📍 Naples / Collier County, FL · ADU & Garage Conversion

ADU & Garage Conversions — Licensed GC, Fully Permitted

From garage conversion to fully detached accessory dwelling unit. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Florida Live Local Act by-right ADU approval in Collier County.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Naples / Collier County
Serving Naples · Marco Island · Golden Gate · Golden Gate Estates · Park Shore · Pelican Bay · North Naples · East Naples and all of Collier County
Florida Licensed GC · CGC1531095
Design + Permits Included
Certificate of Occupancy Goal
Written Scope · Fixed Price
★★★★★ 5-Star Rated
Before ADU before — framing stage, Naples
After Completed ADU — modern detached unit, D&Co Homes, Naples

How it works

From idea to certificate of occupancy

ADUs involve zoning review, architectural drawings, engineering, multiple permit departments, and a final CO inspection. We manage the entire process under one contract — you don't project-manage it.

01

Feasibility & vision

We review your lot, zoning, setbacks, utility connections, and HOA restrictions before you spend a dollar on drawings. We tell you what's buildable before anyone gets excited about floor plans.

02

Design & permit

Architectural drawings, structural engineering, and permit submission. We manage the back-and-forth with the Building Division, Zoning, and any required HOA approvals. Permit fees included in written scope.

03

Construction

Foundation, framing, roofing, electrical, plumbing, insulation, drywall, flooring, kitchen or kitchenette, bathroom — all trades coordinated under our GC license.

04

CO & handoff

Final inspections across all trades, CO issued by the county. You receive a completed, legal dwelling unit with a certificate of occupancy — ready to rent or move family in.

What we build in Naples

ADU types — from garage conversion to detached build

Garage conversions are the fastest and most cost-effective ADU option in Naples. Detached ADUs on large lots offer more flexibility and rental income potential. We build both.

Garage conversion

Convert your existing attached or detached garage into a legal, permitted living space. We handle the floor leveling, insulation upgrade, mini-split HVAC, electrical panel sub-feed, plumbing rough-in for a kitchenette and bathroom, and CO application. Most efficient ADU path in Naples.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A standalone dwelling unit built on your lot — separate from the main house. New foundation, full mechanical systems, its own utility connections, kitchen, bathroom, and CO. Best option for maximizing rental income or creating a fully independent living space for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Already have a builder but need help getting through the Collier County or City of Naples permit process? We provide architectural drawings, engineering, HOA approval coordination, permit submission, and project management through CO — without doing the construction ourselves.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Naples 2026

ADU costs are driven by structural complexity, existing condition of the space being converted, utility connection distance, and finish level. These ranges include design, permits, and CO — not just construction. We quote the total project cost in writing before you commit.

$40K – $65K
Garage conversion

Existing structure

Convert an attached or detached garage into a legal ADU. Fastest path to a CO'd unit in Naples — existing structure, existing roof, existing footprint.

  • Design and permit drawings
  • Floor leveling and insulation
  • Plumbing rough-in + bathroom
  • Electrical and mini-split
  • Certificate of occupancy
$110K – $180K+
Large or custom ADU

Full dwelling unit

750–1,200+ sq ft detached ADU with full kitchen, 1–2 bedrooms, 1–2 bathrooms, laundry hookup, and high-spec finishes. Designed for long-term rental income or a permanent family suite.

  • Up to 1,200 sq ft
  • 1–2 bed / 1–2 bath
  • Full kitchen with appliances
  • Washer / dryer hookup
  • Premium finishes
  • Full CO and documentation

Naples / Collier County · What property owners need to know

Why ADU permitting in Naples requires a licensed GC

ADU projects in Collier County touch every trade and every permit department. The process takes months and requires coordination that a handyman or unlicensed contractor simply cannot legally perform.

Multiple Permit Types Required

An ADU typically requires a building permit, electrical permit, plumbing permit, and mechanical permit — all submitted and managed separately. Under a licensed GC permit, we pull all of these under one contract. The county inspects each trade separately. Without a GC managing this, homeowners end up coordinating 4+ separate contractor permits and inspections — and the CO doesn't issue until all of them close.

Dual Jurisdiction: City vs. County

The City of Naples runs its own Building Department — separate from Collier County's Growth Management Community Development Department. North Naples, Golden Gate, and Golden Gate Estates are unincorporated Collier County, not City of Naples, and Marco Island is a third, entirely separate jurisdiction. Florida's Live Local Act gives ADUs by-right zoning approval, but the permit still has to go to the correct office. We confirm jurisdiction before we quote — not after you've paid for drawings.

HOA Restrictions

A significant share of Naples-area homes — especially in Pelican Bay, Park Shore, and gated Golden Gate Estates communities — are in HOA communities with restrictions on ADU construction, including setbacks from property lines, exterior materials, roofline requirements, and architectural review timelines of 30–60 days. We review your HOA or condo association documents and CC&Rs before any money is spent on design. Building without approval is a covenant violation with real legal exposure.

Utility Connection & Impact Fee Complexity

Detached ADUs require electrical service (new sub-panel or meter), water connection, and sewer tap. In Collier County, impact fees for new construction can run $8,000–$18,000 on top of utility connection costs — costs that have nothing to do with construction and everything to do with municipal infrastructure. We include a full fee assessment in the written scope — not a rough estimate. You know what it costs before you sign anything.

The CO is What Matters

The certificate of occupancy is what makes an ADU legal to rent or occupy. Unpermitted "in-law suites" have no legal standing and create serious liability when you sell or insure the property. Every ADU we build targets a CO at close-out. The permit timeline is managed by us, and we don't consider a project finished until the CO is in your hands.

One Contract, Soup to Nuts

We provide architectural drawings, manage the permit, coordinate all trades, and deliver the CO. You have one contract and one point of contact — not a separate architect, engineer, plumber, electrician, and framer you hired off Craigslist. That's the value of a design-build licensed GC for a project this complex, now available across Naples and all of Collier County.

On the Ground in Naples / Collier County

What ADU builders navigate in the Naples market

We bring the same feasibility-first ADU process we built in South Florida to Naples. Here is what shapes every project here.

Zoning by Jurisdiction

  • Collier County unincorporated (North Naples, Golden Gate, Golden Gate Estates): ADUs allowed by-right under Florida's Live Local Act on qualifying lots
  • City of Naples: separate ADU ordinance with its own design and setback standards, stricter in flood-zone areas
  • Marco Island: entirely separate jurisdiction with its own zoning code
  • Golden Gate Estates lots are large and often well/septic — utility connection review differs from municipal-service areas

Typical Timeline

  • Feasibility + jurisdiction review: 1–2 weeks
  • Architectural drawings + engineering: 4–8 weeks
  • Permit submission and review: 4–12 weeks (varies by jurisdiction)
  • Construction — garage conversion: 8–14 weeks
  • Construction — detached ADU: 16–28 weeks
  • Final inspections + CO: 1–3 weeks after construction complete

Cost Variables to Know

  • Impact fees: $8,000–$18,000 for new detached ADU in Collier County
  • Utility connection (sub-panel, water, sewer): $3,000–$12,000
  • Architectural drawings: $4,000–$12,000 (included in our scope)
  • Structural engineering: $2,000–$6,000 (included in our scope)
  • Permit fees: $1,200–$3,500 (included in our scope)

Common Use Cases

  • In-law or family suite — Golden Gate Estates and North Naples primary homes on larger lots
  • Guest house / pool house conversion — Park Shore and Pelican Bay estate properties
  • Seasonal rental income unit — Marco Island and East Naples
  • Home office + guest space combo — Golden Gate Estates large-lot properties

The most common reason an ADU project stalls in Naples is a zoning or association issue discovered after the homeowner has already paid for drawings — or a flood-zone elevation requirement that changes the whole design. We spend the first 1–2 weeks on feasibility — jurisdiction, lot coverage, setbacks, minimum lot size, flood zone, utility capacity, and HOA or condo association review — before anyone draws a line. That's not extra overhead; it's the difference between a project that happens and one that dies after $15,000 in sunk design costs.

Impact fees and utility connection costs are the other surprise that low estimates omit. A detached ADU in Collier County can trigger $8,000–$18,000 in impact fees and $3,000–$12,000 in utility connection fees — costs that have nothing to do with construction and everything to do with municipal infrastructure. We identify every fee in writing before you sign, whether the project is in Collier County, City of Naples, or Marco Island. No surprises at permit issuance.

Service Area

ADU & garage conversions throughout Naples and Collier County

From Port Royal to Golden Gate — Naples and Collier County is our Southwest Florida market, backed by 14+ years of licensed GC experience in Florida.

NaplesMarco IslandPort RoyalPark ShorePelican BayNorth NaplesGolden GateGolden Gate Estates
Real Naples / Collier Clients

What property owners say about our ADU work

Verified reviews from ADU and garage conversion projects across Naples and Collier County.

★★★★★

"Dariceli told us upfront that our HOA in Pelican Bay would need to approve before any drawings were started. We got approval first, then permitted, then built. CO in hand 7 months after we first called. The process was exactly what she described."

SM

Susan M.

Pelican Bay — Detached ADU, 640 sq ft

★★★★★

"Garage conversion in Golden Gate. D&Co handled the drawings, the permit, all the trades, and the CO. My mother moved in within 4 months. The biggest thing was knowing the full cost upfront — no surprises on impact fees or utility hookups."

GR

George R.

Golden Gate — Garage Conversion to ADU

★★★★★

"I rent the unit out seasonally near Marco Island. The total project cost was $81,000. I had two other contractors tell me they 'couldn't guarantee a CO.' D&Co was the only one who built it into the contract. That mattered more than the price."

NP

Nancy P.

Marco Island — Detached ADU, 540 sq ft rental

Common questions

What Naples homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Naples.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com