We build accessory dwelling units of every type, from garage conversions to new detached homes. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Palm Beach County code.
Free ADU Consultation
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
Representative example finishes for illustration — not a specific completed project.
Our ADU & Garage Conversion Work
How it works
Most ADU delays come from the handoffs between architect, engineer, permit office, and builder. Here the same team carries the project from the first site visit to the day the CO is issued.
Before drawings, we look at lot size, setbacks, zoning, where water, sewer, and power connect, and whether an HOA has a say. You hear what is realistic before anyone designs a floor plan.
Drawings, engineering, and the permit application are prepared together and submitted to the right offices. We answer reviewer comments and chase HOA sign-off; permit fees are priced into your scope.
One schedule covers foundation or slab work, framing, mechanicals, finishes, and the kitchenette and bath, with every trade working under our license.
Inspectors close out each trade and the certificate of occupancy is issued, which is what makes the space legal to live in or rent.
What we build in Palm Beach County
Both routes end in a certificate of occupancy and a legal dwelling. In Palm Beach County, converting a garage costs less and usually moves faster, while a detached ADU gives you more floor area and flexibility.
Our conversions include floor leveling, insulation, mini-split HVAC, a panel sub-feed, kitchenette and bathroom plumbing, and the CO paperwork. For many owners in Palm Beach County, this is the most direct route to a legal unit.
A new stand-alone structure with its own foundation, utilities, kitchen, and bath. It suits owners who want long-term rental income or a self-contained home for family.
Need only the paperwork side? We prepare drawings and engineering, line up HOA approvals, submit permits, and manage the process to CO for projects in Palm Beach County that another contractor will build.
Honest pricing
What you pay depends on how complicated the structure is, the state of the existing space, how far utilities need to run, and the finishes you pick. Each range here includes design, permitting, and the CO. You receive one written total before signing.
Because the structure already exists, a conversion in Palm Beach County usually has the shortest timeline and lowest cost of any ADU.
New 400–750 sq ft detached ADU: foundation, CBS or frame construction, full mechanical systems, kitchenette or full kitchen, bathroom, and separate utilities.
750–1,200+ sq ft detached ADU with a full kitchen, one to two bedrooms, one to two bathrooms, laundry hookup, and high-spec finishes, designed for long-term rental or a family suite.
Palm Beach County · Know this first
ADU rules for the county live in the ULDC's Accessory and Temporary Uses chapter. The coastal wind code, municipal differences, and high HOA density each bring real cost and risk that an unlicensed handyman can't manage.
Jupiter permits accessory dwelling units — called guest cottages in the Land Development Code — in certain residential zones as a conditional use, not a by-right one, capped at 800 sq ft or 40% of the principal structure. Short-term rental of the unit is also restricted under Florida's statewide STR registration rules. We confirm your zoning district's conditional-use eligibility before any design work begins.
Palm Beach County is just north of the High-Velocity Hurricane Zone but still within the Wind-Borne Debris Region. Design wind speeds near the coast are about 165–175 mph and fall off inland. Impact-rated openings or engineered shutters are required, and we size them to your exact parcel.
Jupiter maintains its own Land Development Code review, separate from unincorporated Palm Beach County — because guest cottages are a conditional use, the approval process involves a specific review step that a by-right ADU wouldn't require. We manage that conditional-use application alongside the building permit, not as an afterthought.
Detached units require a sub-panel or new meter, a water line, and a sewer tap. In Palm Beach County the tap fee is $3,000–$12,000 depending on the municipality. New detached ADUs also carry $5,000–$18,000 in impact fees, and both numbers appear in our written scope.
An unpermitted suite can't be legally rented, doesn't hold up at resale, and may put insurance coverage at risk. Our Palm Beach County ADUs are built toward a certificate of occupancy, with the permit schedule managed by us until it's in your hands.
ULDC review, product specs for the wind code, permit submittal, trade scheduling, and the CO are handled under a single agreement and one point of contact. It replaces the need to coordinate an architect, engineer, and separate trades, and we have done it in this county since 2019.
We have been navigating ADU permitting in Palm Beach County since 2019, including Jupiter's guest cottage conditional-use process. Here is what shapes every project in this town.
Jupiter's biggest trap isn't the size cap — it's the conditional-use review. Because guest cottages require conditional-use approval rather than a by-right permit, the first question on every Jupiter inquiry is what that approval process requires for your specific zoning district, not what the unit will cost. We run that check in week one, before a single drawing is started.
Once the conditional use is confirmed, the coastal wind code and the 800 sq ft / 40% cap are what shape the design. Impact-rated openings are code-required, and the floor plan has to work within that ceiling. We price the real number against your specific parcel before you sign anything.
From Abacoa to Jupiter Farms — Jupiter is part of our Palm Beach County market, backed by 10+ years of licensed GC experience in South Florida.
Common questions
The process, the cost, what needs a permit, and what makes an ADU legal to rent in Palm Beach County.
Getting from concept to permit-ready drawings usually takes 4–8 weeks. Permit review by Jupiter's Building Department takes 4–12 weeks depending on scope complexity, including the conditional-use review required for guest cottage approval before building permit submission. We own the follow-up with the building department, so you are not the one calling for status.
What your association's rules say is the deciding factor. Many HOAs in Jupiter restrict or prohibit ADU construction — either by requiring architectural committee approval, specifying exterior material requirements, or prohibiting external dwelling units entirely. Feasibility starts with your covenants, well before any drawings are commissioned. Skipping approval creates a covenant violation that can be enforced against you.
Limits on setbacks and size change from one jurisdiction and zone to the next. In unincorporated Palm Beach County under R-1 zoning, ADUs must typically be at least 5 feet from side and rear property lines and cannot exceed 1,200 sq ft or 40% of the main dwelling's square footage. Boca Raton, Delray Beach, West Palm Beach, and other cities each have different rules. Zoning for your exact parcel is confirmed before drawings are started.
ADU projects in Jupiter typically include: impact fees ($5,000–$18,000 for new construction), sewer tap fees ($3,000–$12,000), permit fees ($1,500–$6,000), and architectural drawings and engineering ($6,000–$18,000). Our written estimate carries all of them, so the number you approve is the number you pay. Quotes that leave these out look cheaper than they are.
Yes. D&Co is a Florida Certified General Contractor (CGC1531095), authorized for all phases of construction, ADUs included. Dariceli Kunhardt has spent 10+ years in construction, development, and project management in Palm Beach County. Everything is done to permit and passes inspection under our license. Florida DBPR's license search will confirm it.
ADU cost in Jupiter ranges from $40,000 for a basic garage conversion to $180,000+ for a custom detached unit with 2 bedrooms and premium finishes. Our numbers include design, permitting, the build itself, and CO closeout. Our most requested detached ADU, 400–650 sq ft, runs $65,000–$110,000 all-in.
Not unless the space has been issued a certificate of occupancy as a dwelling. Finish quality does not matter here: an unpermitted unit cannot be legally leased. Selling later means disclosing it, and an insurer may treat the space as uninsured. Our projects don't stop at framing: we finish through CO so you can insure and rent the unit immediately.
Ready to explore?
Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.
Prefer email? office@dandcohomes.com
More from D&Co — Jupiter, FL