval, you are in violation of your covenants and open to legal action.
Under Chapter 94 of the City's Zoning and Land Development Regulations, West Palm Beach caps accessory apartments at 800 sq ft or 40% of the principal dwelling, whichever is less, and requires owner occupancy of either the main house or the ADU. Lot-width thresholds and setbacks vary by district — SF14, for example, requires a 60 ft minimum lot width with 25/7.5/20 ft setbacks. We confirm your district's standards before quoting.
ADU projects in West Palm Beach typically include: impact fees ($5,000–$18,000 for new construction), sewer tap fees ($3,000–$12,000), permit fees ($1,500–$6,000), and architectural drawings and engineering ($6,000–$18,000). They are part of our written total from the start, not add-ons discovered at permit time. A quote that covers only construction leaves out a large part of what you will actually pay.
Yes. We work under Florida Certified General Contractor license CGC1531095, which allows full-scope residential and commercial construction, including ADU design-build. With 10+ years in construction and project management, Dariceli Kunhardt runs every project in Palm Beach County. All work goes through permits and inspections under that license. The state's DBPR lookup shows the license status.
ADU cost in West Palm Beach ranges from $40,000 for a basic garage conversion to $180,000+ for a custom detached unit with 2 bedrooms and premium finishes. That range includes design work, permits, construction, and CO, rather than only the build. A 400–650 sq ft detached ADU, the most common size, totals $65,000–$110,000.
Ready to explore?
Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.