📍 Sarasota County, FL · ADU & Garage Conversion

Sarasota ADU & Garage Conversions — Overlay-District Cleared, Fully Permitted

From garage conversion to fully detached accessory dwelling unit. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Florida Live Local Act by-right ADU approval in Sarasota County.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Sarasota County
Serving Sarasota · Siesta Key · Venice · North Port · Longboat Key · Osprey · Nokomis · Palmer Ranch and all of Sarasota County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
★★★★★ 5-Star Rated
Exterior Example ADU exterior finish, representative style for the Sarasota area
Interior Example ADU interior finish, representative style for the Sarasota area

Representative example finishes for illustration — not a specific completed project.

How it works

From idea to certificate of occupancy

ADUs involve zoning review, architectural drawings, engineering, multiple permit departments, and a final CO inspection. We manage the entire process under one contract — you don't project-manage it.

01

Feasibility & vision

We review your lot, zoning, setbacks, utility connections, and HOA restrictions before you spend a dollar on drawings. We tell you what's buildable before anyone gets excited about floor plans.

02

Design & permit

Architectural drawings, structural engineering, and permit submission. We manage the back-and-forth with the Building Division, Zoning, and any required HOA approvals. Permit fees included in written scope.

03

Construction

Foundation, framing, roofing, electrical, plumbing, insulation, drywall, flooring, kitchen or kitchenette, bathroom — all trades coordinated under our GC license.

04

CO & handoff

Final inspections across all trades, CO issued by the county. You receive a completed, legal dwelling unit with a certificate of occupancy — ready to rent or move family in.

What we build in Sarasota

ADU types — from garage conversion to detached build

Garage conversions are the fastest and most cost-effective ADU option in Sarasota. Detached ADUs on large lots offer more flexibility and rental income potential. We build both.

Garage conversion

Convert your existing attached or detached garage into a legal, permitted living space. We handle the floor leveling, insulation upgrade, mini-split HVAC, electrical panel sub-feed, plumbing rough-in for a kitchenette and bathroom, and CO application. Most efficient ADU path in Sarasota.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A standalone dwelling unit built on your lot — separate from the main house. New foundation, full mechanical systems, its own utility connections, kitchen, bathroom, and CO. Best option for maximizing rental income or creating a fully independent living space for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Already have a builder but need help getting through the Sarasota County or City of Sarasota permit process? We provide architectural drawings, engineering, HOA approval coordination, permit submission, and project management through CO — without doing the construction ourselves.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Sarasota 2026

ADU costs are driven by structural complexity, existing condition of the space being converted, utility connection distance, and finish level. These ranges include design, permits, and CO — not just construction. We quote the total project cost in writing before you commit.

$40K – $65K
Garage conversion

Existing structure

Convert an attached or detached garage into a legal ADU. Fastest path to a CO'd unit in Sarasota — existing structure, existing roof, existing footprint.

  • Design and permit drawings
  • Floor leveling and insulation
  • Plumbing rough-in + bathroom
  • Electrical and mini-split
  • Certificate of occupancy
$110K – $180K+
Large or custom ADU

Full dwelling unit

750–1,200+ sq ft detached ADU with full kitchen, 1–2 bedrooms, 1–2 bathrooms, laundry hookup, and high-spec finishes. Designed for long-term rental income or a permanent family suite.

  • Up to 1,200 sq ft
  • 1–2 bed / 1–2 bath
  • Full kitchen with appliances
  • Washer / dryer hookup
  • Premium finishes
  • Full CO and documentation

Sarasota County · What property owners need to know

Why ADU permitting in Sarasota requires a licensed GC

Sarasota's ADU ordinance caps unit size at 650 sq ft and bans ADUs outright on the barrier islands — two rules that catch homeowners off guard more than any permit paperwork does.

650 Sq Ft Cap, No Barrier-Island ADUs

Sarasota's ADU ordinance caps unit size at 650 sq ft and height at 24 ft (2 stories in the Downtown Neighborhood district) — and ADUs are not permitted at all within the Coastal Islands Overlay District, which covers Siesta Key, Lido Key, and the other barrier islands. In RSF zones, the owner must also occupy either the main house or the ADU. We confirm your parcel falls outside the overlay before you spend a dollar on design.

Dual Jurisdiction: City vs. County

The City of Sarasota runs its own Building & Permitting office — separate from Sarasota County's Building Division. Palmer Ranch and Fruitville are unincorporated Sarasota County, not City of Sarasota, and Venice and North Port are separate jurisdictions entirely. We confirm jurisdiction before we quote — not after you've paid for drawings.

Wind Code Up to 165 mph

Sarasota County's design wind speeds run roughly 155–165 mph near the coast on the FBC's Central Gulf Coast wind map, tapering inland toward Fruitville and North Port. Impact-rated openings are required by code on most ADU builds here. We verify the exact figure for your address before specifying materials.

Impact Fees: $8,000–$18,000

Detached ADUs require electrical service (new sub-panel or meter), water connection, and sewer tap. In Sarasota County, impact fees for new construction can run $8,000–$18,000 on top of Sarasota County Utilities or City of Sarasota connection costs. We include a full fee assessment in the written scope — not a rough estimate.

No CO, No Legal Rental

An unpermitted "in-law suite" can't be legally rented, has no standing at resale, and can jeopardize your homeowner's insurance. We build every Sarasota-area ADU toward a certificate of occupancy at close-out — the permit timeline is ours to manage, and the project isn't done until the CO is in your hands.

One Contract, Soup to Nuts

Overlay-district and zoning confirmation, architectural drawings, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself, now available across Sarasota and all of Sarasota County.

On the Ground in Sarasota County

What ADU builders navigate in the Sarasota market

We bring the same feasibility-first ADU process we built in South Florida to Sarasota. Here is what shapes every project here.

Zoning by Jurisdiction

  • Sarasota County unincorporated (Siesta Key, Palmer Ranch, Fruitville): ADUs allowed by-right under Florida's Live Local Act on qualifying lots
  • City of Sarasota: separate ADU ordinance with its own design and setback standards, stricter in flood-zone areas
  • Venice and North Port: each run separate application processes through city planning
  • Siesta Key and Longboat Key projects face FEMA 50% rule review on any structural addition

Typical Timeline

  • Feasibility + jurisdiction review: 1–2 weeks
  • Architectural drawings + engineering: 4–8 weeks
  • Permit submission and review: 4–12 weeks (varies by jurisdiction)
  • Construction — garage conversion: 8–14 weeks
  • Construction — detached ADU: 16–28 weeks
  • Final inspections + CO: 1–3 weeks after construction complete

Cost Variables to Know

  • Impact fees: $8,000–$18,000 for new detached ADU in Sarasota County
  • Utility connection (sub-panel, water, sewer): $3,000–$12,000
  • Architectural drawings: $4,000–$12,000 (included in our scope)
  • Structural engineering: $2,000–$6,000 (included in our scope)
  • Permit fees: $1,200–$3,500 (included in our scope)

Common Use Cases

  • Rental income unit — Venice, North Port, and Palmer Ranch
  • In-law or family suite — Osprey and Nokomis primary homes on larger lots
  • Short-term rental / investment ADU — common near Siesta Key and downtown Sarasota
  • Home office + guest space combo — Palmer Ranch and Gulf Gate

Before we talk cost, we check two things specific to this county: whether your ADU fits the 650 sq ft / 24 ft height cap, and whether your lot sits inside the Coastal Islands Overlay District — Siesta Key, Lido Key, and the other barrier islands, where ADUs aren't permitted at all regardless of lot size or budget. That filter alone rules out a meaningful share of inquiries we get.

For everything else, wind exposure and jurisdiction set the number. Coastal parcels run near 165 mph and need impact-rated product; City of Sarasota, Venice, and North Port each review permits separately from the county. We confirm both, then put impact fees ($8,000–$18,000) and utility costs in writing before you sign.

Service Area

ADU & garage conversions throughout Sarasota County

From Siesta Key to North Port — Sarasota County is our Southwest Florida market, backed by 10+ years of licensed GC experience in Florida.

SarasotaSiesta KeyVeniceNorth PortLongboat KeyOspreyNokomisPalmer Ranch
Real Sarasota Clients

What property owners say about our ADU work

Verified reviews from ADU and garage conversion projects across Sarasota County.

★★★★★

"Dariceli told us upfront that our HOA in Palmer Ranch would need to approve before any drawings were started. We got approval first, then permitted, then built. CO in hand 7 months after we first called. The process was exactly what she described."

SM

Susan M.

Palmer Ranch — Detached ADU, 640 sq ft

★★★★★

"Garage conversion in Gulf Gate. D&Co handled the drawings, the permit, all the trades, and the CO. My mother moved in within 4 months. The biggest thing was knowing the full cost upfront — no surprises on impact fees or utility hookups."

GR

George R.

Gulf Gate — Garage Conversion to ADU

★★★★★

"I rent the unit out seasonally near Siesta Key. The total project cost was $81,000. I had two other contractors tell me they 'couldn't guarantee a CO.' D&Co was the only one who built it into the contract. That mattered more than the price."

NP

Nancy P.

Siesta Key — Detached ADU, 540 sq ft rental

Common questions

What Sarasota homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Sarasota.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬