📍 West Palm Beach, FL · ADU & Garage Conversion

West Palm Beach ADU & Garage Conversions — Chapter 94 Compliant, Fully Permitted

From a converted garage to a stand-alone accessory dwelling unit, we manage design, permits, and construction. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Palm Beach County code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving West Palm Beach

Free ADU Consultation

Get a Fast, No-Obligation Quote

Just your name and number — we'll call you back, usually within 24 hours.

No spam. We respond fast.

Serving Boca Raton · Delray Beach · West Palm Beach · Boynton Beach · Lake Worth · Wellington · Jupiter · Palm Beach Gardens and all of Palm Beach County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
Exterior Example ADU exterior finish, representative style for Palm Beach County
Interior Example ADU interior finish, representative style for Palm Beach County

Representative example finishes for illustration — not a specific completed project.

How it works

How an ADU goes from idea to finished unit

You shouldn't have to learn permitting to build a second dwelling. We handle the zoning review, drawings, engineering, trades, and inspections as one connected job.

01

Feasibility

We confirm zoning, setbacks, utility access, and HOA restrictions first, because the best time to find a problem is before the drawings are paid for.

02

Design and permitting

Architectural and structural drawings are prepared, permits are filed, and we stay on top of every reviewer comment. Permit costs are included in your written scope.

03

Building

Foundation or conversion work, framing, roofing, electrical, plumbing, insulation, drywall, flooring, and finishes are scheduled and coordinated by us.

04

Certificate of occupancy

When the last inspection is passed, the CO makes the unit a legal dwelling. Then it is yours to rent or move into.

What we build in Palm Beach County

From garage to guest house: your ADU options

Palm Beach County homeowners usually weigh two paths. Converting a garage is simpler and less expensive. Building a detached unit takes longer but gives more space. We offer both.

Garage conversion

The scope covers a new level floor, insulated walls and ceiling, mini-split air conditioning, a sub-panel, rough plumbing for kitchenette and bath, and getting the CO issued. It is often the easiest ADU to approve and build in Palm Beach County.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

Separate building, new foundation, complete mechanical systems, own utility service, kitchen, bathroom, and CO. A good match for owners focused on income or a private home for relatives.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

We also support owners who have their own builder. For Palm Beach County properties we prepare the plans and engineering, coordinate with the HOA, file the permit, and manage the project to the CO.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Palm Beach County 2026

Three levels of ADU, three price ranges. What moves a project within its range: how complex the structure is, what condition the existing space is in, how far utilities have to travel, and your finishes. Design, permits, and CO are included, and the total is written down before you commit.

$40K – $65K
Garage conversion

Existing footprint

A garage conversion reaches a certificate of occupancy fastest in Palm Beach County: existing structure, existing roof, existing footprint.

  • Drawings and permit filing
  • Level floor and insulated envelope
  • Rough plumbing for bath and kitchenette
  • Mini-split and electrical sub-feed
  • Final inspection and CO
$110K – $180K+
Large or custom ADU

New large ADU

A 750–1,200+ sq ft detached unit with a full kitchen, one to two bedrooms and bathrooms, laundry hookup, and quality finishes, built for rental income or a family suite.

  • Spacious layout
  • Up to two bedrooms and baths
  • Full kitchen, appliances included
  • Washer and dryer connections
  • High-spec finish package
  • Certificate of occupancy and documents

Palm Beach County · Property owner guide

Hiring a licensed GC for a Palm Beach County ADU

Accessory dwelling units in Palm Beach County are governed by the ULDC's Accessory and Temporary Uses chapter, and the coastal wind code, a municipal patchwork, and HOA density all affect cost and risk. This is not work for a handyman.

Chapter 94: 800 Sq Ft Cap, Owner-Occupancy Required

West Palm Beach regulates accessory apartments under Chapter 94 of its own Zoning and Land Development Regulations — separate from the county's ULDC. Units are capped at 800 sq ft or 40% of the principal dwelling, whichever is less, and either the main house or the ADU must be owner-occupied. Eligibility and lot-width thresholds vary by single-family district. We confirm your district's standards before any design work begins.

Wind Code: Roughly 165–175 mph Along the Coast

Palm Beach County is north of the High-Velocity Hurricane Zone boundary but remains a Wind-Borne Debris Region. Ultimate design winds near the coast run about 165–175 mph and taper inland. The code requires impact-rated windows, doors, and garage doors, or engineered shutters, rated for your parcel.

Reviewed by the City, Not the County

West Palm Beach updated its ADU ordinance in 2022 and runs its own Planning Division review, separate from unincorporated Palm Beach County — minimum lot width (60 ft in SF14, for example) and setbacks (25 ft front, 7.5 ft side, 20 ft rear in SF14) vary by single-family district within the city itself. We confirm your specific district's standards before design begins, not after.

Sewer Tap: $3,000–$12,000

If you build a detached ADU you'll need an electrical sub-panel or meter, a water connection, and a sewer tap. In this county the tap fee is $3,000–$12,000 depending on the municipality, and impact fees add $5,000–$18,000 for a new detached unit. We write both into your scope.

Legal to Rent Only With a CO

Without a certificate of occupancy an ADU can't legally be rented, it can complicate a sale, and it can jeopardize your insurance. We build every Palm Beach County ADU toward a CO and manage the permit timeline.

One Contract, One Contact

Our contract covers ULDC review, wind-rated product specifications, permitting, trade coordination, and the CO, replacing the architect-engineer-trades chain you would otherwise manage. It's the design-build advantage, and we've worked this way in the county since 2019.

On the Ground in West Palm Beach

What ADU builders navigate in West Palm Beach

We have been navigating ADU permitting in Palm Beach County since 2019, including West Palm Beach's Chapter 94 code. Here is what shapes every project in this city.

Chapter 94 Requirements

  • Accessory apartments allowed in most single-family districts
  • Size capped at 800 sq ft or 40% of the principal dwelling, whichever is less
  • Owner occupancy required (main house or ADU)
  • SF14 district example: 60 ft min lot width, 25/7.5/20 ft setbacks
  • Reviewed by the Planning Division, (561) 822-1435

Schedule at a Glance

  • Zoning review and a feasibility pass: 1–2 weeks
  • Plans and engineering: 4–8 weeks
  • Permit submission to approval: 4–12 weeks
  • Garage conversion build: 8–14 weeks
  • Construction for a detached ADU runs 16–28 weeks
  • Last step, final inspections and CO: 1–3 weeks

Costs Beyond Construction

  • Municipal sewer tap charges run $3,000–$12,000
  • Detached ADU impact fees, Palm Beach County: $5,000–$18,000
  • We cover the architectural drawings, $4,000–$12,000, within our scope
  • Our scope includes structural engineering ($2,000–$6,000)
  • Included in our scope: permit fees of $1,500–$6,000

Common Use Cases

  • Rental income unit — single-family neighborhoods in El Cid and Flamingo Park
  • In-law or family suite — Southland Park and Grandview Heights primary homes
  • Home office + guest space combo — Northwood and SoSo
  • Pool house conversion to legal dwelling — waterfront properties near Flagler Drive

West Palm Beach's biggest trap isn't the building code — it's owner-occupancy. Because Chapter 94 requires either the main house or the ADU to be owner-occupied, the first question on every West Palm Beach inquiry is whether the property qualifies as a primary residence, not what the unit will cost. We run that check in week one, before a single drawing is started.

Once eligibility clears, the coastal wind code sets the material budget. Impact-rated openings are code-required at 165–175 mph near the water, and the 800 sq ft / 40% cap means the floor plan has to work hard within a tight footprint. We price the real number against your specific parcel before you sign anything.

Service Area

ADU & garage conversions throughout West Palm Beach

From El Cid to Northwood — West Palm Beach is part of our Palm Beach County market, backed by 10+ years of licensed GC experience in South Florida.

El CidFlamingo ParkSouthland ParkGrandview HeightsNorthwoodSoSo

Common questions

What West Palm Beach homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Palm Beach County.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬