Add a legal second unit to your property, either by converting the garage or building a detached cottage. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Sarasota County and city jurisdiction confirmed per parcel before we quote.
Free ADU Consultation
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
Representative example finishes for illustration — not a specific completed project.
Our ADU & Garage Conversion Work
How it works
From the first visit to the last inspection, you deal with one company. That means one contract, one schedule, and one point of contact for questions.
We walk the property, review zoning and setbacks, check utility locations, and ask about HOA rules, then tell you what is possible and what it is likely to cost.
Our designers and engineers prepare the plans and we file them. We respond to the building department so you don't have to, and permit fees are included in the scope.
Site work, framing, systems, insulation, drywall, flooring, and the kitchenette and bathroom move forward in order under our license.
Inspections are passed, the CO is issued, and we hand you the keys to a legal, finished dwelling.
What we build in Sarasota
In Sarasota, a garage conversion is usually the quickest and least expensive way to add a legal dwelling. A detached unit on a larger lot gives you more space and more rental potential. We build both.
We turn an existing attached or detached garage into permitted living space: leveled floor, upgraded insulation, mini-split cooling, a sub-panel, plumbing for a kitchenette and bathroom, and the CO application. Often the most efficient ADU route in Sarasota.
A separate dwelling on your lot with its own foundation, mechanical systems, utility connections, kitchen, and bath, finished with a certificate of occupancy. A strong choice if you want rental income or an independent home for family.
Already working with a builder but stuck on approvals in Sarasota? We can prepare architectural drawings and engineering, coordinate HOA approvals, file the permit, and manage the project through CO, without doing the construction.
Honest pricing
Four things move the price most: the complexity of the build, the current condition of any space we convert, the distance to utility connections, and your finish selections. These figures include design, permits, and CO, and you receive one all-in written quote.
In Sarasota, a garage conversion typically reaches a certificate of occupancy sooner than any other ADU type, because the structure is already in place.
A 400–750 sq ft stand-alone unit built on a new foundation with CBS or frame construction, full mechanicals, kitchenette or full kitchen, bathroom, and independent utilities.
A 750–1,200+ sq ft unit that includes a full kitchen, up to two bedrooms and two baths, a laundry hookup, and quality finishes, designed for long-term renters or family.
Sarasota County · What property owners need to know
Sarasota's ADU ordinance caps unit size at 650 sq ft and bans ADUs outright on the barrier islands — two rules that catch homeowners off guard more than any permit paperwork does.
Sarasota's ADU ordinance caps unit size at 650 sq ft and height at 24 ft (2 stories in the Downtown Neighborhood district) — and ADUs are not permitted at all within the Coastal Islands Overlay District, which covers Siesta Key, Lido Key, and the other barrier islands. In RSF zones, the owner must also occupy either the main house or the ADU. We confirm your parcel falls outside the overlay before you spend a dollar on design.
The City of Sarasota runs its own Building & Permitting office — separate from Sarasota County's Building Division. Palmer Ranch and Fruitville are unincorporated Sarasota County, not City of Sarasota, and Venice and North Port are separate jurisdictions entirely. We confirm jurisdiction before we quote — not after you've paid for drawings.
Sarasota County's design wind speeds run roughly 155–165 mph near the coast on the FBC's Central Gulf Coast wind map, tapering inland toward Fruitville and North Port. Impact-rated openings are required by code on most ADU builds here. We verify the exact figure for your address before specifying materials.
Detached ADUs require electrical service (new sub-panel or meter), water connection, and sewer tap. In Sarasota County, impact fees for new construction can run $8,000–$18,000 on top of Sarasota County Utilities or City of Sarasota connection costs. We include a full fee assessment in the written scope — not a rough estimate.
An unpermitted "in-law suite" can't be legally rented, has no standing at resale, and can jeopardize your homeowner's insurance. We build every Sarasota-area ADU toward a certificate of occupancy at close-out — the permit timeline is ours to manage, and the project isn't done until the CO is in your hands.
Overlay-district and zoning confirmation, architectural drawings, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself, now available across Sarasota and all of Sarasota County.
We bring the same feasibility-first ADU process we built in South Florida to Sarasota. Here is what shapes every project here.
Before we talk cost, we check two things specific to this county: whether your ADU fits the 650 sq ft / 24 ft height cap, and whether your lot sits inside the Coastal Islands Overlay District — Siesta Key, Lido Key, and the other barrier islands, where ADUs aren't permitted at all regardless of lot size or budget. That filter alone rules out a meaningful share of inquiries we get.
For everything else, wind exposure and jurisdiction set the number. Coastal parcels run near 165 mph and need impact-rated product; City of Sarasota, Venice, and North Port each review permits separately from the county. We confirm both, then put impact fees ($8,000–$18,000) and utility costs in writing before you sign.
From Siesta Key to North Port — Sarasota County is our Southwest Florida market, backed by 10+ years of licensed GC experience in Florida.
Common questions
The process, the cost, what needs a permit, and what makes an ADU legal to rent in Sarasota.
Legally, only with a certificate of occupancy that lists it as a dwelling unit. A polished but unpermitted conversion still cannot be rented under Florida law. It also has to be disclosed when you sell and can put your homeowner's coverage at risk. Because we stay on through final inspection and CO, the unit is legal, insurable, and rentable when we hand it over.
First, 4–8 weeks for design and engineering drawings. Permit review by Sarasota County Building Division or the City of Sarasota takes 4–12 weeks depending on scope complexity and jurisdiction. Tracking the application and answering reviewer comments is our job, not yours.
It varies by community, so your HOA or condo documents come first. Many HOAs and communities in Sarasota — especially in Palmer Ranch and gated developments near Lakewood Ranch — restrict or prohibit ADU construction — either by requiring architectural committee approval, specifying exterior material requirements, or prohibiting external dwelling units entirely. Florida's Live Local Act limits what local zoning can prohibit, but HOA covenants are a separate legal layer. Our feasibility review includes your HOA or condo documents, and it comes before the design phase.
There is no single answer; setbacks and size caps follow the zoning and the local government. The City of Sarasota, Venice, North Port, and unincorporated Sarasota County each have different rules on lot size, setbacks, and maximum ADU square footage relative to the main dwelling. We check the specifics of your property before any quote or design work.
ADU projects in Sarasota County typically include: impact fees ($8,000–$18,000 for new construction), utility connection fees ($3,000–$12,000), permit fees ($1,200–$3,500), and architectural drawings and engineering ($6,000–$18,000). You will see every one of these line by line in our written total. Compare bids carefully, because many price the construction alone and leave these fees for later.
Yes. License CGC1531095 is our Florida Certified General Contractor credential, and it covers ADU design-build from first drawing to final inspection. Behind the license is Dariceli Kunhardt, with 10+ years in construction and development. Every job is permitted and inspected under our GC license. Feel free to check the license number with Florida DBPR.
ADU cost in Sarasota County ranges from $40,000 for a basic garage conversion to $180,000+ for a custom detached unit with 2 bedrooms and premium finishes. Pricing is all-in: design, permit fees, construction, and certificate of occupancy. Common 400–650 sq ft detached builds total $65,000–$110,000, all-in.
Ready to explore?
Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.