📍 Orlando / Orange County, FL · ADU & Garage Conversion

Orlando ADU & Garage Conversions — Fully Permitted, Start to Finish

Garage conversion or detached accessory dwelling unit: one team for the design, the permits, and the build. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. City of Orlando and Orange County jurisdiction confirmed before we quote.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Orlando / Orange County

Free ADU Consultation

Get a Fast, No-Obligation Quote

Just your name and number — we'll call you back, usually within 24 hours.

No spam. We respond fast.

Free Instant Tool

ADU Eligibility Check

Answer a few quick questions about your property and get an instant read on your ADU potential in Orange County.

Serving Orlando · Winter Park · Kissimmee · Apopka · Ocoee · Winter Garden · Dr. Phillips · Lake Nona and all of Orange County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
Exterior Example ADU exterior finish, representative style for Central Florida
Interior Example ADU interior finish, representative style for Central Florida

Representative example finishes for illustration — not a specific completed project.

How it works

Our ADU process, step by step

ADUs combine zoning, design, engineering, and construction in a way few other projects do. We keep those pieces under one roof and one contract, with one person to call.

01

Review

A close look at your parcel: what zoning allows, how much room there is, where utilities are, and whether HOA rules apply. You get honest feedback before spending on plans.

02

Plan & file

We draw the unit, have it engineered, and submit it for permit. Questions from the building department come to us, and permit fees are included in our estimate.

03

Construct

All trades work from one schedule under our general contractor license, from structure and mechanicals through to flooring and fixtures.

04

Certify & hand over

Final inspections are completed, the certificate of occupancy is issued, and you receive a unit that is ready to use.

What we build in Orlando

Types of ADU we build

In Orlando, the question is usually whether to convert the garage or build a separate unit. Conversions are quicker and cheaper; detached units offer more room and rental potential. Either way you get a legal, permitted dwelling.

Garage conversion

Includes a level floor, insulation upgrade, mini-split HVAC, electrical sub-feed, plumbing for a kitchenette and bathroom, and the CO application. For many properties in Orlando it is the leanest ADU option.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

An independent structure with its own foundation, utilities, kitchen, and bathroom, finished with a CO. Best when maximum rental income or a fully separate home for family is the goal.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

If another contractor will build, we can still help in Orlando: drawings, engineering, HOA approvals, permit submission, and project management through CO.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Orlando 2026

What drives ADU cost: the structural work involved, the condition of the existing space, how far utilities must run, and your finish level. These ranges cover design, permits, and the CO, not just construction. You get one written total before committing.

$40K – $65K
Garage conversion

Existing structure

Converting an attached or detached garage is the shortest route to a CO'd unit in Orlando, since the walls, roof, and footprint already exist.

  • Permit-ready plans
  • Flooring and insulation upgrade
  • Bathroom and kitchenette plumbing
  • HVAC and electrical work
  • Certificate of occupancy
$110K – $180K+
Large or custom ADU

Full dwelling unit

A detached ADU of 750–1,200+ sq ft with a full kitchen, one or two bedrooms and baths, a laundry hookup, and upgraded finishes. Built for long-term rental income or a permanent family suite.

  • Larger floor plan
  • Bedrooms and baths to suit
  • Full kitchen and appliances
  • Laundry hookup
  • Quality finishes
  • CO and project documents

Orlando / Orange County · What property owners need to know

Why ADU permitting in Orlando requires a licensed GC

ADU rules here are set by each local government, not by a statewide mandate — and the wind code is lighter here than South Florida, which means the real cost drivers are jurisdiction and impact fees, not hurricane glass.

Dual Jurisdiction: City vs. County

The City of Orlando runs its own Building & Permit Services department — separate from Orange County's Building Division. Lake Nona, Dr. Phillips, and Windermere are unincorporated Orange County, not City of Orlando, even though people call the whole area "Orlando." ADU zoning rules differ between the two, and the permit has to go to the correct office. We confirm jurisdiction before we quote — not after you've paid for drawings.

Inland Wind Code — 140-150 mph

Orange County's inland location puts the ultimate design wind speed around 140–150 mph under the Florida Building Code — well below the HVHZ counties and the Gulf Coast, which means lower-cost window and door products often meet code here. We still verify the exact figure for your parcel, since Exposure Category and nearby open terrain can shift the number.

HOA Restrictions

A significant share of Orange County homes — especially in Lake Nona, Dr. Phillips, Windermere, and Horizon West — are in HOA communities with restrictions on ADU construction, including setbacks from property lines, exterior materials, roofline requirements, and architectural review timelines of 30–60 days. We review your HOA or condo association documents and CC&Rs before any money is spent on design. Building without approval is a covenant violation with real legal exposure.

Impact Fees: $8,000–$18,000

Detached ADUs require electrical service (new sub-panel or meter), water connection, and sewer tap. In Orange County, impact fees for new construction can run $8,000–$18,000 on top of utility connection costs — and the City of Orlando's separate $10,000 workforce-housing rebate program can offset a meaningful share of that if your tenant qualifies. We include the full fee assessment and rebate eligibility in your written scope.

No CO, No Legal Rental

An unpermitted "in-law suite" can't be legally rented, has no standing at resale, and can jeopardize your homeowner's insurance. We build every Orlando-area ADU toward a certificate of occupancy at close-out — the permit timeline is ours to manage, and the project isn't done until the CO is in your hands.

One Contract, Soup to Nuts

Jurisdiction confirmation, architectural drawings, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself, now available across Orlando and all of Orange County.

On the Ground in Orlando / Orange County

What ADU builders navigate in the Orlando market

We bring the same feasibility-first ADU process we built in South Florida to Orlando. Here is what shapes every project here.

Zoning by Jurisdiction

  • Orange County unincorporated (Lake Nona, Dr. Phillips, Windermere): ADU eligibility is set by Orange County's code and confirmed per parcel
  • City of Orlando: separate ADU ordinance with its own design and setback standards
  • Winter Park: ADUs permitted; historic-district review adds another layer for some parcels
  • Kissimmee and Apopka: each run separate application processes through city planning

What the Schedule Looks Like

  • Jurisdiction review and feasibility: 1–2 weeks
  • Design and engineering phase: 4–8 weeks
  • Permit review: 4–12 weeks, depending on the jurisdiction
  • Construction for a garage conversion runs 8–14 weeks
  • Build time, detached ADU: 16–28 weeks
  • Closeout, final inspections, and CO: 1–3 weeks

Line Items to Expect

  • Impact fees (Orange County, new detached ADU): $8,000–$18,000
  • Utility connection work (electrical sub-panel, water, sewer) runs $3,000–$12,000
  • Our scope includes architectural drawings ($4,000–$12,000)
  • Included in our scope: structural engineering at $2,000–$6,000
  • Permit fees, $1,200–$3,500, are part of our scope

Common Use Cases

  • Rental income unit — Kissimmee, Hunters Creek, Pine Hills
  • In-law or family suite — Windermere and Dr. Phillips primary homes
  • Short-term rental / investment ADU — common near the Kissimmee tourist corridor
  • Home office + guest space combo — Lake Nona and Horizon West

Because wind load isn't the cost driver here that it is on the coasts, the biggest variable in an Orlando ADU budget is which office reviews your permit. City of Orlando and Orange County run separate Building Divisions with separate timelines, and Lake Nona, Dr. Phillips, and Windermere fall under the county even though people call the whole area "Orlando." We confirm jurisdiction in week one.

From there, impact fees are the number worth planning around — $8,000–$18,000 for a new detached unit. The City of Orlando's $10,000 workforce-housing rebate can offset a real share of that if your ADU qualifies, which is a detail most online estimates never mention. We check your eligibility and put every fee in writing before you sign.

Service Area

ADU & garage conversions throughout Orlando and Orange County

From Winter Park to Kissimmee — Orlando and Orange County is our Central Florida market, backed by 10+ years of licensed GC experience in Florida.

OrlandoWinter ParkKissimmeeApopkaOcoeeWinter GardenDr. PhillipsLake Nona

Common questions

What Orlando homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Orlando.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬