📍 Jupiter, FL · ADU & Garage Conversion

Jupiter ADU & Garage Conversions — Guest Cottage Permitted, Fully Permitted

We build accessory dwelling units of every type, from garage conversions to new detached homes. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Palm Beach County code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Jupiter, FL

Free ADU Consultation

Get a Fast, No-Obligation Quote

Just your name and number — we'll call you back, usually within 24 hours.

No spam. We respond fast.

Serving Boca Raton · Delray Beach · West Palm Beach · Boynton Beach · Lake Worth · Wellington · Jupiter · Palm Beach Gardens and all of Palm Beach County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
Exterior Example ADU exterior finish, representative style for Palm Beach County
Interior Example ADU interior finish, representative style for Palm Beach County

Representative example finishes for illustration — not a specific completed project.

How it works

Four stages, one contract

Most ADU delays come from the handoffs between architect, engineer, permit office, and builder. Here the same team carries the project from the first site visit to the day the CO is issued.

01

Site review

Before drawings, we look at lot size, setbacks, zoning, where water, sewer, and power connect, and whether an HOA has a say. You hear what is realistic before anyone designs a floor plan.

02

Plans & approvals

Drawings, engineering, and the permit application are prepared together and submitted to the right offices. We answer reviewer comments and chase HOA sign-off; permit fees are priced into your scope.

03

Build

One schedule covers foundation or slab work, framing, mechanicals, finishes, and the kitchenette and bath, with every trade working under our license.

04

Final sign-off

Inspectors close out each trade and the certificate of occupancy is issued, which is what makes the space legal to live in or rent.

What we build in Palm Beach County

Garage conversion or new detached ADU?

Both routes end in a certificate of occupancy and a legal dwelling. In Palm Beach County, converting a garage costs less and usually moves faster, while a detached ADU gives you more floor area and flexibility.

Garage conversion

Our conversions include floor leveling, insulation, mini-split HVAC, a panel sub-feed, kitchenette and bathroom plumbing, and the CO paperwork. For many owners in Palm Beach County, this is the most direct route to a legal unit.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A new stand-alone structure with its own foundation, utilities, kitchen, and bath. It suits owners who want long-term rental income or a self-contained home for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Need only the paperwork side? We prepare drawings and engineering, line up HOA approvals, submit permits, and manage the process to CO for projects in Palm Beach County that another contractor will build.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Palm Beach County 2026

What you pay depends on how complicated the structure is, the state of the existing space, how far utilities need to run, and the finishes you pick. Each range here includes design, permitting, and the CO. You receive one written total before signing.

$40K – $65K
Garage conversion

Garage to ADU

Because the structure already exists, a conversion in Palm Beach County usually has the shortest timeline and lowest cost of any ADU.

  • Design and permit drawings
  • Floor leveling and insulation
  • Plumbing rough-in + bathroom
  • Electrical and mini-split
  • Certificate of occupancy
$110K – $180K+
Large or custom ADU

Detached full-size unit

750–1,200+ sq ft detached ADU with a full kitchen, one to two bedrooms, one to two bathrooms, laundry hookup, and high-spec finishes, designed for long-term rental or a family suite.

  • Up to 1,200 sq ft
  • 1–2 bed / 1–2 bath
  • Full kitchen with appliances
  • Washer / dryer hookup
  • Premium finishes
  • Full CO and documentation

Palm Beach County · Know this first

What makes Palm Beach County ADU permitting a job for a licensed GC

ADU rules for the county live in the ULDC's Accessory and Temporary Uses chapter. The coastal wind code, municipal differences, and high HOA density each bring real cost and risk that an unlicensed handyman can't manage.

"Guest Cottage" Status: A Conditional Use

Jupiter permits accessory dwelling units — called guest cottages in the Land Development Code — in certain residential zones as a conditional use, not a by-right one, capped at 800 sq ft or 40% of the principal structure. Short-term rental of the unit is also restricted under Florida's statewide STR registration rules. We confirm your zoning district's conditional-use eligibility before any design work begins.

Up to 175 mph in the Wind-Borne Debris Region

Palm Beach County is just north of the High-Velocity Hurricane Zone but still within the Wind-Borne Debris Region. Design wind speeds near the coast are about 165–175 mph and fall off inland. Impact-rated openings or engineered shutters are required, and we size them to your exact parcel.

Reviewed by the Town, Not the County

Jupiter maintains its own Land Development Code review, separate from unincorporated Palm Beach County — because guest cottages are a conditional use, the approval process involves a specific review step that a by-right ADU wouldn't require. We manage that conditional-use application alongside the building permit, not as an afterthought.

Sewer Connection: $3,000–$12,000

Detached units require a sub-panel or new meter, a water line, and a sewer tap. In Palm Beach County the tap fee is $3,000–$12,000 depending on the municipality. New detached ADUs also carry $5,000–$18,000 in impact fees, and both numbers appear in our written scope.

The CO Is What Makes It Legal

An unpermitted suite can't be legally rented, doesn't hold up at resale, and may put insurance coverage at risk. Our Palm Beach County ADUs are built toward a certificate of occupancy, with the permit schedule managed by us until it's in your hands.

One Contract for the Whole Job

ULDC review, product specs for the wind code, permit submittal, trade scheduling, and the CO are handled under a single agreement and one point of contact. It replaces the need to coordinate an architect, engineer, and separate trades, and we have done it in this county since 2019.

On the Ground in Jupiter, FL

What ADU builders navigate in Jupiter

We have been navigating ADU permitting in Palm Beach County since 2019, including Jupiter's guest cottage conditional-use process. Here is what shapes every project in this town.

Guest Cottage Requirements

  • Permitted as a conditional use in certain residential zones
  • Size capped at 800 sq ft or 40% of the principal structure
  • Short-term rental restricted under Florida STR registration rules
  • Requires conditional-use review, not a by-right permit
  • Reviewed by Planning & Zoning, (561) 741-2323

Project Timeline

  • Week 1–2: feasibility check and zoning review
  • Preparing drawings and engineering: 4–8 weeks
  • Permitting: 4–12 weeks, subject to the reviewing jurisdiction
  • Garage-to-ADU construction: 8–14 weeks
  • For a detached ADU, allow 16–28 weeks to build
  • Final inspections and CO issuance: 1–3 weeks after the build

What Drives the Total

  • Sewer connection: $3,000–$12,000 depending on municipality
  • In Palm Beach County, impact fees on new detached construction run $5,000–$18,000
  • Design drawings: $4,000–$12,000, included in our scope
  • Engineering ($2,000–$6,000) is built into our scope
  • We cover permit fees, $1,500–$6,000, within our scope

Common Use Cases

  • In-law or family suite — Jupiter Farms and Admirals Cove-area primary homes
  • Home office + guest space combo — Abacoa and Jupiter Country Club
  • Pool house conversion to legal dwelling — waterfront properties along the Loxahatchee River
  • Guest cottage for extended family — large-lot equestrian properties in Jupiter Farms

Jupiter's biggest trap isn't the size cap — it's the conditional-use review. Because guest cottages require conditional-use approval rather than a by-right permit, the first question on every Jupiter inquiry is what that approval process requires for your specific zoning district, not what the unit will cost. We run that check in week one, before a single drawing is started.

Once the conditional use is confirmed, the coastal wind code and the 800 sq ft / 40% cap are what shape the design. Impact-rated openings are code-required, and the floor plan has to work within that ceiling. We price the real number against your specific parcel before you sign anything.

Service Area

ADU & garage conversions throughout Jupiter, FL

From Abacoa to Jupiter Farms — Jupiter is part of our Palm Beach County market, backed by 10+ years of licensed GC experience in South Florida.

AbacoaJupiter FarmsJupiter Country ClubEgret LandingIndian CreekPennock Point

Common questions

What Jupiter homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Palm Beach County.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬