Garage-to-ADU conversions and ground-up detached units, delivered under a single licensed contract. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Lee County code.
Free ADU Consultation
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
Representative example finishes for illustration — not a specific completed project.
Our ADU & Garage Conversion Work
How it works
A garage or backyard unit touches zoning, drawings, engineering, several permit desks, and a final inspection. We run the whole sequence under one contract so you aren't coordinating it yourself.
We check your lot, zoning, setbacks, utility connections, and HOA rules before any money goes into drawings, so you know what is buildable up front.
We produce the architectural drawings and structural engineering, file the permit, and handle the back-and-forth with the building department, zoning, and any HOA. Permit fees are in the written scope.
Framing, roofing, electrical, plumbing, insulation, drywall, flooring, and the kitchenette and bathroom are all coordinated under our general contractor license.
Every trade is inspected and the certificate of occupancy is issued. You get a finished, legal unit that is ready for family or a tenant.
What we build in Lee County
A converted garage or a new detached unit can each become a legal rental or family suite. Which one fits depends on your lot, your budget, and what Lee County zoning allows.
Existing garage space becomes a legal dwelling with a new floor, insulation, mini-split HVAC, an electrical sub-panel, plumbing for a kitchenette and bathroom, and a CO. It tends to be the fastest and most economical ADU option in Lee County.
Free-standing unit with its own slab or foundation, mechanical systems, kitchen, bathroom, and utility service. Best for owners who want the most rental income or a separate home for relatives.
We can also work as your design and permitting team only. That covers drawings, engineering, permit applications, HOA coordination, and management through CO, while someone else builds.
Honest pricing
Costs are shaped by structural complexity, the existing space, the length of utility runs, and finish level. The figures include design, permits, and certificate of occupancy rather than construction alone, and we quote the full project in writing before you decide.
Turning an attached or detached garage into a legal ADU in Lee County is the fastest option because the roof, walls, and slab are already there.
A 400–750 sq ft detached ADU on a new foundation. CBS or frame structure, full systems, kitchenette or kitchen, bathroom, and its own utility connections.
A 750–1,200+ sq ft detached ADU with a full kitchen, up to two bedrooms and two baths, laundry hookup, and upgraded finishes for steady rental income or permanent family housing.
Lee County · What property owners need to know
Lee County's accessory dwelling rule caps unit size as a percentage of your home, not a flat number — and Cape Coral's sewer conversion program makes the utility question bigger here than almost anywhere else in Florida.
Unincorporated Lee County's Land Development Code Sec. 34-1177 allows one accessory apartment or ADU per single-family residence, with living area capped at 60% of the principal home's square footage and one extra off-street parking space required on-site. Full ADUs (as opposed to accessory apartments) are also subject to Lee Plan density limits and impact fees. We run this math against your actual house before quoting a design.
Cape Coral is mid-way through one of the largest utility-extension programs in the state, converting thousands of septic lots to municipal sewer in phases. Whether your lot already has a sewer stub or is still on septic changes your ADU's utility scope and cost substantially — and the city's assessment schedule for unconnected lots is a cost most quotes miss entirely. We check your parcel's utility-extension status before writing your scope.
Fort Myers, Cape Coral, Bonita Springs, and Estero each run independent building departments and zoning codes, separate from unincorporated Lee County review — and gated communities in Estero, Bonita Springs, and Cape Coral's canal-front neighborhoods commonly layer HOA restrictions on top of city code. We confirm jurisdiction and pull your HOA's CC&Rs before any design work starts.
Lee County's southwest Gulf Coast location puts ultimate design wind speeds in the 160–180 mph range depending on exposure and proximity to the coast — among the highest outside the official HVHZ counties. Impact-rated or shuttered openings are required by code on every ADU we build here. We spec the correct product rating for your address, not a one-size-fits-all number.
An unpermitted unit can't be legally rented, has no standing at resale, and can void your homeowner's insurance — and Lee County Code Enforcement actively cites unpermitted accessory structures. Every ADU we build targets a CO at close-out, and the project isn't done until it's in your hands.
LDC compliance, utility-status research, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself, now available across Lee County.
We bring the same feasibility-first ADU process we built in South Florida to Lee County. Here is what shapes every project in this county.
LDC Sec. 34-1177's 60%-of-home size cap is the first filter in unincorporated Lee County — a project that pencils out as an 800 sq ft unit on paper might only be legal at 500–600 sq ft once we run it against your actual house. We do that math in the feasibility step, before any design work starts.
Utility status is the other variable that swings cost. Cape Coral's phased septic-to-sewer conversion means your lot's connection cost depends entirely on whether sewer has reached your street yet — a detail generic online estimates can't account for. We check your parcel's utility-extension status and put the real number in writing, whether you're in Cape Coral, Fort Myers, Bonita Springs, or Estero.
From Fort Myers to Bonita Springs — Lee County is our Southwest Florida market, backed by 10+ years of licensed GC experience in Florida.
Common questions
The process, the cost, what needs a permit, and what makes an ADU legal to rent in Lee County.
ADU cost in Lee County ranges from $40,000 for a basic garage conversion to $180,000+ for a custom detached unit with 2 bedrooms and premium finishes. We quote the whole job, from design through permits and construction to CO. A typical detached ADU of 400–650 sq ft lands between $65,000–$110,000 all-in.
Only if the finished space carries a dwelling-unit certificate of occupancy. Even a well-built conversion is off the table as a rental if the work was never permitted. You also carry that liability into a sale, where it must be disclosed, and into your insurance policy. Closing out the CO is part of our scope, so the finished ADU is legal and insurable from move-in day.
Plan on 4–8 weeks for design and drawings. Permit review by Lee County Department of Community Development or the relevant city takes 4–12 weeks depending on scope complexity and jurisdiction. Some municipalities like Cape Coral have separate planning review for canal-lot properties before building permit submission. You won't be stuck on hold with the county; we monitor the application and handle corrections.
The deciding factor is what your association's documents say. Many HOAs and communities in Lee County restrict or prohibit ADU construction — either by requiring architectural committee approval, specifying exterior material requirements, or prohibiting external dwelling units entirely. Feasibility starts with your governing documents, well before any drawings are commissioned. Skipping approval creates a covenant violation that can be enforced against you.
Where you are and how the lot is zoned determine the setback and size limits. Fort Myers, Cape Coral, Bonita Springs, Estero, and unincorporated Lee County each have different rules on lot size, setbacks, and maximum ADU square footage relative to the main dwelling. Your parcel's own rules are checked first, ahead of the quote and ahead of any drawing fees.
ADU projects in Lee County typically include: impact fees ($5,000–$18,000 for new construction), sewer tap or septic fees ($3,000–$12,000), permit fees ($1,500–$6,000), and architectural drawings and engineering ($6,000–$18,000). All of them are accounted for in the written total project cost we give you up front. Be wary of a bid that says nothing about these fees; it is only part of the real cost.
Yes. Our Florida Certified General Contractor license, CGC1531095, authorizes ADU design-build work along with every other phase of residential and commercial construction. The company is led by Dariceli Kunhardt, who has 10+ years in the field. Our work is permitted and inspected, always under our GC license. Check the license on the DBPR website any time.
Ready to explore?
Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.
Prefer email? office@dandcohomes.com
More from D&Co — Lee County