📍 Naples / Collier County, FL · ADU & Garage Conversion

Naples ADU & Garage Conversions — Guest-House Qualified, Fully Permitted

Whether it's a garage conversion or a new detached accessory dwelling unit, we take it from first sketch to CO. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Collier County and city jurisdiction confirmed per parcel before we quote.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Naples / Collier County

Free ADU Consultation

Get a Fast, No-Obligation Quote

Just your name and number — we'll call you back, usually within 24 hours.

No spam. We respond fast.

Serving Naples · Marco Island · Golden Gate · Golden Gate Estates · Park Shore · Pelican Bay · North Naples · East Naples and all of Collier County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
Exterior Example ADU exterior finish, representative style for the Naples area
Interior Example ADU interior finish, representative style for the Naples area

Representative example finishes for illustration — not a specific completed project.

How it works

ADU construction explained simply

Think of the project in four parts: figure out what is allowed, get the plans approved, build it, and get it inspected and certified. We take responsibility for all four.

01

What is allowed

Zoning, setbacks, utility access, and any HOA restrictions are checked up front, before design work starts.

02

Getting approved

Drawings and engineering are completed, permit applications are filed, and we deal with reviewers' questions until approval. Permit fees are built into the price you sign.

03

Getting it built

A coordinated crew handles structure, electrical, plumbing, insulation, drywall, flooring, and finish work.

04

Getting it certified

Final inspections lead to the certificate of occupancy, the document that lets you legally rent or occupy the unit.

What we build in Naples

Two ways to add a second dwelling

Most homeowners in Naples choose between converting the garage and building a new stand-alone unit. The garage route is normally faster and cheaper; a detached unit offers more room and income potential.

Garage conversion

The conversion work includes a level floor, better insulation, mini-split HVAC, a new electrical sub-feed, plumbing rough-in for a kitchenette and full bath, and closing out the CO. For many Naples properties it is the most practical path.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A new building behind or beside the house, on its own foundation, with full systems, a kitchen, a bathroom, and separate utilities. It is the right fit when you want maximum rental income or a fully independent living space.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

If you have a builder and need the approvals handled, we provide drawings, engineering, HOA coordination, permit filing, and project management to CO for Naples projects. We don't do the construction in this case.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Naples 2026

ADU pricing varies with structural complexity, the condition of what you are converting, utility distance, and finishes. Every range below already includes design, permits, and the CO, and we give you a single written figure before you commit.

$40K – $65K
Garage conversion

Existing garage

The quickest path to a CO'd ADU in Naples: no new foundation, no new roof, no new footprint.

  • Drawings and permit filing
  • Level floor and insulated envelope
  • Rough plumbing for bath and kitchenette
  • Mini-split and electrical sub-feed
  • Final inspection and CO
$110K – $180K+
Large or custom ADU

Premium detached ADU

A 750–1,200+ sq ft detached unit with a full kitchen, one or two bedrooms, one or two baths, laundry hookup, and high-spec finishes for long-term rental income or a family suite.

  • Spacious layout
  • Up to two bedrooms and baths
  • Full kitchen, appliances included
  • Washer and dryer connections
  • High-spec finish package
  • Certificate of occupancy and documents

Naples / Collier County · What property owners need to know

Why ADU permitting in Naples requires a licensed GC

Collier County's Land Development Code treats an ADU as a "guest house" on large Estate-zoned lots — a different legal category than the detached ADU most homeowners picture, with its own size cap and acreage minimum.

Guest Houses Need a 1-Acre+ Lot

Collier County's Land Development Code (Ordinance 2004-41, as amended) permits guest houses and ADUs on Estate-zoned (E) and Residential Single-Family (RSF) lots, but a guest house specifically requires a minimum 1-acre Estate-zoned lot and cannot exceed 45% of the main home's living area. Golden Gate Estates is where most of our Collier County guest-house builds happen for exactly this reason. We confirm your lot's zoning and acreage before quoting.

Three Separate Jurisdictions

The City of Naples runs its own Building Department — separate from Collier County's Growth Management Community Development Department — and Marco Island is a third, entirely separate jurisdiction. North Naples, Golden Gate, and Golden Gate Estates are unincorporated Collier County, not City of Naples. We confirm the correct reviewing authority before we ever submit.

Wind Code Up to 170+ mph

Collier County's design wind speeds run roughly 160–180 mph on the southwest Gulf Coast, rising near the water — among the highest ratings outside the official HVHZ counties. Impact-rated windows, doors, and garage doors are code-required on every ADU or guest house we build here, not an upsell. We spec the correct product rating for your exact parcel.

Impact Fees: $8,000–$18,000

Detached ADUs require electrical service (new sub-panel or meter), water connection, and sewer tap. In Collier County, impact fees for new construction can run $8,000–$18,000 on top of Collier County Utilities or City of Naples Water connection costs — and many Golden Gate Estates lots are on well and septic, which changes the utility scope entirely. We include a full fee and utility assessment in the written scope.

No CO, No Legal Rental

An unpermitted "in-law suite" or guest house can't be legally rented, has no standing at resale, and can jeopardize your homeowner's insurance. We build every Naples-area ADU toward a certificate of occupancy at close-out — the permit timeline is ours to manage, and the project isn't done until the CO is in your hands.

One Contract, Soup to Nuts

Zoning confirmation, wind-rated product specs, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself, now available across Naples and all of Collier County.

On the Ground in Naples / Collier County

What ADU builders navigate in the Naples market

We bring the same feasibility-first ADU process we built in South Florida to Naples. Here is what shapes every project here.

Zoning by Jurisdiction

  • Collier County unincorporated (North Naples, Golden Gate, Golden Gate Estates): ADU eligibility depends on county zoning and is confirmed per parcel
  • City of Naples: separate ADU ordinance with its own design and setback standards, stricter in flood-zone areas
  • Marco Island: entirely separate jurisdiction with its own zoning code
  • Golden Gate Estates lots are large and often well/septic — utility connection review differs from municipal-service areas

How Long It Takes

  • First step, feasibility and jurisdiction review (1–2 weeks)
  • Plan set with engineering: 4–8 weeks
  • Submittal through permit approval: 4–12 weeks (varies by jurisdiction)
  • Converting the garage: 8–14 weeks of construction
  • Constructing a stand-alone unit: 16–28 weeks
  • Inspections and the certificate of occupancy: 1–3 weeks once built

Cost Factors

  • Impact fees for a new detached ADU in Collier County: $8,000–$18,000
  • Plan for $3,000–$12,000 to connect sub-panel, water, and sewer
  • Architectural plans cost $4,000–$12,000; we include them
  • Structural design, $2,000–$6,000, is already in our price
  • Building permit costs: $1,200–$3,500, included in our scope

Common Use Cases

  • In-law or family suite — Golden Gate Estates and North Naples primary homes on larger lots
  • Guest house / pool house conversion — Park Shore and Pelican Bay estate properties
  • Seasonal rental income unit — Marco Island and East Naples
  • Home office + guest space combo — Golden Gate Estates large-lot properties

In Collier County, the first question isn't cost — it's whether your lot even qualifies. A true guest house needs a 1-acre-plus Estate-zoned parcel under the LDC, which is why most of our Collier County builds happen in Golden Gate Estates rather than closer to the coast. We confirm zoning and lot size before any design work starts.

From there, wind code and utilities drive the number. Design speeds run 160–180 mph near the Gulf, requiring impact-rated product on nearly every build, and many Golden Gate Estates lots are still on well and septic rather than municipal service. We check both before quoting — impact fees ($8,000–$18,000) and utility scope included in writing, not estimated after the fact.

Service Area

ADU & garage conversions throughout Naples and Collier County

From Port Royal to Golden Gate — Naples and Collier County is our Southwest Florida market, backed by 10+ years of licensed GC experience in Florida.

NaplesMarco IslandPort RoyalPark ShorePelican BayNorth NaplesGolden GateGolden Gate Estates

Common questions

What Naples homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Naples.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬