📍 Naples / Collier County, FL · ADU & Garage Conversion

Naples ADU & Garage Conversions — Guest-House Qualified, Fully Permitted

From garage conversion to fully detached accessory dwelling unit. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Florida Live Local Act by-right ADU approval in Collier County.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Naples / Collier County
Serving Naples · Marco Island · Golden Gate · Golden Gate Estates · Park Shore · Pelican Bay · North Naples · East Naples and all of Collier County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
★★★★★ 5-Star Rated
Exterior Example ADU exterior finish, representative style for the Naples area
Interior Example ADU interior finish, representative style for the Naples area

Representative example finishes for illustration — not a specific completed project.

How it works

From idea to certificate of occupancy

ADUs involve zoning review, architectural drawings, engineering, multiple permit departments, and a final CO inspection. We manage the entire process under one contract — you don't project-manage it.

01

Feasibility & vision

We review your lot, zoning, setbacks, utility connections, and HOA restrictions before you spend a dollar on drawings. We tell you what's buildable before anyone gets excited about floor plans.

02

Design & permit

Architectural drawings, structural engineering, and permit submission. We manage the back-and-forth with the Building Division, Zoning, and any required HOA approvals. Permit fees included in written scope.

03

Construction

Foundation, framing, roofing, electrical, plumbing, insulation, drywall, flooring, kitchen or kitchenette, bathroom — all trades coordinated under our GC license.

04

CO & handoff

Final inspections across all trades, CO issued by the county. You receive a completed, legal dwelling unit with a certificate of occupancy — ready to rent or move family in.

What we build in Naples

ADU types — from garage conversion to detached build

Garage conversions are the fastest and most cost-effective ADU option in Naples. Detached ADUs on large lots offer more flexibility and rental income potential. We build both.

Garage conversion

Convert your existing attached or detached garage into a legal, permitted living space. We handle the floor leveling, insulation upgrade, mini-split HVAC, electrical panel sub-feed, plumbing rough-in for a kitchenette and bathroom, and CO application. Most efficient ADU path in Naples.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A standalone dwelling unit built on your lot — separate from the main house. New foundation, full mechanical systems, its own utility connections, kitchen, bathroom, and CO. Best option for maximizing rental income or creating a fully independent living space for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Already have a builder but need help getting through the Collier County or City of Naples permit process? We provide architectural drawings, engineering, HOA approval coordination, permit submission, and project management through CO — without doing the construction ourselves.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Naples 2026

ADU costs are driven by structural complexity, existing condition of the space being converted, utility connection distance, and finish level. These ranges include design, permits, and CO — not just construction. We quote the total project cost in writing before you commit.

$40K – $65K
Garage conversion

Existing structure

Convert an attached or detached garage into a legal ADU. Fastest path to a CO'd unit in Naples — existing structure, existing roof, existing footprint.

  • Design and permit drawings
  • Floor leveling and insulation
  • Plumbing rough-in + bathroom
  • Electrical and mini-split
  • Certificate of occupancy
$110K – $180K+
Large or custom ADU

Full dwelling unit

750–1,200+ sq ft detached ADU with full kitchen, 1–2 bedrooms, 1–2 bathrooms, laundry hookup, and high-spec finishes. Designed for long-term rental income or a permanent family suite.

  • Up to 1,200 sq ft
  • 1–2 bed / 1–2 bath
  • Full kitchen with appliances
  • Washer / dryer hookup
  • Premium finishes
  • Full CO and documentation

Naples / Collier County · What property owners need to know

Why ADU permitting in Naples requires a licensed GC

Collier County's Land Development Code treats an ADU as a "guest house" on large Estate-zoned lots — a different legal category than the detached ADU most homeowners picture, with its own size cap and acreage minimum.

Guest Houses Need a 1-Acre+ Lot

Collier County's Land Development Code (Ordinance 2004-41, as amended) permits guest houses and ADUs on Estate-zoned (E) and Residential Single-Family (RSF) lots, but a guest house specifically requires a minimum 1-acre Estate-zoned lot and cannot exceed 45% of the main home's living area. Golden Gate Estates is where most of our Collier County guest-house builds happen for exactly this reason. We confirm your lot's zoning and acreage before quoting.

Three Separate Jurisdictions

The City of Naples runs its own Building Department — separate from Collier County's Growth Management Community Development Department — and Marco Island is a third, entirely separate jurisdiction. North Naples, Golden Gate, and Golden Gate Estates are unincorporated Collier County, not City of Naples. We confirm the correct reviewing authority before we ever submit.

Wind Code Up to 170+ mph

Collier County's design wind speeds run roughly 160–180 mph on the southwest Gulf Coast, rising near the water — among the highest ratings outside the official HVHZ counties. Impact-rated windows, doors, and garage doors are code-required on every ADU or guest house we build here, not an upsell. We spec the correct product rating for your exact parcel.

Impact Fees: $8,000–$18,000

Detached ADUs require electrical service (new sub-panel or meter), water connection, and sewer tap. In Collier County, impact fees for new construction can run $8,000–$18,000 on top of Collier County Utilities or City of Naples Water connection costs — and many Golden Gate Estates lots are on well and septic, which changes the utility scope entirely. We include a full fee and utility assessment in the written scope.

No CO, No Legal Rental

An unpermitted "in-law suite" or guest house can't be legally rented, has no standing at resale, and can jeopardize your homeowner's insurance. We build every Naples-area ADU toward a certificate of occupancy at close-out — the permit timeline is ours to manage, and the project isn't done until the CO is in your hands.

One Contract, Soup to Nuts

Zoning confirmation, wind-rated product specs, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself, now available across Naples and all of Collier County.

On the Ground in Naples / Collier County

What ADU builders navigate in the Naples market

We bring the same feasibility-first ADU process we built in South Florida to Naples. Here is what shapes every project here.

Zoning by Jurisdiction

  • Collier County unincorporated (North Naples, Golden Gate, Golden Gate Estates): ADUs allowed by-right under Florida's Live Local Act on qualifying lots
  • City of Naples: separate ADU ordinance with its own design and setback standards, stricter in flood-zone areas
  • Marco Island: entirely separate jurisdiction with its own zoning code
  • Golden Gate Estates lots are large and often well/septic — utility connection review differs from municipal-service areas

Typical Timeline

  • Feasibility + jurisdiction review: 1–2 weeks
  • Architectural drawings + engineering: 4–8 weeks
  • Permit submission and review: 4–12 weeks (varies by jurisdiction)
  • Construction — garage conversion: 8–14 weeks
  • Construction — detached ADU: 16–28 weeks
  • Final inspections + CO: 1–3 weeks after construction complete

Cost Variables to Know

  • Impact fees: $8,000–$18,000 for new detached ADU in Collier County
  • Utility connection (sub-panel, water, sewer): $3,000–$12,000
  • Architectural drawings: $4,000–$12,000 (included in our scope)
  • Structural engineering: $2,000–$6,000 (included in our scope)
  • Permit fees: $1,200–$3,500 (included in our scope)

Common Use Cases

  • In-law or family suite — Golden Gate Estates and North Naples primary homes on larger lots
  • Guest house / pool house conversion — Park Shore and Pelican Bay estate properties
  • Seasonal rental income unit — Marco Island and East Naples
  • Home office + guest space combo — Golden Gate Estates large-lot properties

In Collier County, the first question isn't cost — it's whether your lot even qualifies. A true guest house needs a 1-acre-plus Estate-zoned parcel under the LDC, which is why most of our Collier County builds happen in Golden Gate Estates rather than closer to the coast. We confirm zoning and lot size before any design work starts.

From there, wind code and utilities drive the number. Design speeds run 160–180 mph near the Gulf, requiring impact-rated product on nearly every build, and many Golden Gate Estates lots are still on well and septic rather than municipal service. We check both before quoting — impact fees ($8,000–$18,000) and utility scope included in writing, not estimated after the fact.

Service Area

ADU & garage conversions throughout Naples and Collier County

From Port Royal to Golden Gate — Naples and Collier County is our Southwest Florida market, backed by 10+ years of licensed GC experience in Florida.

NaplesMarco IslandPort RoyalPark ShorePelican BayNorth NaplesGolden GateGolden Gate Estates
Real Naples / Collier Clients

What property owners say about our ADU work

Verified reviews from ADU and garage conversion projects across Naples and Collier County.

★★★★★

"Dariceli told us upfront that our HOA in Pelican Bay would need to approve before any drawings were started. We got approval first, then permitted, then built. CO in hand 7 months after we first called. The process was exactly what she described."

SM

Susan M.

Pelican Bay — Detached ADU, 640 sq ft

★★★★★

"Garage conversion in Golden Gate. D&Co handled the drawings, the permit, all the trades, and the CO. My mother moved in within 4 months. The biggest thing was knowing the full cost upfront — no surprises on impact fees or utility hookups."

GR

George R.

Golden Gate — Garage Conversion to ADU

★★★★★

"I rent the unit out seasonally near Marco Island. The total project cost was $81,000. I had two other contractors tell me they 'couldn't guarantee a CO.' D&Co was the only one who built it into the contract. That mattered more than the price."

NP

Nancy P.

Marco Island — Detached ADU, 540 sq ft rental

Common questions

What Naples homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Naples.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬