📍 Jupiter, FL · ADU & Garage Conversion

Jupiter ADU & Garage Conversions — Guest Cottage Permitted, Fully Permitted

From garage conversion to fully detached accessory dwelling unit. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Palm Beach County code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Jupiter, FL
Serving Boca Raton · Delray Beach · West Palm Beach · Boynton Beach · Lake Worth · Wellington · Jupiter · Palm Beach Gardens and all of Palm Beach County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
★★★★★ 5-Star Rated
Exterior Example ADU exterior finish, representative style for Palm Beach County
Interior Example ADU interior finish, representative style for Palm Beach County

Representative example finishes for illustration — not a specific completed project.

How it works

From idea to certificate of occupancy

ADUs involve zoning review, architectural drawings, engineering, multiple permit departments, and a final CO inspection. We manage the entire process under one contract — you don't project-manage it.

01

Feasibility & vision

We review your lot, zoning, setbacks, utility connections, and HOA restrictions before you spend a dollar on drawings. We tell you what's buildable before anyone gets excited about floor plans.

02

Design & permit

Architectural drawings, structural engineering, and permit submission. We manage the back-and-forth with the Building Division, Zoning, and any required HOA approvals. Permit fees included in written scope.

03

Construction

Foundation, framing, roofing, electrical, plumbing, insulation, drywall, flooring, kitchen or kitchenette, bathroom — all trades coordinated under our GC license.

04

CO & handoff

Final inspections across all trades, CO issued by the county. You receive a completed, legal dwelling unit with a certificate of occupancy — ready to rent or move family in.

What we build in Palm Beach County

ADU types — from garage conversion to detached build

Garage conversions are the fastest and most cost-effective ADU option in Palm Beach County. Detached ADUs on large lots offer more flexibility and rental income potential. We build both.

Garage conversion

Convert your existing attached or detached garage into a legal, permitted living space. We handle the floor leveling, insulation upgrade, mini-split HVAC, electrical panel sub-feed, plumbing rough-in for a kitchenette and bathroom, and CO application. Most efficient ADU path in Palm Beach County.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A standalone dwelling unit built on your lot — separate from the main house. New foundation, full mechanical systems, its own utility connections, kitchen, bathroom, and CO. Best option for maximizing rental income or creating a fully independent living space for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Already have a builder but need help getting through the Palm Beach County permit process? We provide architectural drawings, engineering, HOA approval coordination, permit submission, and project management through CO — without doing the construction ourselves.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Palm Beach County 2026

ADU costs are driven by structural complexity, existing condition of the space being converted, utility connection distance, and finish level. These ranges include design, permits, and CO — not just construction. We quote the total project cost in writing before you commit.

$40K – $65K
Garage conversion

Existing structure

Convert an attached or detached garage into a legal ADU. Fastest path to a CO'd unit in Palm Beach County — existing structure, existing roof, existing footprint.

  • Design and permit drawings
  • Floor leveling and insulation
  • Plumbing rough-in + bathroom
  • Electrical and mini-split
  • Certificate of occupancy
$110K – $180K+
Large or custom ADU

Full dwelling unit

750–1,200+ sq ft detached ADU with full kitchen, 1–2 bedrooms, 1–2 bathrooms, laundry hookup, and high-spec finishes. Designed for long-term rental income or a permanent family suite.

  • Up to 1,200 sq ft
  • 1–2 bed / 1–2 bath
  • Full kitchen with appliances
  • Washer / dryer hookup
  • Premium finishes
  • Full CO and documentation

Palm Beach County · What property owners need to know

Why ADU permitting in Palm Beach County requires a licensed GC

Palm Beach County's ADU rules live in the Unified Land Development Code's Accessory and Temporary Uses chapter — and the coastal wind code, municipal patchwork, and HOA density here each add real cost and risk a handyman isn't equipped to manage.

"Guest Cottage" Status: A Conditional Use

Jupiter permits accessory dwelling units — called guest cottages in the Land Development Code — in certain residential zones as a conditional use, not a by-right one, capped at 800 sq ft or 40% of the principal structure. Short-term rental of the unit is also restricted under Florida's statewide STR registration rules. We confirm your zoning district's conditional-use eligibility before any design work begins.

Wind-Borne Debris Region, Up to 175 mph

Palm Beach County sits just north of Florida's High-Velocity Hurricane Zone but still falls in the Wind-Borne Debris Region, with ultimate design wind speeds reaching roughly 165–175 mph near the coast and tapering inland. Impact-rated windows, doors, and garage doors — or engineered shutters — are required by code, not a luxury upgrade. We size the correct product rating to your exact parcel, not a blanket spec.

Reviewed by the Town, Not the County

Jupiter maintains its own Land Development Code review, separate from unincorporated Palm Beach County — because guest cottages are a conditional use, the approval process involves a specific review step that a by-right ADU wouldn't require. We manage that conditional-use application alongside the building permit, not as an afterthought.

Sewer Tap Fees: $3,000–$12,000

Detached ADUs need a new electrical sub-panel or meter, a water connection, and a sewer tap — and in Palm Beach County that tap fee runs $3,000–$12,000 depending on municipality, on top of $5,000–$18,000 in impact fees for a new detached unit. We put both numbers in your written scope before you sign.

No CO, No Legal Rental

An unpermitted "in-law suite" can't be legally rented, has no standing at resale, and can jeopardize your homeowner's insurance. We build every Palm Beach County ADU toward a certificate of occupancy at close-out — the permit timeline is ours to manage, and the project isn't done until the CO is in your hands.

One Contract, Soup to Nuts

ULDC review, wind-rated product specs, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself. That's the design-build advantage, built on our track record in this county since 2019.

On the Ground in Jupiter, FL

What ADU builders navigate in Jupiter

We have been navigating ADU permitting in Palm Beach County since 2019, including Jupiter's guest cottage conditional-use process. Here is what shapes every project in this town.

Guest Cottage Requirements

  • Permitted as a conditional use in certain residential zones
  • Size capped at 800 sq ft or 40% of the principal structure
  • Short-term rental restricted under Florida STR registration rules
  • Requires conditional-use review, not a by-right permit
  • Reviewed by Planning & Zoning, (561) 741-2323

Typical Timeline

  • Feasibility + zoning review: 1–2 weeks
  • Architectural drawings + engineering: 4–8 weeks
  • Permit submission and review: 4–12 weeks (varies by jurisdiction)
  • Construction — garage conversion: 8–14 weeks
  • Construction — detached ADU: 16–28 weeks
  • Final inspections + CO: 1–3 weeks after construction complete

Cost Variables to Know

  • Sewer tap fees: $3,000–$12,000 depending on municipality
  • Impact fees: $5,000–$18,000 for new detached ADU in Palm Beach County
  • Architectural drawings: $4,000–$12,000 (included in our scope)
  • Structural engineering: $2,000–$6,000 (included in our scope)
  • Permit fees: $1,500–$6,000 (included in our scope)

Common Use Cases

  • In-law or family suite — Jupiter Farms and Admirals Cove-area primary homes
  • Home office + guest space combo — Abacoa and Jupiter Country Club
  • Pool house conversion to legal dwelling — waterfront properties along the Loxahatchee River
  • Guest cottage for extended family — large-lot equestrian properties in Jupiter Farms

Jupiter's biggest trap isn't the size cap — it's the conditional-use review. Because guest cottages require conditional-use approval rather than a by-right permit, the first question on every Jupiter inquiry is what that approval process requires for your specific zoning district, not what the unit will cost. We run that check in week one, before a single drawing is started.

Once the conditional use is confirmed, the coastal wind code and the 800 sq ft / 40% cap are what shape the design. Impact-rated openings are code-required, and the floor plan has to work within that ceiling. We price the real number against your specific parcel before you sign anything.

Service Area

ADU & garage conversions throughout Jupiter, FL

From Abacoa to Jupiter Farms — Jupiter is part of our Palm Beach County market, backed by 10+ years of licensed GC experience in South Florida.

AbacoaJupiter FarmsJupiter Country ClubEgret LandingIndian CreekPennock Point
Real Palm Beach County Clients

What property owners say about our ADU work

Verified reviews from ADU and garage conversion projects across our home market.

★★★★★

"Dariceli told us upfront that our HOA would need to approve before any drawings were started. We got approval first, then permitted, then built. CO in hand 7 months after we first called. The process was exactly what she described."

KP

Karen P.

Palm Beach Gardens — Detached ADU, 640 sq ft

★★★★★

"Garage conversion in Lake Worth. D&Co handled the drawings, the permit, all the trades, and the CO. My son moved in within 4 months. The biggest thing was knowing the full cost upfront — no surprises on impact fees or utility hookups."

FG

Frank G.

Lake Worth — Garage Conversion to ADU

★★★★★

"I rent the unit out for $2,100/month. The total project cost was $78,000. I had two other contractors tell me they 'couldn't guarantee a CO.' D&Co was the only one who built it into the contract. That mattered more than the price."

RN

Rachel N.

Boynton Beach — Detached ADU, 520 sq ft rental

Common questions

What Jupiter homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Palm Beach County.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬