Whether it's a garage conversion or a new detached accessory dwelling unit, we take it from first sketch to CO. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Collier County and city jurisdiction confirmed per parcel before we quote.
Free ADU Consultation
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
Representative example finishes for illustration — not a specific completed project.
Our ADU & Garage Conversion Work
How it works
Think of the project in four parts: figure out what is allowed, get the plans approved, build it, and get it inspected and certified. We take responsibility for all four.
Zoning, setbacks, utility access, and any HOA restrictions are checked up front, before design work starts.
Drawings and engineering are completed, permit applications are filed, and we deal with reviewers' questions until approval. Permit fees are built into the price you sign.
A coordinated crew handles structure, electrical, plumbing, insulation, drywall, flooring, and finish work.
Final inspections lead to the certificate of occupancy, the document that lets you legally rent or occupy the unit.
What we build in Naples
Most homeowners in Naples choose between converting the garage and building a new stand-alone unit. The garage route is normally faster and cheaper; a detached unit offers more room and income potential.
The conversion work includes a level floor, better insulation, mini-split HVAC, a new electrical sub-feed, plumbing rough-in for a kitchenette and full bath, and closing out the CO. For many Naples properties it is the most practical path.
A new building behind or beside the house, on its own foundation, with full systems, a kitchen, a bathroom, and separate utilities. It is the right fit when you want maximum rental income or a fully independent living space.
If you have a builder and need the approvals handled, we provide drawings, engineering, HOA coordination, permit filing, and project management to CO for Naples projects. We don't do the construction in this case.
Honest pricing
ADU pricing varies with structural complexity, the condition of what you are converting, utility distance, and finishes. Every range below already includes design, permits, and the CO, and we give you a single written figure before you commit.
The quickest path to a CO'd ADU in Naples: no new foundation, no new roof, no new footprint.
A 400–750 sq ft building with a new foundation, CBS or wood-frame structure, complete mechanical systems, kitchenette or full kitchen, a bathroom, and independent utility service.
A 750–1,200+ sq ft detached unit with a full kitchen, one or two bedrooms, one or two baths, laundry hookup, and high-spec finishes for long-term rental income or a family suite.
Naples / Collier County · What property owners need to know
Collier County's Land Development Code treats an ADU as a "guest house" on large Estate-zoned lots — a different legal category than the detached ADU most homeowners picture, with its own size cap and acreage minimum.
Collier County's Land Development Code (Ordinance 2004-41, as amended) permits guest houses and ADUs on Estate-zoned (E) and Residential Single-Family (RSF) lots, but a guest house specifically requires a minimum 1-acre Estate-zoned lot and cannot exceed 45% of the main home's living area. Golden Gate Estates is where most of our Collier County guest-house builds happen for exactly this reason. We confirm your lot's zoning and acreage before quoting.
The City of Naples runs its own Building Department — separate from Collier County's Growth Management Community Development Department — and Marco Island is a third, entirely separate jurisdiction. North Naples, Golden Gate, and Golden Gate Estates are unincorporated Collier County, not City of Naples. We confirm the correct reviewing authority before we ever submit.
Collier County's design wind speeds run roughly 160–180 mph on the southwest Gulf Coast, rising near the water — among the highest ratings outside the official HVHZ counties. Impact-rated windows, doors, and garage doors are code-required on every ADU or guest house we build here, not an upsell. We spec the correct product rating for your exact parcel.
Detached ADUs require electrical service (new sub-panel or meter), water connection, and sewer tap. In Collier County, impact fees for new construction can run $8,000–$18,000 on top of Collier County Utilities or City of Naples Water connection costs — and many Golden Gate Estates lots are on well and septic, which changes the utility scope entirely. We include a full fee and utility assessment in the written scope.
An unpermitted "in-law suite" or guest house can't be legally rented, has no standing at resale, and can jeopardize your homeowner's insurance. We build every Naples-area ADU toward a certificate of occupancy at close-out — the permit timeline is ours to manage, and the project isn't done until the CO is in your hands.
Zoning confirmation, wind-rated product specs, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself, now available across Naples and all of Collier County.
We bring the same feasibility-first ADU process we built in South Florida to Naples. Here is what shapes every project here.
In Collier County, the first question isn't cost — it's whether your lot even qualifies. A true guest house needs a 1-acre-plus Estate-zoned parcel under the LDC, which is why most of our Collier County builds happen in Golden Gate Estates rather than closer to the coast. We confirm zoning and lot size before any design work starts.
From there, wind code and utilities drive the number. Design speeds run 160–180 mph near the Gulf, requiring impact-rated product on nearly every build, and many Golden Gate Estates lots are still on well and septic rather than municipal service. We check both before quoting — impact fees ($8,000–$18,000) and utility scope included in writing, not estimated after the fact.
From Port Royal to Golden Gate — Naples and Collier County is our Southwest Florida market, backed by 10+ years of licensed GC experience in Florida.
Common questions
The process, the cost, what needs a permit, and what makes an ADU legal to rent in Naples.
Expect 4–8 weeks to get the drawings finished. Permit review by Collier County Growth Management Community Development or the City of Naples takes 4–12 weeks depending on scope complexity and jurisdiction. We watch the permit status and take the calls with the reviewing office on your behalf.
Your governing documents decide this. Many HOAs and communities in Naples — especially in Pelican Bay, Park Shore, and gated Golden Gate Estates enclaves — restrict or prohibit ADU construction — either by requiring architectural committee approval, specifying exterior material requirements, or prohibiting external dwelling units entirely. Florida's Live Local Act limits what local zoning can prohibit, but HOA covenants are a separate legal layer. Reading your governing documents is part of our feasibility step, before you spend anything on drawings.
The limits are local and vary with the zoning designation. The City of Naples, Marco Island, and unincorporated Collier County each have different rules on lot size, setbacks, and maximum ADU square footage relative to the main dwelling. Parcel review comes before the quote, so drawings are based on what is actually allowed.
ADU projects in Collier County typically include: impact fees ($8,000–$18,000 for new construction), utility connection fees ($3,000–$12,000), permit fees ($1,200–$3,500), and architectural drawings and engineering ($6,000–$18,000). We build every one of them into the written total, so nothing new shows up when the permit is issued. Any estimate that ignores these items understates what the project really costs.
Yes. Yes: CGC1531095 is our Florida Certified General Contractor license, valid for ADU design-build projects. Dariceli Kunhardt brings 10+ years of construction, development, and project management experience. Nothing we build is unpermitted; all of it is inspected under our license. Look it up on the Florida DBPR website to verify.
ADU cost in Naples and Collier County ranges from $40,000 for a basic garage conversion to $180,000+ for a custom detached unit with 2 bedrooms and premium finishes. Everything from design and permits to construction and CO is inside the number. The usual detached project of 400–650 sq ft costs $65,000–$110,000 in total.
Rental is only lawful after a certificate of occupancy is issued for the space as a residence. An unpermitted garage conversion is not a lawful rental, even when the finishes are excellent. Unpermitted space must be disclosed to buyers and can give your insurer grounds to deny claims. Every ADU we build is carried through to CO, so it is legal, insurable, and ready to rent on day one.
Ready to explore?
Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.
Prefer email? office@dandcohomes.com
More from D&Co — Naples