Convert the garage or build a detached accessory dwelling unit, with design and permitting taken care of. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Hillsborough County and city jurisdiction confirmed per parcel before we quote.
Free ADU Consultation
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
Representative example finishes for illustration — not a specific completed project.
Our ADU & Garage Conversion Work
How it works
Each ADU follows the same four phases. What changes from property to property is how long each phase takes, and that depends on zoning, the permit office, and the site.
We review the property, local zoning, setbacks, utility connections, and HOA documents so the plan starts from facts.
Plans and structural engineering are prepared and filed. We manage permit review, including correction requests, with permit fees covered by your written scope.
Our team builds the unit and brings in licensed trades for electrical, plumbing, and mechanical work, all on one schedule.
Each trade is inspected and the certificate of occupancy is issued before we call the job complete.
What we build in Tampa
A garage conversion is often the most economical way to add a legal unit in Tampa, while a detached ADU suits larger lots and longer-term income plans. We handle both start to finish.
Work includes leveling the floor, upgrading insulation, installing mini-split HVAC and an electrical sub-feed, roughing in plumbing for a kitchenette and bath, and finishing the CO application. Frequently the best-value ADU in Tampa.
A new dwelling on its own foundation with complete systems, separate utilities, a kitchen, and a bath. Well suited to owners who want to maximize rent or create an independent space for family.
Design and permitting only is also available in Tampa. We produce drawings and engineering, coordinate HOA approvals, file permits, and manage the project to CO while your own builder does the construction.
Honest pricing
Price depends on how complex the structure is, what shape the existing space is in, how far the utility connections are, and which finishes you choose. Each range includes design, permits, and the certificate of occupancy. We put the total in writing first.
Starting from a finished shell makes this the fastest way to a legal unit in Tampa. Existing roof, existing walls, existing footprint.
A new detached ADU in the 400–750 sq ft range, with new foundation, CBS or frame structure, full systems, a kitchenette or kitchen, a bath, and separate utilities.
A 750–1,200+ sq ft detached ADU with full kitchen, one to two bedrooms, one to two bathrooms, laundry connections, and high-end finishes, suited to long-term tenants or family.
Tampa / Hillsborough County · What property owners need to know
Hillsborough County's Land Development Code runs through Ordinance 92-5 as amended — and Tampa Bay's wind code sits in a middle band between inland Orlando and the Gulf Coast counties to the south.
The City of Tampa runs its own Construction Services Center — separate from Hillsborough County's Development Services Department, which administers the county's Land Development Code (Ordinance 92-5, as amended). Carrollwood, Riverview, and Town 'n' Country are unincorporated Hillsborough County, not City of Tampa, even though people call the whole area "Tampa." We confirm jurisdiction before we quote — not after you've paid for drawings.
Hillsborough County's ultimate design wind speed runs roughly 140–160 mph depending on how close your lot sits to Tampa Bay — higher than inland Orlando but below the HVHZ counties. Waterfront and bay-adjacent parcels typically land at the top of that range and need impact-rated openings; inland New Tampa and Brandon lots are often lower. We verify the exact figure for your address before specifying materials.
A significant share of Hillsborough County homes — especially in Riverview, FishHawk, New Tampa, and Westchase — are in HOA communities with restrictions on ADU construction, including setbacks from property lines, exterior materials, roofline requirements, and architectural review timelines of 30–60 days. We review your HOA or condo association documents and CC&Rs before any money is spent on design. Building without approval is a covenant violation with real legal exposure.
Detached ADUs require electrical service (new sub-panel or meter), water connection, and sewer tap. In Hillsborough County, impact fees for new construction can run $8,000–$18,000 on top of utility connection costs charged by Tampa Water or Hillsborough County Public Utilities, depending on which serves your address. We include the full fee assessment in your written scope — not a rough estimate.
An unpermitted "in-law suite" can't be legally rented, has no standing at resale, and can jeopardize your homeowner's insurance. We build every Tampa-area ADU toward a certificate of occupancy at close-out — the permit timeline is ours to manage, and the project isn't done until the CO is in your hands.
Jurisdiction confirmation, wind-rated product specs, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself, now available across Tampa and all of Hillsborough County.
We bring the same feasibility-first ADU process we built in South Florida to Tampa. Here is what shapes every project here.
Tampa's Land Development Code runs through Ordinance 92-5 as amended, administered by Hillsborough County's Development Services Department — separate from the City of Tampa's own Construction Services Center. Whether your lot is inside city limits or in unincorporated areas like Carrollwood or Town 'n' Country decides which office reviews your permit, so that's the first thing we confirm.
Wind exposure near Tampa Bay is the other variable — waterfront and bay-adjacent lots land near the top of the county's 140–160 mph range and need impact-rated openings, while inland New Tampa and Brandon often don't. We verify the exact figure for your address and put impact fees ($8,000–$18,000) and utility costs in writing before you sign.
From South Tampa to Brandon — Tampa and Hillsborough County is our Tampa Bay market, backed by 10+ years of licensed GC experience in Florida.
Common questions
The process, the cost, what needs a permit, and what makes an ADU legal to rent in Tampa.
ADU cost in Tampa and Hillsborough County ranges from $40,000 for a basic garage conversion to $180,000+ for a custom detached unit with 2 bedrooms and premium finishes. What we price covers more than labor: design, permits, build, and CO. Most detached units (400–650 sq ft) come in at $65,000–$110,000 all-in.
No, not without a certificate of occupancy for a dwelling unit. A conversion done without permits, however nicely finished, cannot be rented legally. Expect trouble at closing too, since it must be disclosed, and your homeowner's policy may not cover it. We don't hand over a project until the CO is in hand, so there is nothing to fix before you rent.
Drawings and design usually run 4–8 weeks. Permit review by Hillsborough County Development Services or the City of Tampa takes 4–12 weeks depending on scope complexity and jurisdiction. We check in on the review regularly and deal with the permit office so you don't have to.
That comes down to your CC&Rs or condo documents. Many HOAs and communities in Hillsborough County — especially in Riverview, FishHawk, and Westchase — restrict or prohibit ADU construction — either by requiring architectural committee approval, specifying exterior material requirements, or prohibiting external dwelling units entirely. Florida's Live Local Act limits what local zoning can prohibit, but HOA covenants are a separate legal layer. We pull and read the governing documents at the start, so you know where you stand before drawings begin.
Setback and square-footage limits are set locally and differ by zoning. The City of Tampa, Plant City, Temple Terrace, and unincorporated Hillsborough County each have different rules on lot size, setbacks, and maximum ADU square footage relative to the main dwelling. Before we price anything, we confirm what your lot allows.
ADU projects in Hillsborough County typically include: impact fees ($8,000–$18,000 for new construction), utility connection fees ($3,000–$12,000), permit fees ($1,200–$3,500), and architectural drawings and engineering ($6,000–$18,000). We put these in writing at the start, so the permit office never changes your budget. If a contractor prices just the build and skips these fees, the number you see is incomplete.
Yes. D&Co holds Florida Certified General Contractor license CGC1531095, which covers all phases of residential and commercial construction, ADU design-build included. With 10+ years in construction and project management, Dariceli Kunhardt runs every project. Permits and inspections are pulled under our own GC license. You can confirm it on the Florida DBPR website.
Ready to explore?
Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.
Prefer email? office@dandcohomes.com
More from D&Co — Tampa