📍 Sarasota County, FL · ADU & Garage Conversion

Sarasota ADU & Garage Conversions — Overlay-District Cleared, Fully Permitted

Add a legal second unit to your property, either by converting the garage or building a detached cottage. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Sarasota County and city jurisdiction confirmed per parcel before we quote.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Sarasota County

Free ADU Consultation

Get a Fast, No-Obligation Quote

Just your name and number — we'll call you back, usually within 24 hours.

No spam. We respond fast.

Serving Sarasota · Siesta Key · Venice · North Port · Longboat Key · Osprey · Nokomis · Palmer Ranch and all of Sarasota County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
Exterior Example ADU exterior finish, representative style for the Sarasota area
Interior Example ADU interior finish, representative style for the Sarasota area

Representative example finishes for illustration — not a specific completed project.

How it works

Building an ADU with us: what to expect

From the first visit to the last inspection, you deal with one company. That means one contract, one schedule, and one point of contact for questions.

01

Initial assessment

We walk the property, review zoning and setbacks, check utility locations, and ask about HOA rules, then tell you what is possible and what it is likely to cost.

02

Drawings and permit submission

Our designers and engineers prepare the plans and we file them. We respond to the building department so you don't have to, and permit fees are included in the scope.

03

Construction phase

Site work, framing, systems, insulation, drywall, flooring, and the kitchenette and bathroom move forward in order under our license.

04

Completion

Inspections are passed, the CO is issued, and we hand you the keys to a legal, finished dwelling.

What we build in Sarasota

ADU types: garage conversion or detached build

In Sarasota, a garage conversion is usually the quickest and least expensive way to add a legal dwelling. A detached unit on a larger lot gives you more space and more rental potential. We build both.

Garage conversion

We turn an existing attached or detached garage into permitted living space: leveled floor, upgraded insulation, mini-split cooling, a sub-panel, plumbing for a kitchenette and bathroom, and the CO application. Often the most efficient ADU route in Sarasota.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A separate dwelling on your lot with its own foundation, mechanical systems, utility connections, kitchen, and bath, finished with a certificate of occupancy. A strong choice if you want rental income or an independent home for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Already working with a builder but stuck on approvals in Sarasota? We can prepare architectural drawings and engineering, coordinate HOA approvals, file the permit, and manage the project through CO, without doing the construction.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Sarasota 2026

Four things move the price most: the complexity of the build, the current condition of any space we convert, the distance to utility connections, and your finish selections. These figures include design, permits, and CO, and you receive one all-in written quote.

$40K – $65K
Garage conversion

Garage already built

In Sarasota, a garage conversion typically reaches a certificate of occupancy sooner than any other ADU type, because the structure is already in place.

  • Plans and permit submission
  • New floor, insulation
  • Kitchenette and bath plumbing
  • Sub-panel and mini-split HVAC
  • CO issued at close-out
$110K – $180K+
Large or custom ADU

Custom detached home

A 750–1,200+ sq ft unit that includes a full kitchen, up to two bedrooms and two baths, a laundry hookup, and quality finishes, designed for long-term renters or family.

  • Large footprint design
  • One or two bedrooms and baths
  • Kitchen with appliances
  • Laundry hookup
  • Upgraded finishes
  • CO and closeout file

Sarasota County · What property owners need to know

Why ADU permitting in Sarasota requires a licensed GC

Sarasota's ADU ordinance caps unit size at 650 sq ft and bans ADUs outright on the barrier islands — two rules that catch homeowners off guard more than any permit paperwork does.

650 Sq Ft Cap, No Barrier-Island ADUs

Sarasota's ADU ordinance caps unit size at 650 sq ft and height at 24 ft (2 stories in the Downtown Neighborhood district) — and ADUs are not permitted at all within the Coastal Islands Overlay District, which covers Siesta Key, Lido Key, and the other barrier islands. In RSF zones, the owner must also occupy either the main house or the ADU. We confirm your parcel falls outside the overlay before you spend a dollar on design.

Dual Jurisdiction: City vs. County

The City of Sarasota runs its own Building & Permitting office — separate from Sarasota County's Building Division. Palmer Ranch and Fruitville are unincorporated Sarasota County, not City of Sarasota, and Venice and North Port are separate jurisdictions entirely. We confirm jurisdiction before we quote — not after you've paid for drawings.

Wind Code Up to 165 mph

Sarasota County's design wind speeds run roughly 155–165 mph near the coast on the FBC's Central Gulf Coast wind map, tapering inland toward Fruitville and North Port. Impact-rated openings are required by code on most ADU builds here. We verify the exact figure for your address before specifying materials.

Impact Fees: $8,000–$18,000

Detached ADUs require electrical service (new sub-panel or meter), water connection, and sewer tap. In Sarasota County, impact fees for new construction can run $8,000–$18,000 on top of Sarasota County Utilities or City of Sarasota connection costs. We include a full fee assessment in the written scope — not a rough estimate.

No CO, No Legal Rental

An unpermitted "in-law suite" can't be legally rented, has no standing at resale, and can jeopardize your homeowner's insurance. We build every Sarasota-area ADU toward a certificate of occupancy at close-out — the permit timeline is ours to manage, and the project isn't done until the CO is in your hands.

One Contract, Soup to Nuts

Overlay-district and zoning confirmation, architectural drawings, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself, now available across Sarasota and all of Sarasota County.

On the Ground in Sarasota County

What ADU builders navigate in the Sarasota market

We bring the same feasibility-first ADU process we built in South Florida to Sarasota. Here is what shapes every project here.

Zoning by Jurisdiction

  • Sarasota County unincorporated (Siesta Key, Palmer Ranch, Fruitville): ADU eligibility depends on county zoning and is confirmed per parcel
  • City of Sarasota: separate ADU ordinance with its own design and setback standards, stricter in flood-zone areas
  • Venice and North Port: each run separate application processes through city planning
  • Siesta Key and Longboat Key projects face FEMA 50% rule review on any structural addition

Typical Timeline

  • Feasibility and jurisdiction review: 1–2 weeks
  • Architectural plans plus engineering: 4–8 weeks
  • Building department review typically takes 4–12 weeks
  • Building a garage conversion takes 8–14 weeks
  • Detached ADU construction phase: 16–28 weeks
  • Final inspections, then CO, within 1–3 weeks of completion

Fees and Costs to Plan For

  • Budget $8,000–$18,000 for impact fees on a detached ADU in Sarasota County
  • Connecting utilities, meaning sub-panel, water, and sewer, costs $3,000–$12,000
  • Architectural drawings, $4,000–$12,000, are part of our scope
  • Structural engineering costs $2,000–$6,000; we include it
  • Permit fees, $1,200–$3,500, are already in our price

Common Use Cases

  • Rental income unit — Venice, North Port, and Palmer Ranch
  • In-law or family suite — Osprey and Nokomis primary homes on larger lots
  • Short-term rental / investment ADU — common near Siesta Key and downtown Sarasota
  • Home office + guest space combo — Palmer Ranch and Gulf Gate

Before we talk cost, we check two things specific to this county: whether your ADU fits the 650 sq ft / 24 ft height cap, and whether your lot sits inside the Coastal Islands Overlay District — Siesta Key, Lido Key, and the other barrier islands, where ADUs aren't permitted at all regardless of lot size or budget. That filter alone rules out a meaningful share of inquiries we get.

For everything else, wind exposure and jurisdiction set the number. Coastal parcels run near 165 mph and need impact-rated product; City of Sarasota, Venice, and North Port each review permits separately from the county. We confirm both, then put impact fees ($8,000–$18,000) and utility costs in writing before you sign.

Service Area

ADU & garage conversions throughout Sarasota County

From Siesta Key to North Port — Sarasota County is our Southwest Florida market, backed by 10+ years of licensed GC experience in Florida.

SarasotaSiesta KeyVeniceNorth PortLongboat KeyOspreyNokomisPalmer Ranch

Common questions

What Sarasota homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Sarasota.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬