We build accessory dwelling units of every type, from garage conversions to new detached homes. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Palm Beach County code.
Free ADU Consultation
Just your name and number — we'll call you back, usually within 24 hours.
No spam. We respond fast.
Representative example finishes for illustration — not a specific completed project.
Our ADU & Garage Conversion Work
How it works
Think of the project in four parts: figure out what is allowed, get the plans approved, build it, and get it inspected and certified. We take responsibility for all four.
Zoning, setbacks, utility access, and any HOA restrictions are checked up front, before design work starts.
Drawings and engineering are completed, permit applications are filed, and we deal with reviewers' questions until approval. Permit fees are built into the price you sign.
A coordinated crew handles structure, electrical, plumbing, insulation, drywall, flooring, and finish work.
Final inspections lead to the certificate of occupancy, the document that lets you legally rent or occupy the unit.
What we build in Palm Beach County
A garage conversion is often the most economical way to add a legal unit in Palm Beach County, while a detached ADU suits larger lots and longer-term income plans. We handle both start to finish.
Work includes leveling the floor, upgrading insulation, installing mini-split HVAC and an electrical sub-feed, roughing in plumbing for a kitchenette and bath, and finishing the CO application. Frequently the best-value ADU in Palm Beach County.
A new dwelling on its own foundation with complete systems, separate utilities, a kitchen, and a bath. Well suited to owners who want to maximize rent or create an independent space for family.
Design and permitting only is also available in Palm Beach County. We produce drawings and engineering, coordinate HOA approvals, file permits, and manage the project to CO while your own builder does the construction.
Honest pricing
Three levels of ADU, three price ranges. What moves a project within its range: how complex the structure is, what condition the existing space is in, how far utilities have to travel, and your finishes. Design, permits, and CO are included, and the total is written down before you commit.
A garage conversion reaches a certificate of occupancy fastest in Palm Beach County: existing structure, existing roof, existing footprint.
A 400–750 sq ft detached unit with a new foundation, CBS or frame build, full mechanical systems, a kitchenette or full kitchen, a bathroom, and its own utilities.
A 750–1,200+ sq ft detached unit with a full kitchen, one to two bedrooms and bathrooms, laundry hookup, and quality finishes, built for rental income or a family suite.
Palm Beach County · Before you build
The county regulates ADUs through the Unified Land Development Code's Accessory and Temporary Uses chapter. Add the coastal wind requirements, the many separate municipalities, and dense HOA communities, and you have a project that isn't a handyman job.
Boca Raton permits accessory dwelling units in R-1D zoning through its own city application process, distinct from unincorporated Palm Beach County's ULDC. The city also maintains large-lot Estate districts — R-E-1 (33,000 sq ft minimum) and R-E-2 (72,400 sq ft minimum, 300 ft minimum width) — where guest house allowances can differ meaningfully from standard single-family zoning. We confirm your exact district under Chapter 28 before any design work begins.
Palm Beach County sits just north of Florida's High-Velocity Hurricane Zone, though it is in the Wind-Borne Debris Region. Ultimate design winds near the coast are around 165–175 mph and decrease inland. Code requires impact-rated windows, doors, and garage doors, or engineered shutters. We match the rating to your parcel rather than using a blanket spec.
Boca Raton's large-lot Estate districts are home to some of the biggest guest-house and ADU projects we build in Palm Beach County — a 33,000+ sq ft lot in R-E-1 or a 72,400+ sq ft lot in R-E-2 opens up design options a standard 7,500 sq ft lot simply doesn't have room for. We size the project to what your specific lot and district actually allow.
Building a detached ADU means a new sub-panel or meter, water service, and a sewer tap. In Palm Beach County the tap costs $3,000–$12,000 depending on the municipality, with another $5,000–$18,000 in impact fees for a new detached unit. We put both in your written scope.
If an ADU has no CO, it can't legally be rented, it creates issues at resale, and it can put your homeowner's insurance in jeopardy. We aim every Palm Beach County ADU at a CO, manage the permit timeline, and stay until you have it.
We cover ULDC review, wind-rated product selection, permit submittal, trade coordination, and the CO in a single contract with one point of contact. You avoid hiring an architect, engineer, plumber, electrician, and framer separately. We've worked this way in the county since 2019.
We have been navigating ADU permitting in Palm Beach County since 2019, including Boca Raton's R-1D and Estate-district code. Here is what shapes every project in this city.
Boca Raton's biggest trap isn't the building code — it's matching your project to the right zoning district. Because R-1D and the large-lot R-E-1/R-E-2 Estate districts each allow different things, the first question on every Boca Raton inquiry is which district your parcel sits in and what size guest house or ADU it actually supports, not what the unit will cost. We run that check in week one, before a single drawing is started.
Once the district is confirmed, the coastal wind code sets the material budget — impact-rated openings are code-required at 165–175 mph near the water. On Estate lots, the bigger variable is often design scope, not code compliance. We price the real number against your specific parcel before you sign anything.
From Royal Palm Yacht & Country Club to Boca Square — Boca Raton is part of our Palm Beach County market, backed by 10+ years of licensed GC experience in South Florida.
Common questions
The process, the cost, what needs a permit, and what makes an ADU legal to rent in Palm Beach County.
Only when the county or city has signed off with a dwelling-unit certificate of occupancy. Finish quality does not matter here: an unpermitted unit cannot be legally leased. Unpermitted space must be disclosed to buyers and can give your insurer grounds to deny claims. We don't hand over a project until the CO is in hand, so there is nothing to fix before you rent.
Set aside 4–8 weeks for design before anything is submitted. Permit review by the Boca Raton Zoning Department takes 4–12 weeks depending on scope complexity, with separate planning review required for the city's R-1D application process before building permit submission. We own the follow-up with the building department, so you are not the one calling for status.
It varies by association, so read your covenants first. Many HOAs in Boca Raton restrict or prohibit ADU construction — either by requiring architectural committee approval, specifying exterior material requirements, or prohibiting external dwelling units entirely. Your HOA's documents get reviewed in our feasibility step, ahead of design spending. Going ahead without sign-off puts you in breach of your covenants, with real legal risk.
Rules on setbacks and unit size differ by zoning district and by city. In unincorporated Palm Beach County under R-1 zoning, ADUs must typically be at least 5 feet from side and rear property lines and cannot exceed 1,200 sq ft or 40% of the main dwelling's square footage. Boca Raton, Delray Beach, West Palm Beach, and other cities each have different rules. Before we price anything, we confirm what your lot allows.
ADU projects in Boca Raton typically include: impact fees ($5,000–$18,000 for new construction), sewer tap fees ($3,000–$12,000), permit fees ($1,500–$6,000), and architectural drawings and engineering ($6,000–$18,000). We build every one of them into the written total, so nothing new shows up when the permit is issued. If a contractor prices just the build and skips these fees, the number you see is incomplete.
Yes. Yes: CGC1531095 is our Florida Certified General Contractor license, valid for ADU design-build projects. Dariceli Kunhardt leads the company with 10+ years across construction, development, and project management in Palm Beach County. Nothing we build is unpermitted; all of it is inspected under our license. Florida DBPR's license search will confirm it.
ADU cost in Boca Raton ranges from $40,000 for a basic garage conversion to $180,000+ for a custom detached unit with 2 bedrooms and premium finishes. That range includes design work, permits, construction, and CO, rather than only the build. A 400–650 sq ft detached ADU, the most common size, totals $65,000–$110,000.
Ready to explore?
Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.
Prefer email? office@dandcohomes.com
More from D&Co — Boca Raton